You are on page 1of 69

Description: Contract No:

End TO End Test for RED670– 87L1-DIS/DEF Test


4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 1 of 69

1- Relay Data:

SN Item Details

1 Rated Current 1A
2 Rated Auxiliary Voltage 110-125 Vdc
3 Relay Type ABB RED670
4 Model No. 1MRK004810-DC
5 Serial No. T1914036
6 Local End DAWMAT AL-JANDAL BSP
7 Remote End JOUF-2 380/132/13.8 KV BSP
8 Circuit no. OHL CKT-2

2- Preliminary Checks:

No. Relay Checks Result

1 Check that Loopback is removed OK


2 Check that Settings are applied at RED670 OK
3 Check that alarms are reset at RED670 OK
4 Check fiber optical cable connection OK

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 2 of 69

3. Protection Function Tests


3.1 DISTANCE FUNCTION TEST
Simulation From Remote End (JOUF-2 380/132/13.8KV BSP)

Remote End Local End


S/S JOUF-2 380/132/13.8KV BSP DAWMAT AL-JANDAL BSP
Protection
Aux. Aux. FR
Function PROT. Indication FR Indication
I/O Relay LED SAS TRIGGER Relay LED SAS TRIGGER
In Panel In Panel
OHL JOUF-2 CKT-2 FPFM DEF CARRIER
RECEIVED
FPFM 67N-1 DEF CARRIER SEND OHL JOUF-2 CKT-2 FPFM DIST
CARRIER RECEIVED
FPFM 21-1 DIST ZONE-1 OPTD
CBF-1 PROTECTION INTIATED (MID
FPFM 21-1 DIST CARRIER SEND CB)
*Z1/AID 79 AUTO RECLOSER CENTRE OHL JOUF-2 CKT-2 CB K310 AUTO
DIS BREAKER INITIATED RECLOSER INITIATED
21-Z1 94F-1 TRIP 79 AUTO RECLOSER LINE *21/67N OHL JOUF-2 CKT-2 CB K330 AUTO
85R1-1
(R- IN 94F-1X *21/67N SECTION BREAKER INITIATED YES
85R1-1A
CARRIER RECLOSER INITIATED YES
PHASE) 85S1-1 CARRIE FPFM 94F-1 TRIP RELAY OPTD RECV CBF-1 INITIATED (BUS CB)
R SEND FPFM 85S1-1 FAST IT-1 RELAY OHL JOUF-2 CKT-2 85R1-1 FAST I/T-1
OPTD RECV. RELAY OPTD.
CBF-2 PROTECTION INITIATED (BUS
FPFM 21-1 DIST PH-R OPTD
CB)
380KV FAULT RECORDER CBF-2 PROTECTION INITIATED (MID
TRIGGERED CB)
CB K310 AUTO TRIP
CB K330 AUTO TRIP

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 3 of 69

*Zone1/
21-Z1 FPFM 21-1 DIST ZONE-1
AID DIS NO
(R- OUT - OPERATED NO -- -- --
TRIP
PHASE) FPFM 21-1 DIST PH-R OPTD

OHL JOUF-2 CKT-2 FPFM DEF CARRIER


RECEIVED
FPFM 67N-1 DEF CARRIER SEND OHL JOUF-2 CKT-2 FPFM DIST
CARRIER RECEIVED
FPFM 21-1 DIST ZONE-1 OPTD
CBF-1 PROTECTION INTIATED (MID
FPFM 21-1 DIST CARRIER SEND CB)
*Z1/AID 79 AUTO RECLOSER CENTRE OHL JOUF-2 CKT-2 CB K310 AUTO
DIS BREAKER INITIATED RECLOSER INITIATED
21-Z1 94F-1 TRIP 79 AUTO RECLOSER LINE *21/67N OHL JOUF-2 CKT-2 CB K330 AUTO
85R1-1
(Y- IN 94F-1X *21/67N SECTION BREAKER INITIATED YES
85R1-1A
CARRIER RECLOSER INITIATED YES
PHASE) 85S1-1 CARRIE FPFM 94F-1 TRIP RELAY OPTD RECV CBF-1 INITIATED (BUS CB)
R SEND FPFM 85S1-1 FAST IT-1 RELAY OHL JOUF-2 CKT-2 85R1-1 FAST I/T-1
OPTD RECV. RELAY OPTD.
CBF-2 PROTECTION INITIATED (BUS
FPFM 21-1 DIST PH-Y OPTD
CB)
380KV FAULT RECORDER CBF-2 PROTECTION INITIATED (MID
TRIGGERED CB)
CB K310 AUTO TRIP
CB K330 AUTO TRIP

*Zone1/
21-Z1 FPFM 21-1 DIST ZONE-1
AID DIS NO
(Y- OUT - OPERATED NO -- -- --
TRIP
PHASE) FPFM 21-1 DIST PH-Y OPTD

*Z1/AID *21/67N OHL JOUF-2 CKT-2 FPFM DEF CARRIER


21-Z1 IN 94F-1 FPFM 67N-1 DEF CARRIER SEND YES 85R1-1 YES
DIS CARRIER RECEIVED

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 4 of 69

OHL JOUF-2 CKT-2 FPFM DIST


CARRIER RECEIVED
FPFM 21-1 DIST ZONE-1 OPTD CBF-1 PROTECTION INTIATED (MID
CB)
FPFM 21-1 DIST CARRIER SEND
OHL JOUF-2 CKT-2 CB K310 AUTO
79 AUTO RECLOSER CENTRE RECLOSER INITIATED
BREAKER INITIATED OHL JOUF-2 CKT-2 CB K330 AUTO
TRIP
79 AUTO RECLOSER LINE RECLOSER INITIATED
*21/67N
94F-1X SECTION BREAKER INITIATED CBF-1 INITIATED (BUS CB)
(B-PHASE) CARRIE 85R1-1A RECV OHL JOUF-2 CKT-2 85R1-1 FAST I/T-1
85S1-1 FPFM 94F-1 TRIP RELAY OPTD
R SEND RECV. RELAY OPTD.
FPFM 85S1-1 FAST IT-1 RELAY
OPTD CBF-2 PROTECTION INITIATED (BUS
CB)
FPFM 21-1 DIST PH-B OPTD
CBF-2 PROTECTION INITIATED (MID
380KV FAULT RECORDER CB)
TRIGGERED CB K310 AUTO TRIP
CB K330 AUTO TRIP

*Zone1/
FPFM 21-1 DIST ZONE-1
21-Z1 AID DIS NO
OUT - OPERATED NO -- -- --
(B-PHASE) TRIP
FPFM 21-1 DIST PH-B OPTD

21-Z1 IN 94F-1 *Z1/AID FPFM DIST ZONE-1 OPERATED YES 85R1-1 *21/67N OHL JOUF-2 CKT-2 FPFM DIST YES
(3-PHASE) 94F-1X DIS FPFM 21-1 DIST CARRIER SEND 85R1-1A CARRIER CARRIER RECEIVED
85S1-1 TRIP 79 AUTORECLOSER CENTRE RECV OHL JOUF-2 CKT-2 CB K310 AUTO
RECLOSER INITIATED
*21/67N BREAKER INITIATED
OHL JOUF-2 CKT-2 CB K330 AUTO
CARRIE 79 AUTO RECLOSER LINE RECLOSER INITIATED
R SEND SECTION BREAKER INITIATED CBF-1 PROTECTION INTIATED (MID
*AR FPFM 85S1-1 FAT I/T-1 RELAY CB)
BLOCK OPTD CBF-1 INITIATED (BUS CB)
FPFM 94F-1 TRIP RELAY OPTD OHL JOUF-2 CKT-2 85R1-1 FAST I/T-1
FPFM 21-1 DIST PH-B OPTD RECV. RELAY OPTD.

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 5 of 69

CBF-2 PROTECTION INITIATED (BUS


CB)
FPFM 21-1 DIST PH-R OPTD CBF-2 PROTECTION INITIATED (MID
FPFM 21-1 DIST PH-Y OPTD CB)
380KV FAULT RECORDER CB K310 AUTO TRIP
TRIGGERED CB K330 AUTO TRIP

FPFM 21-1 DIST ZONE-1


OPERATED
*Zone1/
FPFM 21-1 DIST PH-B OPTD
AID DIS
21-Z1 FPFM 21-1 DIST PH-R OPTD NO
OUT - TRIP NO -- -- --
(3-PHASE) FPFM 21-1 DIST PH-Y OPTD
*AR
79 AUTO RECLOSER LINE
BLOCK
SECTION BREAKER OPERATION
BLOCKED
21-Z2 IN 86F1BU *Z2/ FPFM 21-1 DIST ZONE-2 YES 85R1-2 *21/67N OHL JOUF-2 CKT-2 DIST CARRIER YES
(R- 86F1BUX Z3/Z4 OPERATED 85R1-2A CARRIER RECEIVED
PHASE) 85S1-2 DEL FPFM 21-1 DIST CARRIER SEND 85R2-2 RECV CBF-1 PROTECTION INITIATED
85R2-2A
DIS FPFM 21-1 DIST PH-R OPTD (BUS CB)
TRIP 380KV FAULT RECORDER CBF-1 PROTECTION INITIATED
*21/67N TRIGGERED (MID BREAKER)
CARRIE FPFM 85S1-2 DELAYED I/T-1 OHL JOUF-2 CKT-2 85R1-2
R SEND RELAY OPTD DELAYED I/T-2 RECV. RELAY
FPSM 85S2-2 DELAYED I/T-2 OPTD
RELAY OPTD OPTD.
79 AUTO RECLOSER CENTRE OHL JOUF-2 CKT-2 CB K310
BREAKER OPERATION AUTORECLOSER BLOCKED
BLOCKED OHL JOUF-2 CKT-2 CB K330 79
79 AUTO RECLOSER LINE AUTORECLOSER BLOCKED
SECTION BREAKER OPERATION CBF-2 PROTECTION INITIATED
BLOCKED (BUS CB)

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 6 of 69

CBF-2 PROTECTION INITIATED


(MID CB)
CB K310 AUTO TRIP
FPFM 86F1-BU L.O.R OPERATED
CB K330 AUTO TRIP

*Z2/
Z3/Z4
21-Z2 FPFM 21-1 DIST ZONE-2
DEL NO
(R- OUT - OPERATED NO -- -- --
DIS
PHASE) FPFM 21-1 DIST PH-R OPTD
TRIP

21-Z2 IN 86F1BU *Z2/ FPFM 21-1 DIST ZONE-2 YES 85R1-2 *21/67N OHL JOUF-2 CKT-2 DIST CARRIER YES
(Y- 86F1BUX Z3/Z4 OPERATED 85R1-2A CARRIER RECEIVED
PHASE) 85S1-2 DEL FPFM 21-1 DIST CARRIER SEND 85R2-2 RECV CBF-1 PROTECTION INITIATED
85R2-2A
DIS FPFM DIST 21-1 PH-Y OPTD (BUS CB)
TRIP 380KV FAULT RECORDER CBF-1 PROTECTION INITIATED
*21/67N TRIGGERED (MID BREAKER)
CARRIE FPFM 85S1-2 DELAYED I/T-1 OHL JOUF-2 CKT-2 85R1-2
R SEND RELAY OPTD DELAYED I/T-2 RECV. RELAY
79 AUTO RECLOSER CENTRE OPTD
BREAKER OPERATION OPTD.
BLOCKED OHL JOUF-2 CKT-2 CB K310
79 AUTO RECLOSER LINE AUTORECLOSER BLOCKED
SECTION BREAKER OPERATION OHL JOUF-2 CKT-2 CB K330 79
BLOCKED AUTORECLOSER BLOCKED
FPFM 86F1-BU L.O.R OPERATED CBF-2 PROTECTION INITIATED
(BUS CB)
CBF-2 PROTECTION INITIATED
(MID CB)
CB K310 AUTO TRIP

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 7 of 69

CB K330 AUTO TRIP

*Z2/
21-Z2 Z3/Z4 FPFM 21-1 DIST ZONE-2
NO
(Y- OUT - DEL OPERATED NO -- -- --
PHASE) DIS FPFM 21-1 DIST PH-Y OPTD
TRIP
OHL JOUF-2 CKT-2 DIST CARRIER
RECEIVED
FPFM 21-1 DIST ZONE-2
CBF-1 PROTECTION INITIATED
OPERATED
(BUS CB)
FPFM 21-1 DIST CARRIER SEND
CBF-1 PROTECTION INITIATED
FPFM 21-1 DIST PH-B OPTD
(MID BREAKER)
*Z2/ 380KV FAULT RECORDER
OHL JOUF-2 CKT-2 85R1-2
Z3/Z4 TRIGGERED
DELAYED I/T-2 RECV. RELAY
DEL FPFM 85S1-2 DELAYED I/T-1
86F1BU OPTD
DIS RELAY OPTD 85R1-2 *21/67N
21-Z2 86F1BUX OHL JOUF-2 CKT-2 CB K310
IN TRIP FPSM 85S2-2 DELAYED I/T-2 YES 85R1-2A CARRIER YES
(B-PHASE) 85S1-2 AUTORECLOSER BLOCKED
*21/67N RELAY OPTD RECV
OHL JOUF-2 CKT-2 CB K330 79
CARRIE 79 AUTO RECLOSER CENTRE
AUTORECLOSER BLOCKED
R SEND BREAKER OPERATION
CBF-2 PROTECTION INITIATED
BLOCKED
(BUS CB)
79 AUTO RECLOSER LINE
CBF-2 PROTECTION INITIATED
SECTION BREAKER OPERATION
(MID CB)
BLOCKED
CB K310 AUTO TRIP
FPFM 86F1-BU L.O.R OPERATED
CB K330 AUTO TRIP

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 8 of 69

*Z2/
Z3/Z4 FPFM 21-1 DIST ZONE-2
21-Z2 NO
OUT - DEL OPERATED NO -- -- --
(B-PHASE)
DIS FPFM 21-1 DIST PH-B OPTD
TRIP

OHL JOUF-2 CKT-2 DIST CARRIER


RECEIVED
FPFM 21-1 DIST ZONE-2
CBF-1 PROTECTION INITIATED
OPERATED
(BUS CB)
FPFM 21-1 DIST CARRIER SEND
CBF-1 PROTECTION INITIATED
FPFM 21-1 DIST PH-R OPTD
(MID BREAKER)
*Z2/ FPFM 21-1 DIST PH-Y OPTD
OHL JOUF-2 CKT-2 85R1-2
Z3/Z4 FPFM 21-1 DIST PH-B OPTD
DELAYED I/T-2 RECV. RELAY
DEL 380KV FAULT RECORDER
86F1BU OPTD
DIS TRIGGERED 85R1-2 *21/67N
21-Z2 86F1BUX OHL JOUF-2 CKT-2 CB K310
IN TRIP FPFM 85S1-2 DELAYED I/T-1 YES 85R1-2A CARRIER YES
(3-PHASE) 85S1-2 AUTORECLOSER BLOCKED
*21/67N RELAY OPTD RECV
OHL JOUF-2 CKT-2 CB K330 79
CARRIE 79 AUTO RECLOSER CENTRE
AUTORECLOSER BLOCKED
R SEND BREAKER OPERATION
CBF-2 PROTECTION INITIATED
BLOCKED
(BUS CB)
79 AUTO RECLOSER LINE
CBF-2 PROTECTION INITIATED
SECTION BREAKER OPERATION
(MID CB)
BLOCKED
CB K310 AUTO TRIP
FPFM 86F1-BU L.O.R OPERATED
CB K330 AUTO TRIP

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 9 of 69

FPFM 21-1 DIST ZONE-2


*Z2/
OPERATED
Z3/Z4
21-Z2 FPFM 21-1 DIST PH-B OPTD NO
OUT - DEL NO -- -- --
(3-PHASE) FPFM 21-1 DIST PH-R OPTD
DIS
FPFM 21-1 DIST PH-Y OPTD
TRIP

CBF-1 PROTECTION INITIATED


(BUS CB)
FPFM 21-1 DIST ZONE-3 CBF-1 PROTECTION INITIATED
OPERATED (MID BREAKER)
FPFM 21-1 DIST PH-R OPTD OHL JOUF-2 CKT-2 85R1-2
380KV FAULT RECORDER DELAYED I/T-2 RECV. RELAY
*Z2/ TRIGGERED OPTD
86F1BU Z3/Z4 FPFM 85S1-2 DELAYED I/T-1 OHL JOUF-2 CKT-2 CB K310
21-Z3 85R1-2
86F1BUX DEL RELAY OPTD 85R1-2A
AUTORECLOSER BLOCKED
(R- IN YES -- YES
85S1-2 DIS 79 AUTO RECLOSER CENTRE OHL JOUF-2 CKT-2 CB K330 79
PHASE)
TRIP BREAKER OPERATION AUTORECLOSER BLOCKED
BLOCKED CBF-2 PROTECTION INITIATED
79 AUTO RECLOSER LINE (BUS CB)
SECTION BREAKER OPERATION CBF-2 PROTECTION INITIATED
BLOCKED (MID CB)
FPFM 86F1-BU L.O.R OPERATED CB K310 AUTO TRIP
CB K330 AUTO TRIP

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 10 of 69

*Z2/
Z3/Z4
21-Z3 FPFM 21-1 DIST ZONE-3
DEL NO
(R- OUT - OPERATED NO -- -- --
DIS
PHASE) FPFM 21-1 DIST PH-R OPTD
TRIP

CBF-1 PROTECTION INITIATED


(BUS CB)
FPFM 21-1 DIST ZONE-3 CBF-1 PROTECTION INITIATED
OPERATED (MID BREAKER)
FPFM 21-1 DIST PH-Y OPTD OHL JOUF-2 CKT-2 85R1-2
380KV FAULT RECORDER DELAYED I/T-2 RECV. RELAY
*Z2/ TRIGGERED OPTD
86F1BU Z3/Z4 FPFM 85S1-2 DELAYED I/T-1 OHL JOUF-2 CKT-2 CB K310
21-Z3 85R1-2
86F1BUX DEL RELAY OPTD AUTORECLOSER BLOCKED
(Y- IN YES 85R1-2A -- YES
85S1-2 DIS 79 AUTO RECLOSER CENTRE OHL JOUF-2 CKT-2 CB K330 79
PHASE)
TRIP BREAKER OPERATION AUTORECLOSER BLOCKED
BLOCKED CBF-2 PROTECTION INITIATED
79 AUTO RECLOSER LINE (BUS CB)
SECTION BREAKER OPERATION CBF-2 PROTECTION INITIATED
BLOCKED (MID CB)
FPFM 86F1-BU L.O.R OPERATED CB K310 AUTO TRIP
CB K330 AUTO TRIP

*Z2/
21-Z3 Z3/Z4 FPFM 21-1 DIST ZONE-3
NO
(Y- OUT - DEL OPERATED NO -- -- --
PHASE) DIS FPFM 21-1 DIST PH-Y OPTD
TRIP

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 11 of 69

CBF-1 PROTECTION INITIATED


(BUS CB)
FPFM 21-1 DIST ZONE-3 CBF-1 PROTECTION INITIATED
OPERATED (MID BREAKER)
FPFM 21-1 DIST PH-B OPTD OHL JOUF-2 CKT-2 85R1-2
380KV FAULT RECORDER DELAYED I/T-2 RECV. RELAY
*Z2/ TRIGGERED OPTD
86F1BU Z3/Z4 FPFM 85S1-2 DELAYED I/T-1 OHL JOUF-2 CKT-2 CB K310
85R1-2
21-Z3 86F1BUX DEL RELAY OPTD 85R1-2A
AUTORECLOSER BLOCKED
IN YES -- YES
(B-PHASE) 85S1-2 DIS 79 AUTO RECLOSER CENTRE OHL JOUF-2 CKT-2 CB K330 79
TRIP BREAKER OPERATION AUTORECLOSER BLOCKED
BLOCKED CBF-2 PROTECTION INITIATED
79 AUTO RECLOSER LINE (BUS CB)
SECTION BREAKER OPERATION CBF-2 PROTECTION INITIATED
BLOCKED (MID CB)
FPFM 86F1-BU L.O.R OPERATED CB K310 AUTO TRIP
CB K330 AUTO TRIP

*Z2/
Z3/Z4 FPFM 21-1 DIST ZONE-3
21-Z3 NO
OUT - DEL OPERATED NO -- -- --
(B-PHASE)
DIS FPFM 21-1 DIST PH-B OPTD
TRIP

FPFM 21-1 DIST ZONE-3 CBF-1 PROTECTION INITIATED


*Z2/
OPERATED (BUS CB)
86F1BU Z3/Z4
FPFM 21-1 DIST PH-R OPTD 85R1-2 CBF-1 PROTECTION INITIATED
21-Z3 86F1BUX DEL 85R1-2A
IN FPFM 21-1 DIST PH-Y OPTD YES -- (MID BREAKER) YES
(3-PHASE) 85S1-2 DIS
FPFM 21-1 DIST PH-B OPTD OHL JOUF-2 CKT-2 85R1-2
TRIP
380KV FAULT RECORDER DELAYED I/T-2 RECV. RELAY
TRIGGERED OPTD

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 12 of 69

OHL JOUF-2 CKT-2 CB K310


FPFM 85S1-2 DELAYED I/T-1 AUTORECLOSER BLOCKED
RELAY OPTD OHL JOUF-2 CKT-2 CB K330 79
79 AUTO RECLOSER CENTRE AUTORECLOSER BLOCKED
BREAKER OPERATION CBF-2 PROTECTION INITIATED
BLOCKED (BUS CB)
79 AUTO RECLOSER LINE CBF-2 PROTECTION INITIATED
SECTION BREAKER OPERATION (MID CB)
BLOCKED CB K310 AUTO TRIP
FPFM 86F1-BU L.O.R OPERATED CB K330 AUTO TRIP

FPFM 21-1 DIST ZONE-3


*Z2/
OPERATED
Z3/Z4
21-Z3 FPFM 21-1 DIST PH-B OPTD NO
OUT - DEL NO -- -- --
(3-PHASE) FPFM 21-1 DIST PH-R OPTD
DIS
FPFM 21-1 DIST PH-Y OPTD
TRIP

21-Z4 IN 86F1BU *Z2/ FPFM 21-1 DIST ZONE-4 YES 85R1-2 -- CBF-1 PROTECTION INITIATED YES
(R- 86F1BUX Z3/Z4 OPERATED 85R1-2A (BUS CB)
PHASE) 85S1-2 DEL FPFM 21-1 DIST PH-R OPTD CBF-1 PROTECTION INITIATED
DIS 380KV FAULT RECORDER (MID BREAKER)
TRIP TRIGGERED OHL JOUF-2 CKT-2 85R1-2
FPFM 85S1-2 DELAYED I/T-1 DELAYED I/T-2 RECV. RELAY
RELAY OPTD OPTD
79 AUTO RECLOSER CENTRE OHL JOUF-2 CKT-2 CB K310
BREAKER OPERATION AUTORECLOSER BLOCKED
BLOCKED OHL JOUF-2 CKT-2 CB K330 79
79 AUTO RECLOSER LINE AUTORECLOSER BLOCKED
SECTION BREAKER OPERATION CBF-2 PROTECTION INITIATED

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 13 of 69

(BUS CB)
CBF-2 PROTECTION INITIATED
BLOCKED (MID CB)
FPFM 86F1-BU L.O.R OPERATED CB K310 AUTO TRIP
CB K330 AUTO TRIP

*Z2/
Z3/Z4
21-Z4 FPFM 21-1 DIST ZONE-4
DEL NO
(R- OUT - OPERATED NO -- -- --
DIS
PHASE) FPFM 21-1 DIST PH-R OPTD
TRIP

CBF-1 PROTECTION INITIATED


(BUS CB)
FPFM 21-1 DIST ZONE-4 CBF-1 PROTECTION INITIATED
OPERATED (MID BREAKER)
FPFM 21-1 DIST PH-Y OPTD OHL JOUF-2 CKT-2 85R1-2
380KV FAULT RECORDER DELAYED I/T-2 RECV. RELAY
*Z2/ TRIGGERED OPTD
86F1BU Z3/Z4 FPFM 85S1-2 DELAYED I/T-1 OHL JOUF-2 CKT-2 CB K310
21-Z4 85R1-2
86F1BUX DEL RELAY OPTD AUTORECLOSER BLOCKED
(Y- IN YES 85R1-2A -- YES
85S1-2 DIS 79 AUTO RECLOSER CENTRE OHL JOUF-2 CKT-2 CB K330 79
PHASE)
TRIP BREAKER OPERATION AUTORECLOSER BLOCKED
BLOCKED CBF-2 PROTECTION INITIATED
79 AUTO RECLOSER LINE (BUS CB)
SECTION BREAKER OPERATION CBF-2 PROTECTION INITIATED
BLOCKED (MID CB)
FPFM 86F1-BU L.O.R OPERATED CB K310 AUTO TRIP
CB K330 AUTO TRIP

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 14 of 69

*Z2/
21-Z4 Z3/Z4 FPFM 21-1 DIST ZONE-4
NO
(Y- OUT - DEL OPERATED NO -- -- --
PHASE) DIS FPFM 21-1 DIST PH-Y OPTD
TRIP

CBF-1 PROTECTION INITIATED


(BUS CB)
FPFM 21-1 DIST ZONE-4 CBF-1 PROTECTION INITIATED
OPERATED (MID BREAKER)
FPFM 21-1 DIST PH-B OPTD OHL JOUF-2 CKT-2 85R1-2
380KV FAULT RECORDER DELAYED I/T-2 RECV. RELAY
*Z2/ TRIGGERED OPTD
86F1BU Z3/Z4 FPFM 85S1-2 DELAYED I/T-1 OHL JOUF-2 CKT-2 CB K310
85R1-2
21-Z4 86F1BUX DEL RELAY OPTD 85R1-2A
AUTORECLOSER BLOCKED
IN YES -- YES
(B-PHASE) 85S1-2 DIS 79 AUTO RECLOSER CENTRE OHL JOUF-2 CKT-2 CB K330 79
TRIP BREAKER OPERATION AUTORECLOSER BLOCKED
BLOCKED CBF-2 PROTECTION INITIATED
79 AUTO RECLOSER LINE (BUS CB)
SECTION BREAKER OPERATION CBF-2 PROTECTION INITIATED
BLOCKED (MID CB)
FPFM 86F1-BU L.O.R OPERATED CB K310 AUTO TRIP
CB K330 AUTO TRIP

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 15 of 69

*Z2/
Z3/Z4 FPFM 21-1 DIST ZONE-4
21-Z4 NO
OUT - DEL OPERATED NO -- -- --
(B-PHASE)
DIS FPFM 21-1 DIST PH-B OPTD
TRIP

CBF-1 PROTECTION INITIATED


FPFM 21-1 DIST ZONE-4 (BUS CB)
OPERATED CBF-1 PROTECTION INITIATED
FPFM 21-1 DIST PH-R OPTD (MID BREAKER)
FPFM 21-1 DIST PH-Y OPTD OHL JOUF-2 CKT-2 85R1-2
FPFM 21-1 DIST PH-B OPTD DELAYED I/T-2 RECV. RELAY
*Z2/ 380KV FAULT RECORDER OPTD
86F1BU Z3/Z4 TRIGGERED OHL JOUF-2 CKT-2 CB K310
85R1-2
21-Z4 86F1BUX DEL FPFM 85S1-2 DELAYED I/T-1 85R1-2A
AUTORECLOSER BLOCKED
IN YES -- YES
(3-PHASE) 85S1-2 DIS RELAY OPTD OHL JOUF-2 CKT-2 CB K330 79
TRIP 79 AUTO RECLOSER CENTRE AUTORECLOSER BLOCKED
BREAKER OPERATION CBF-2 PROTECTION INITIATED
BLOCKED (BUS CB)
79 AUTO RECLOSER LINE CBF-2 PROTECTION INITIATED
SECTION BREAKER OPERATION (MID CB)
BLOCKED CB K310 AUTO TRIP
FPFM 86F1-BU L.O.R OPERATED CB K330 AUTO TRIP

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 16 of 69

FPFM 21-1 DIST ZONE-4


*Z2/
OPERATED
Z3/Z4
21-Z4 FPFM 21-1 DIST PH-B OPTD NO
OUT - DEL NO -- -- --
(3-PHASE) FPFM 21-1 DIST PH-R OPTD
DIS
FPFM 21-1 DIST PH-Y OPTD
TRIP

OHL JOUF-2 CKT-2 DIST CARRIER


RECEIVED
CBF-1 PROTECTION INITIATED
(BUS CB)
FPFM 21-1 DIST CARRIER SEND CBF-1 PROTECTION INITIATED
FPFM 21-1 DIST SOTF OPTD (MID BREAKER)
380KV FAULT RECORDER OHL JOUF-2 CKT-2 85R1-2
TRIGGERED DELAYED I/T-2 RECV. RELAY
*SOTF
FPFM 85S1-2 DELAYED I/T-1 OPTD
86F1-BU TRIP 85R1-2 *21/67N
86F1-BUX
RELAY OPTD OHL JOUF-2 CKT-2 CB K310
SOTF IN *21/67N YES 85R1-2A CARRIER YES
85S1-2 79 AUTORECLOSER LINE AUTORECLOSER BLOCKED
CS RECV
SECTION BREAKER OPERATIOIN OHL JOUF-2 CKT-2 CB K330 79
BLOCKED AUTORECLOSER BLOCKED
79 AUTORECLOSER CENTER CBF-2 PROTECTION INITIATED
BREAKER OPERATION (BUS CB)
BLOCKED CBF-2 PROTECTION INITIATED
FPFM 86F1-BU L.O.R OPERATED (MID CB)
CB K310 AUTO TRIP
CB K330 AUTO TRIP

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 17 of 69

*SOTF FPFM 21-1 DIST SOTF TRIP


SOTF OUT ----- NO ---- ---- -- NO
TRIP

OHL JOUF-2 CKT-2 DEF CARRIER


RECEIVED
CBF-1 PROTECTION INITIATED
FPFM 67N-1 DEF DELAYED OPTD (BUS CB)
FPFM 67N-1 DEF CARRIER SEND CBF-1 PROTECTION INITIATED
380KV FAULT RECORDER (MID BREAKER)
*67N TRIGGERED OHL JOUF-2 CKT-2 85R1-2
*86F1BU DEL FPFM 85S1-2 DELAYED I/T-1 DELAYED I/T-2 RECV. RELAY
67N-1 *86F1BU DEF RELAY OPTD OPTD
*21/67N
Delayed X TRIP 79 AUTORECLOSER LINE 85R1-2 OHL JOUF-2 CKT-2 CB K310
IN YES CARRIER YES
Forward *85S1-2 *21/67N SECTION BREAKER OPERATIOIN 85R1-2A AUTORECLOSER BLOCKED
RECV
DIR CARRIE BLOCKED OHL JOUF-2 CKT-2 CB K330 79
R SEND 79 AUTORECLOSER CENTER AUTORECLOSER BLOCKED
BREAKER OPERATION CBF-2 PROTECTION INITIATED
BLOCKED (BUS CB)
FPFM 86F1-BU L.O.R OPERATED CBF-2 PROTECTION INITIATED
(MID CB)
CB K310 AUTO TRIP
CB K330 AUTO TRIP

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 18 of 69

67N-1 *67N
Delayed DEL --
OUT NO TRIP FPFM 67N-1 DEF DELAYED OPTD NO -- -- NO
Forward DEF
DIR TRIP

67N-1
Delayed
IN -- -- -- NO -- -- -- NO
REVERSE
DIR

67N-1
Delayed
OUT -- -- -- NO -- -- -- NO
REVERSE
DIR

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 19 of 69

Simulation From Local End (DAWMAT AL-JANDAL BSP)

Local End Remote End


S/S DAWMAT AL-JANDAL BSP JOUF-2 380/132/13.8KV BSP
Protection
Aux. FR Aux. FR
Function PROT. Indication Indication
I/O Relay LED SAS TRIGG Relay LED SAS TRIGGER
In Panel ER In Panel
21-Z1 IN 94F-1 *Z1/AID OHL JOUF-2 CKT-2 DEF CARRIER YES 85R1-1 *21/67N FPFM PSE OLS-1 67N-1 CHANNEL-A YES
(R- 94F-1X DIS SEND 85R1-1A CARRIER RECEIVED
PHASE) 85S1-1 TRIP OHL JOUF-2 CKT-2 FPFM 21-1 DIST RECV FPFM PSE OLS-2 67N-1 CHANNEL-A
RECEIVED
*21/67N Z1 OPTD
FPFM PSE OLS-1 21-1 CHANNEL-A
CARRIE OHL JOUF-2 CKT-2 FPFM DIST RECEIVED
R SEND CARRIER SEND FPFM PSE OLS-2 21-1 CHANNEL-A
OHL JOUF-2 CKT-2 FPFM 21-1 DIST RECEIVED
R-PH OPTD FPFM 85R1-1 FAST I/T-1 RELAY OPTD
OHL JOUF-2 CKT-2 79 AUTO RECLOSER LINE SECTION
INSTANTANEOUS OPTD RELAY BREAKER INITIATED
94F1 OPTD. 79 AUTO RECLOSER CENTER
OHL JOUF-2 CKT-2 K310 BREAKER INITIATED.
FPFM 67N-1 DEF CARRIER RECEIVED
AUTORECLOSER INITIATED
FPFM 21-1 DIS CARRIER RECIEVED
OHL JOUF-2 CKT-2 K330 380KV FAULT RECORDER TRIGGERED
AUTORECLOSER INITIATED

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 20 of 69

CBF-1 PROTECTION INITIATION


(BUS CB)
CBF-1 PROTECTION INITIATION
(MID CB)
CBF-2 PROTECTION INITIATION
(BUS CB)
CBF-2 PROTECTION INITIATION
(MID CB)
CB K310 AUTO TRIP
CB K330 AUTO TRIP
OHL JOUF-2 CKT-2 85S1-1 FAST I/T-
1 SEND RELAY OPTD
380 KV FAULT RECORD
TRIGGERED

*Zone1/ OHL JOUF-2 CKT-2 FPFM 21-1 DIST


21-Z1
AID DIS Z1 OPTD NO
(R- OUT - NO -- -- --
TRIP OHL JOUF-2 CKT-2 FPFM 21-1 DIST
PHASE)
R-PH OPTD

21-Z1 IN 94F-1 *Z1/AID OHL JOUF-2 CKT-2 DEF CARRIER YES 85R1-1 *21/67N FPFM PSE OLS-1 67N-1 CHANNEL-A YES
(Y- 94F-1X DIS SEND 85R1-1A CARRIER RECEIVED
PHASE) 85S1-1 TRIP OHL JOUF-2 CKT-2 FPFM 21-1 DIST RECV FPFM PSE OLS-2 67N-1 CHANNEL-A
RECEIVED
*21/67N Z1 OPTD
FPFM PSE OLS-1 21-1 CHANNEL-A
CARRIE OHL JOUF-2 CKT-2 FPFM DIST RECEIVED
R SEND CARRIER SEND FPFM PSE OLS-2 21-1 CHANNEL-A
OHL JOUF-2 CKT-2 FPFM 21-1 DIST RECEIVED
Y-PH OPTD FPFM 85R1-1 FAST I/T-1 RELAY OPTD

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 21 of 69

OHL JOUF-2 CKT-2


INSTANTANEOUS OPTD RELAY
94F1 OPTD
OHL JOUF-2 CKT-2 K310
AUTORECLOSER INITIATED
OHL JOUF-2 CKT-2 K330
AUTORECLOSER INITIATED
CBF-1 PROTECTION INITIATION
(BUS CB) 79 AUTO RECLOSER LINE SECTION
CBF-1 PROTECTION INITIATION BREAKER INITIATED
(MID CB) 79 AUTO RECLOSER CENTER
BREAKER INITIATED.
CBF-2 PROTECTION INITIATION FPFM 67N-1 DEF CARRIER RECEIVED
(BUS CB) FPFM 21-1 DIS CARRIER RECIEVED
CBF-2 PROTECTION INITIATION 380KV FAULT RECORDER TRIGGERED
(MID CB)
CB K310 AUTO TRIP
CB K330 AUTO TRIP
OHL JOUF-2 CKT-2 85S1-1 FAST I/T-
1 SEND RELAY OPTD
380 KV FAULT RECORD
TRIGGERED

*Zone1/ OHL JOUF-2 CKT-2 FPFM 21-1 DIST


21-Z1
AID DIS Z1 OPTD NO
(Y- OUT - NO -- -- --
TRIP OHL JOUF-2 CKT-2 FPFM 21-1 DIST
PHASE)
Y-PH OPTD

*Z1/AID *21/67N FPFM PSE OLS-1 67N-1 CHANNEL-A


21-Z1 94F-1 OHL JOUF-2 CKT-2 DEF CARRIER 85R1-1
IN DIS YES
85R1-1A
CARRIER RECEIVED YES
(B-PHASE) 94F-1X SEND FPFM PSE OLS-2 67N-1 CHANNEL-A
TRIP RECV

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 22 of 69

OHL JOUF-2 CKT-2 FPFM 21-1 DIST


Z1 OPTD
OHL JOUF-2 CKT-2 FPFM DIST
CARRIER SEND
OHL JOUF-2 CKT-2 FPFM 21-1 DIST
B-PH OPTD
OHL JOUF-2 CKT-2
INSTANTANEOUS OPTD RELAY
94F1 OPTD RECEIVED
OHL JOUF-2 CKT-2 K310 FPFM PSE OLS-1 21-1 CHANNEL-A
AUTORECLOSER INITIATED RECEIVED
OHL JOUF-2 CKT-2 K330 FPFM PSE OLS-2 21-1 CHANNEL-A
AUTORECLOSER INITIATED RECEIVED
*21/67N FPFM 85R1-1 FAST I/T-1 RELAY OPTD
CBF-1 PROTECTION INITIATION
CARRIE 79 AUTO RECLOSER LINE SECTION
85S1-1 (BUS CB) BREAKER INITIATED
R SEND
CBF-1 PROTECTION INITIATION 79 AUTO RECLOSER CENTER
(MID CB) BREAKER INITIATED.
CBF-2 PROTECTION INITIATION FPFM 67N-1 DEF CARRIER RECEIVED
(BUS CB) FPFM 21-1 DIS CARRIER RECIEVED
CBF-2 PROTECTION INITIATION 380KV FAULT RECORDER TRIGGERED
(MID CB)
CB K310 AUTO TRIP
CB K330 AUTO TRIP
OHL JOUF-2 CKT-2 85S1-1 FAST I/T-
1 SEND RELAY OPTD
380 KV FAULT RECORD
TRIGGERED

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 23 of 69

*Zone1/ OHL JOUF-2 CKT-2 FPFM 21-1 DIST


21-Z1 AID DIS Z1 OPTD NO
OUT - NO -- -- --
(B-PHASE) TRIP OHL JOUF-2 CKT-2 FPFM 21-1 DIST
B-PH OPTD

21-Z1 IN 94F-1 *Z1/AID OHL JOUF-2 CKT-2 FPFM 21-1 DIST YES 85R1-1 *21/67N FPFM PSE OLS-1 67N-1 CHANNEL-A YES
(3-PHASE) 94F-1X DIS Z1 OPTD 85R1-1A CARRIER RECEIVED
85S1-1 TRIP OHL JOUF-2 CKT-2 FPFM DIST RECV FPFM PSE OLS-2 67N-1 CHANNEL-A
RECEIVED
*21/67N CARRIER SEND
FPFM PSE OLS-1 21-1 CHANNEL-A
CARRIE OHL JOUF-2 CKT-2 FPFM 21-1 DIST RECEIVED
R SEND R-PH OPTD FPFM PSE OLS-2 21-1 CHANNEL-A
*AR OHL JOUF-2 CKT-2 FPFM 21-1 DIST RECEIVED
BLOCK Y-PH OPTD FPFM 85R1-1 FAST I/T-1 RELAY OPTD
OHL JOUF-2 CKT-2 FPFM 21-1 DIST 79 AUTO RECLOSER LINE SECTION
B-PH OPTD BREAKER INITIATED
OHL JOUF-2 CKT-2 79 AUTO RECLOSER CENTER
INSTANTANEOUS OPTD RELAY BREAKER INITIATED.
FPFM 67N-1 DEF CARRIER RECEIVED
94F1 OPTD
FPFM 21-1 DIS CARRIER RECIEVED
OHL JOUF-2 CKT-2 K310 380KV FAULT RECORDER TRIGGERED
AUTORECLOSER INITIATED
OHL JOUF-2 CKT-2 K330
AUTORECLOSER INITIATED
CBF-1 PROTECTION INITIATION
(BUS CB)
CBF-1 PROTECTION INITIATION
(MID CB)
CBF-2 PROTECTION INITIATION
(BUS CB)
CBF-2 PROTECTION INITIATION
(MID CB)
CB K310 AUTO TRIP

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 24 of 69

CB K330 AUTO TRIP


OHL JOUF-2 CKT-2 85S1-1 FAST I/T-
1 SEND RELAY OPTD
OHL JOUF-2 CKT-2 CB K310 AUTO
RECLOSER BLOCKED
OHL JOUF-2 CKT-2 CB K330 AUTO
RECLOSER BLOCKED
380 KV FAULT RECORD
TRIGGERED

OHL JOUF-2 CKT-2 FPFM 21-1 DIST


Z1 OPTD
OHL JOUF-2 CKT-2 FPFM 21-1 DIST
R-PH OPTD
OHL JOUF-2 CKT-2 FPFM 21-1 DIST
Y-PH OPTD
*Zone1/
OHL JOUF-2 CKT-2 FPFM 21-1 DIST
AID DIS
21-Z1 B-PH OPTD NO
OUT - TRIP NO -- -- --
(3-PHASE) OHL JOUF-2 CKT-2 CB K310 AUTO
*AR
RECLOSER BLOCKED
BLOCK
OHL JOUF-2 CKT-2 CB K330 AUTO
RECLOSER BLOCKED

*Z2/ OHL JOUF-2 CKT-2 FPFM 21-1 DIST FPFM PSE OLS-1 21-1 CHANNEL
21-Z2 Z3/Z4 Z2 OPTD *21/67N RECEIVED
86FBU-1
85R1-2 FPFM PSE OLS-2 21-1 CHANNEL
(R- IN 86FBU-1X DEL OHL JOUF-2 CKT-2 FPFM DIST YES
85R1-2A
CARRIER RECEIVED
YES
PHASE) 85S1-2 DIS CARRIER SEND RECV FPFM 85R1-2 DELAYED I/T-1 RELAY
TRIP OHL JOUF-2 CKT-2 FPFM 21-1 DIST OPTD

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 25 of 69

R-PH OPTD
OHL JOUF-2 CKT-2 DELAY
LOCKOUT RELAY 86BU-1 OPTD
OHL JOUF-2 CKT-2 K310
AUTORECLOSER BLOCKED
OHL JOUF-2 CKT-2 K330
AUTORECLOSER BLOCKED
CBF-1 PROTECTION INITIATION
(BUS CB)
CBF-1 PROTECTION INITIATION
(MID CB) 79 AUTO RECLOSER LINE SECTION
*21/67N CBF-2 PROTECTION INITIATION BREAKER BLOCKED
79 AUTO RECLOSER CENTER
CARRIE (BUS CB) BREAKER BLOCKED
R SEND CBF-2 PROTECTION INITIATION FPFM 21-1 DIS CARRIER RECIEVED
(MID CB) 380KV FAULT RECORDER TRIGGERED
CB K310 CLOSING LOCKOUT
CB K330 CLOSING LOCKOUT
CB K310 AUTO TRIP
CB K330 AUTO TRIP
OHL JOUF-2 CKT-2 85S1-2
DELAYED I/T-1 SEND RELAY OPTD
380 KV FAULT RECORD
TRIGGERED

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 26 of 69

*Z2/
Z3/Z4 OHL JOUF-2 CKT-2 FPFM 21-1 DIST
21-Z2
DEL Z2 OPTD NO
(R- OUT - NO -- -- --
DIS OHL JOUF-2 CKT-2 FPFM 21-1 DIST
PHASE)
TRIP R-PH OPTD

21-Z2 IN 86FBU-1 *Z2/ OHL JOUF-2 CKT-2 FPFM 21-1 DIST YES 85R1-2 *21/67N FPFM PSE OLS-1 21-1 CHANNEL YES
(Y- 86FBU-1X Z3/Z4 Z2 OPTD 85R1-2A CARRIER RECEIVED
PHASE) 85S1-2 DEL OHL JOUF-2 CKT-2 FPFM DIST RECV FPFM PSE OLS-2 21-1 CHANNEL
RECEIVED
DIS CARRIER SEND
FPFM 85R1-2 DELAYED I/T-1 RELAY
TRIP OHL JOUF-2 CKT-2 FPFM 21-1 DIST OPTD
*21/67N Y-PH OPTD 79 AUTO RECLOSER LINE SECTION
CARRIE OHL JOUF-2 CKT-2 DELAY BREAKER BLOCKED
R SEND LOCKOUT RELAY 86BU-1 OPTD 79 AUTO RECLOSER CENTER
OHL JOUF-2 CKT-2 K310 BREAKER BLOCKED
AUTORECLOSER BLOCKED FPFM 21-1 DIS CARRIER RECIEVED
OHL JOUF-2 CKT-2 K330 380KV FAULT RECORDER TRIGGERED
AUTORECLOSER BLOCKED
CBF-1 PROTECTION INITIATION
(BUS CB)
CBF-1 PROTECTION INITIATION
(MID CB)
CBF-2 PROTECTION INITIATION
(BUS CB)
CBF-2 PROTECTION INITIATION
(MID CB)
CB K310 CLOSING LOCKOUT
CB K330 CLOSING LOCKOUT
CB K310 AUTO TRIP
CB K330 AUTO TRIP
OHL JOUF-2 CKT-2 85S1-2

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 27 of 69

DELAYED I/T-1 SEND RELAY OPTD


380 KV FAULT RECORD
TRIGGERED

*Z2/
Z3/Z4 OHL JOUF-2 CKT-2 FPFM 21-1 DIST
21-Z2
DEL Z2 OPTD NO
(Y- OUT - NO -- -- --
DIS OHL JOUF-2 CKT-2 FPFM 21-1 DIST
PHASE)
TRIP Y-PH OPTD

21-Z2 IN 86FBU-1 *Z2/ OHL JOUF-2 CKT-2 FPFM 21-1 DIST YES 85R1-2 *21/67N FPFM PSE OLS-1 21-1 CHANNEL YES
(B-PHASE) 86FBU-1X Z3/Z4 Z2 OPTD 85R1-2A CARRIER RECEIVED
85S1-2 DEL OHL JOUF-2 CKT-2 FPFM DIST RECV FPFM PSE OLS-2 21-1 CHANNEL
RECEIVED
DIS CARRIER SEND
FPFM 85R1-2 DELAYED I/T-1 RELAY
TRIP OHL JOUF-2 CKT-2 FPFM 21-1 DIST OPTD
*21/67N B-PH OPTD 79 AUTO RECLOSER LINE SECTION
CARRIE OHL JOUF-2 CKT-2 DELAY BREAKER BLOCKED
R SEND LOCKOUT RELAY 86BU-1 OPTD 79 AUTO RECLOSER CENTER
OHL JOUF-2 CKT-2 K310 BREAKER BLOCKED
AUTORECLOSER BLOCKED FPFM 21-1 DIS CARRIER RECIEVED
OHL JOUF-2 CKT-2 K330 380KV FAULT RECORDER TRIGGERED
AUTORECLOSER BLOCKED
CBF-1 PROTECTION INITIATION
(BUS CB)
CBF-1 PROTECTION INITIATION
(MID CB)
CBF-2 PROTECTION INITIATION
(BUS CB)
CBF-2 PROTECTION INITIATION
(MID CB)
CB K310 CLOSING LOCKOUT
CB K330 CLOSING LOCKOUT

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 28 of 69

CB K310 AUTO TRIP


CB K330 AUTO TRIP
OHL JOUF-2 CKT-2 85S1-2
DELAYED I/T-1 SEND RELAY OPTD
380 KV FAULT RECORD
TRIGGERED

*Z2/
Z3/Z4 OHL JOUF-2 CKT-2 FPFM 21-1 DIST
21-Z2 DEL Z2 OPTD NO
OUT - NO -- -- --
(B-PHASE) DIS OHL JOUF-2 CKT-2 FPFM 21-1 DIST
TRIP B-PH OPTD

21-Z2 IN 86FBU-1 *Z2/ OHL JOUF-2 CKT-2 FPFM 21-1 DIST YES 85R1-2 *21/67N FPFM PSE OLS-1 21-1 CHANNEL YES
(3-PHASE) 86FBU-1X Z3/Z4 Z2 OPTD 85R1-2A CARRIER RECEIVED
85S1-2 DEL OHL JOUF-2 CKT-2 FPFM DIST RECV FPFM PSE OLS-2 21-1 CHANNEL
RECEIVED
DIS CARRIER SEND
FPFM 85R1-2 DELAYED I/T-1 RELAY
TRIP OHL JOUF-2 CKT-2 FPFM 21-1 DIST OPTD
*21/67N R-PH OPTD 79 AUTO RECLOSER LINE SECTION
CARRIE OHL JOUF-2 CKT-2 FPFM 21-1 DIST BREAKER BLOCKED
R SEND Y-PH OPTD 79 AUTO RECLOSER CENTER
OHL JOUF-2 CKT-2 FPFM 21-1 DIST BREAKER BLOCKED
B-PH OPTD FPFM 21-1 DIS CARRIER RECIEVED
OHL JOUF-2 CKT-2 DELAY 380KV FAULT RECORDER TRIGGERED
LOCKOUT RELAY 86BU-1 OPTD
OHL JOUF-2 CKT-2 K310
AUTORECLOSER BLOCKED
OHL JOUF-2 CKT-2 K330
AUTORECLOSER BLOCKED

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 29 of 69

CBF-1 PROTECTION INITIATION


(BUS CB)
CBF-1 PROTECTION INITIATION
(MID CB)
CBF-2 PROTECTION INITIATION
(BUS CB)
CBF-2 PROTECTION INITIATION
(MID CB)
CB K310 CLOSING LOCKOUT
CB K330 CLOSING LOCKOUT
CB K310 AUTO TRIP
CB K330 AUTO TRIP
OHL JOUF-2 CKT-2 85S1-2
DELAYED I/T-1 SEND RELAY OPTD
OHL JOUF-2 CKT-2 CB K310 AUTO
RECLOSER BLOCKED
OHL JOUF-2 CKT-2 CB K330 AUTO
RECLOSER BLOCKED
380 KV FAULT RECORD
TRIGGERED

21-Z2 OUT - *Z2/ OHL JOUF-2 CKT-2 FPFM 21-1 DIST NO -- -- -- NO


(3-PHASE) Z3/Z4 Z2 OPTD
DEL OHL JOUF-2 CKT-2 FPFM 21-1 DIST
DIS R-PH OPTD
TRIP OHL JOUF-2 CKT-2 FPFM 21-1 DIST
Y-PH OPTD
OHL JOUF-2 CKT-2 FPFM 21-1 DIST
B-PH OPTD

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 30 of 69

OHL JOUF-2 CKT-2 FPFM 21-1 DIST


Z3 OPTD
OHL JOUF-2 CKT-2 FPFM 21-1 DIST
R-PH OPTD
OHL JOUF-2 CKT-2 DELAY
LOCKOUT RELAY 86BU-1 OPTD
OHL JOUF-2 CKT-2 K310
AUTORECLOSER BLOCKED
OHL JOUF-2 CKT-2 K330
AUTORECLOSER BLOCKED
CBF-1 PROTECTION INITIATION
(BUS CB) FPFM 85R1-2 DELAYED I/T-1 RELAY
*Z2/ OPTD
CBF-1 PROTECTION INITIATION
Z3/Z4 79 AUTO RECLOSER LINE SECTION
21-Z3 86FBU-1 (MID CB)
DEL 85R1-2 BREAKER BLOCKED
(R- IN 86FBU-1X CBF-2 PROTECTION INITIATION YES
85R1-2A
-- 79 AUTO RECLOSER CENTER YES
85S1-2 DIS
PHASE) (BUS CB) BREAKER BLOCKED
TRIP
CBF-2 PROTECTION INITIATION 380KV FAULT RECORDER TRIGGERED
(MID CB)
CB K310 CLOSING LOCKOUT
CB K330 CLOSING LOCKOUT
CB K310 AUTO TRIP
CB K330 AUTO TRIP
OHL JOUF-2 CKT-2 85S1-2
DELAYED I/T-1 SEND RELAY OPTD
380 KV FAULT RECORD
TRIGGERED

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 31 of 69

*Z2/
Z3/Z4 OHL JOUF-2 CKT-2 FPFM 21-1 DIST
21-Z3
DEL Z3 OPTD NO
(R- OUT - NO -- -- --
DIS OHL JOUF-2 CKT-2 FPFM 21-1 DIST
PHASE)
TRIP R-PH OPTD

21-Z3 IN 86FBU-1 *Z2/ OHL JOUF-2 CKT-2 FPFM 21-1 DIST YES 85R1-2 -- FPFM 85R1-2 DELAYED I/T-1 RELAY YES
(Y- 86FBU-1X Z3/Z4 Z3 OPTD 85R1-2A OPTD
PHASE) 85S1-2 DEL OHL JOUF-2 CKT-2 FPFM 21-1 DIST 79 AUTO RECLOSER LINE SECTION
BREAKER BLOCKED
DIS Y-PH OPTD
79 AUTO RECLOSER CENTER
TRIP OHL JOUF-2 CKT-2 DELAY BREAKER BLOCKED
LOCKOUT RELAY 86BU-1 OPTD 380KV FAULT RECORDER TRIGGERED
OHL JOUF-2 CKT-2 K310
AUTORECLOSER BLOCKED
OHL JOUF-2 CKT-2 K330
AUTORECLOSER BLOCKED
CBF-1 PROTECTION INITIATION
(BUS CB)
CBF-1 PROTECTION INITIATION
(MID CB)
CBF-2 PROTECTION INITIATION
(BUS CB)
CBF-2 PROTECTION INITIATION
(MID CB)
CB K310 CLOSING LOCKOUT
CB K330 CLOSING LOCKOUT
CB K310 AUTO TRIP
CB K330 AUTO TRIP
OHL JOUF-2 CKT-2 85S1-2
DELAYED I/T-1 SEND RELAY OPTD
380 KV FAULT RECORD
TRIGGERED

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 32 of 69

*Z2/
Z3/Z4 OHL JOUF-2 CKT-2 FPFM 21-1 DIST
21-Z3
DEL Z3 OPTD NO
(Y- OUT - NO -- -- --
DIS OHL JOUF-2 CKT-2 FPFM 21-1 DIST
PHASE)
TRIP Y-PH OPTD

21-Z3 IN 86FBU-1 *Z2/ OHL JOUF-2 CKT-2 FPFM 21-1 DIST YES 85R1-2 -- FPFM 85R1-2 DELAYED I/T-1 RELAY YES
(B-PHASE) 86FBU-1X Z3/Z4 Z3 OPTD 85R1-2A OPTD
85S1-2 DEL OHL JOUF-2 CKT-2 FPFM 21-1 DIST 79 AUTO RECLOSER LINE SECTION
BREAKER BLOCKED
DIS B-PH OPTD
79 AUTO RECLOSER CENTER
TRIP OHL JOUF-2 CKT-2 DELAY BREAKER BLOCKED
LOCKOUT RELAY 86BU-1 OPTD 380KV FAULT RECORDER TRIGGERED
OHL JOUF-2 CKT-2 K310
AUTORECLOSER BLOCKED
OHL JOUF-2 CKT-2 K330
AUTORECLOSER BLOCKED
CBF-1 PROTECTION INITIATION
(BUS CB)
CBF-1 PROTECTION INITIATION
(MID CB)
CBF-2 PROTECTION INITIATION
(BUS CB)
CBF-2 PROTECTION INITIATION
(MID CB)
CB K310 CLOSING LOCKOUT
CB K330 CLOSING LOCKOUT
CB K310 AUTO TRIP
CB K330 AUTO TRIP
OHL JOUF-2 CKT-2 85S1-2

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 33 of 69

DELAYED I/T-1 SEND RELAY OPTD


380 KV FAULT RECORD
TRIGGERED

*Z2/
Z3/Z4 OHL JOUF-2 CKT-2 FPFM 21-1 DIST
21-Z3 DEL Z3 OPTD NO
OUT - NO -- -- --
(B-PHASE) DIS OHL JOUF-2 CKT-2 FPFM 21-1 DIST
TRIP B-PH OPTD

21-Z3 IN 86FBU-1 *Z2/ OHL JOUF-2 CKT-2 FPFM 21-1 DIST YES 85R1-2 -- FPFM 85R1-2 DELAYED I/T-1 RELAY YES
(3-PHASE) 86FBU-1X Z3/Z4 Z3 OPTD 85R1-2A OPTD
85S1-2 DEL OHL JOUF-2 CKT-2 FPFM 21-1 DIST 79 AUTO RECLOSER LINE SECTION
BREAKER BLOCKED
DIS R-PH OPTD
79 AUTO RECLOSER CENTER
TRIP OHL JOUF-2 CKT-2 FPFM 21-1 DIST BREAKER BLOCKED
Y-PH OPTD 380KV FAULT RECORDER TRIGGERED
OHL JOUF-2 CKT-2 FPFM 21-1 DIST
B-PH OPTD
OHL JOUF-2 CKT-2 DELAY
LOCKOUT RELAY 86BU-1 OPTD
OHL JOUF-2 CKT-2 K310
AUTORECLOSER BLOCKED
OHL JOUF-2 CKT-2 K330
AUTORECLOSER BLOCKED
OHL JOUF-2 CKT-2 CB K330 79
AUTORECLOSER BLOCKED
CBF-1 PROTECTION INITIATION
(BUS CB)
CBF-1 PROTECTION INITIATION
(MID CB)

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 34 of 69

CBF-2 PROTECTION INITIATION


(BUS CB)
CBF-2 PROTECTION INITIATION
(MID CB)
CB K310 CLOSING LOCKOUT
CB K330 CLOSING LOCKOUT
CB K310 AUTO TRIP
CB K330 AUTO TRIP
OHL JOUF-2 CKT-2 85S1-2
DELAYED I/T-1 SEND RELAY OPTD
OHL JOUF-2 CKT-2 CB K310 AUTO
RECLOSER BLOCKED
OHL JOUF-2 CKT-2 CB K330 AUTO
RECLOSER BLOCKED
380 KV FAULT RECORD
TRIGGERED

OHL JOUF-2 CKT-2 FPFM 21-1 DIST


Z3 OPTD
OHL JOUF-2 CKT-2 FPFM 21-1 DIST
*Z2/ R-PH OPTD
Z3/Z4 OHL JOUF-2 CKT-2 FPFM 21-1 DIST
21-Z3 NO
OUT - DEL Y-PH OPTD NO -- -- --
(3-PHASE)
DIS OHL JOUF-2 CKT-2 FPFM 21-1 DIST
TRIP B-PH OPTD

*Z2/
21-Z4 86FBU-1 OHL JOUF-2 CKT-2 FPFM 21-1 DIST FPFM 85R1-2 DELAYED I/T-1 RELAY
Z3/Z4 85R1-2
(R- IN 86FBU-1X Z4 OPTD YES
85R1-2A
-- OPTD YES
85S1-2 DEL 79 AUTO RECLOSER LINE SECTION
PHASE) OHL JOUF-2 CKT-2 FPFM 21-1 DIST
DIS

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 35 of 69

R-PH OPTD
OHL JOUF-2 CKT-2 DELAY
LOCKOUT RELAY 86BU-1 OPTD
OHL JOUF-2 CKT-2 K310
AUTORECLOSER BLOCKED
OHL JOUF-2 CKT-2 K330
AUTORECLOSER BLOCKED
CBF-1 PROTECTION INITIATION
(BUS CB)
CBF-1 PROTECTION INITIATION
(MID CB)
CBF-2 PROTECTION INITIATION BREAKER BLOCKED
79 AUTO RECLOSER CENTER
TRIP (BUS CB) BREAKER BLOCKED
CBF-2 PROTECTION INITIATION 380KV FAULT RECORDER TRIGGERED
(MID CB)
CB K310 CLOSING LOCKOUT
CB K330 CLOSING LOCKOUT
CB K310 AUTO TRIP
CB K330 AUTO TRIP
OHL JOUF-2 CKT-2 85S1-2
DELAYED I/T-1 SEND RELAY OPTD
380 KV FAULT RECORD-3
TRIGGERED

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 36 of 69

*Z2/
Z3/Z4 OHL JOUF-2 CKT-2 FPFM 21-1 DIST
21-Z4
DEL Z4 OPTD NO
(R- OUT - NO -- -- --
DIS OHL JOUF-2 CKT-2 FPFM 21-1 DIST
PHASE)
TRIP R-PH OPTD

21-Z4 IN 86FBU-1 *Z2/ OHL JOUF-2 CKT-2 FPFM 21-1 DIST YES 85R1-2 -- FPFM 85R1-2 DELAYED I/T-1 RELAY YES
(Y- 86FBU-1X Z3/Z4 Z4 OPTD 85R1-2A OPTD
PHASE) 85S1-2 DEL OHL JOUF-2 CKT-2 FPFM 21-1 DIST 79 AUTO RECLOSER LINE SECTION
BREAKER BLOCKED
DIS Y-PH OPTD
79 AUTO RECLOSER CENTER
TRIP OHL JOUF-2 CKT-2 DELAY BREAKER BLOCKED
LOCKOUT RELAY 86BU-1 OPTD 380KV FAULT RECORDER TRIGGERED
OHL JOUF-2 CKT-2 K310
AUTORECLOSER BLOCKED
OHL JOUF-2 CKT-2 K330
AUTORECLOSER BLOCKED
CBF-1 PROTECTION INITIATION
(BUS CB)
CBF-1 PROTECTION INITIATION
(MID CB)
CBF-2 PROTECTION INITIATION
(BUS CB)
CBF-2 PROTECTION INITIATION
(MID CB)
CB K310 CLOSING LOCKOUT
CB K330 CLOSING LOCKOUT
CB K310 AUTO TRIP
CB K330 AUTO TRIP
OHL JOUF-2 CKT-2 85S1-2
DELAYED I/T-1 SEND RELAY OPTD
380 KV FAULT RECORD

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 37 of 69

TRIGGERED

*Z2/
Z3/Z4 OHL JOUF-2 CKT-2 FPFM 21-1 DIST
21-Z4
DEL Z4 OPTD NO
(Y- OUT - NO -- -- --
DIS OHL JOUF-2 CKT-2 FPFM 21-1 DIST
PHASE)
TRIP Y-PH OPTD

21-Z4 IN 86FBU-1 *Z2/ OHL JOUF-2 CKT-2 FPFM 21-1 DIST YES 85R1-2 -- FPFM 85R1-2 DELAYED I/T-1 RELAY YES
(B-PHASE) 86FBU-1X Z3/Z4 Z4 OPTD 85R1-2A OPTD
85S1-2 DEL OHL JOUF-2 CKT-2 FPFM 21-1 DIST 79 AUTO RECLOSER LINE SECTION
BREAKER BLOCKED
DIS B-PH OPTD
79 AUTO RECLOSER CENTER
TRIP OHL JOUF-2 CKT-2 DELAY BREAKER BLOCKED
LOCKOUT RELAY 86BU-1 OPTD 380KV FAULT RECORDER TRIGGERED
OHL JOUF-2 CKT-2 K310
AUTORECLOSER BLOCKED
OHL JOUF-2 CKT-2 K330
AUTORECLOSER BLOCKED
CBF-1 PROTECTION INITIATION
(BUS CB)
CBF-1 PROTECTION INITIATION
(MID CB)
CBF-2 PROTECTION INITIATION
(BUS CB)
CBF-2 PROTECTION INITIATION
(MID CB)
CB K310 CLOSING LOCKOUT
CB K330 CLOSING LOCKOUT
CB K310 AUTO TRIP

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 38 of 69

CB K330 AUTO TRIP


OHL JOUF-2 CKT-2 85S1-2
DELAYED I/T-1 SEND RELAY OPTD
380 KV FAULT RECORD
TRIGGERED

*Z2/
Z3/Z4 OHL JOUF-2 CKT-2 FPFM 21-1 DIST
21-Z4 DEL Z4 OPTD NO
OUT - NO -- -- --
(B-PHASE) DIS OHL JOUF-2 CKT-2 FPFM 21-1 DIST
TRIP B-PH OPTD

21-Z4 IN 86FBU-1 *Z2/ OHL JOUF-2 CKT-2 FPFM 21-1 DIST YES 85R1-2 -- FPFM 85R1-2 DELAYED I/T-1 RELAY YES
(3-PHASE) 86FBU-1X Z3/Z4 Z4 OPTD 85R1-2A OPTD
85S1-2 DEL OHL JOUF-2 CKT-2 FPFM 21-1 DIST 79 AUTO RECLOSER LINE SECTION
BREAKER BLOCKED
DIS R-PH OPTD
79 AUTO RECLOSER CENTER
TRIP OHL JOUF-2 CKT-2 FPFM 21-1 DIST BREAKER BLOCKED
Y-PH OPTD 380KV FAULT RECORDER TRIGGERED
OHL JOUF-2 CKT-2 FPFM 21-1 DIST
B-PH OPTD
OHL JOUF-2 CKT-2 DELAY
LOCKOUT RELAY 86BU-1 OPTD
OHL JOUF-2 CKT-2 K310
AUTORECLOSER BLOCKED
OHL JOUF-2 CKT-2 K330
AUTORECLOSER BLOCKED
CBF-1 PROTECTION INITIATION
(BUS CB)
CBF-1 PROTECTION INITIATION
(MID CB)

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 39 of 69

CBF-2 PROTECTION INITIATION


(BUS CB)
CBF-2 PROTECTION INITIATION
(MID CB)
CB K310 CLOSING LOCKOUT
CB K330 CLOSING LOCKOUT
CB K310 AUTO TRIP
CB K330 AUTO TRIP
OHL JOUF-2 CKT-2 85S1-2
DELAYED I/T-1 SEND RELAY OPTD
OHL JOUF-2 CKT-2 CB K310 AUTO
RECLOSER BLOCKED
OHL JOUF-2 CKT-2 CB K330 AUTO
RECLOSER BLOCKED
380 KV FAULT RECORD
TRIGGERED
OHL JOUF-2 CKT-2 FPFM 21-1 DIST
Z4 OPTD
OHL JOUF-2 CKT-2 FPFM 21-1 DIST
*Z2/ R-PH OPTD
Z3/Z4 OHL JOUF-2 CKT-2 FPFM 21-1 DIST
21-Z4 NO
OUT - DEL Y-PH OPTD NO -- -- --
(3-PHASE)
DIS OHL JOUF-2 CKT-2 FPFM 21-1 DIST
TRIP B-PH OPTD

*SOTF FPFM PSE OLS-1 21-1 CHANNEL


TRIP OHL JOUF-2 CKT-2 FPFM DIST RECEIVED
85R1-2 *21/67N
86F1-BU FPFM PSE OLS-2 21-1 CHANNEL
SOTF IN
86F1X-BU
*21/67N CARRIER SEND YES 85R1-2A CARRIER RECEIVED
YES
85S1-2 CS OHL JOUF-2 CKT-2 FPFM 21-1 DIST RECV FPFM 85R1-2 DELAYED I/T-1 RELAY
SOTF OPTD OPTD

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 40 of 69

OHL JOUF-2 CKT-2 DELAY


LOCKOUT RELAY 86BU-1 OPTD
OHL JOUF-2 CKT-2 K310
AUTORECLOSER BLOCKED
OHL JOUF-2 CKT-2 K330
AUTORECLOSER BLOCKED
CBF-1 PROTECTION INITIATION
(BUS CB)
CBF-1 PROTECTION INITIATION
(MID CB) 79 AUTO RECLOSER LINE SECTION
CBF-2 PROTECTION INITIATION BREAKER BLOCKED
(BUS CB) 79 AUTO RECLOSER CENTER
CBF-2 PROTECTION INITIATION BREAKER BLOCKED
(MID CB) FPFM 21-1 DIS CARRIER RECIEVED
CB K310 CLOSING LOCKOUT 380KV FAULT RECORDER TRIGGERED
CB K330 CLOSING LOCKOUT
CB K310 AUTO TRIP
CB K330 AUTO TRIP
OHL JOUF-2 CKT-2 85S1-2
DELAYED I/T-1 SEND RELAY OPTD
380 KV FAULT RECORD
TRIGGERED

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 41 of 69

OHL JOUF-2 CKT-2 FPFM 21-1 DIST


*SOTF
SOTF OUT ----- SOTF OPTD NO ---- ---- -- NO
TRIP

67N-1 IN *86F1BU *67N YES FPFM PSE OLS-1 67N-1 CHANNEL YES
Delayed *86F1BU DEL OHL JOUF-2 CKT-2 FPFM 67N-1 DEF 85R1-2 *21/67N RECEIVED
Forward X DEF DELAY OPTD 85R1-2A CARRIER FPFM PSE OLS-2 67N-1 CHANNEL
*85S1-2 RECEIVED
DIR TRIP OHL JOUF-2 CKT-2 FPFM 21-1 DEF RECV
FPFM 85R1-2 DELAYED I/T-1 RELAY
*21/67N CARRIER SEND OPTD
CARRIE OHL JOUF-2 CKT-2 DELAY 79 AUTO RECLOSER LINE SECTION
R SEND LOCKOUT RELAY 86BU-1 OPTD BREAKER BLOCKED
OHL JOUF-2 CKT-2 K310 79 AUTO RECLOSER CENTER
AUTORECLOSER BLOCKED BREAKER BLOCKED
OHL JOUF-2 CKT-2 K330 380KV FAULT RECORDER TRIGGERED
AUTORECLOSER BLOCKED
CBF-1 PROTECTION INITIATION
(BUS CB)
CBF-1 PROTECTION INITIATION
(MID CB)
CBF-2 PROTECTION INITIATION
(BUS CB)
CBF-2 PROTECTION INITIATION
(MID CB)
CB K310 CLOSING LOCKOUT
CB K330 CLOSING LOCKOUT
CB K310 AUTO TRIP
CB K330 AUTO TRIP

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 42 of 69

OHL JOUF-2 CKT-2 85S1-2


DELAYED I/T-1 SEND RELAY OPTD
380 KV FAULT RECORD-3
TRIGGERED

67N-1 *67N
OHL JOUF-2 CKT-2 FPFM 67N-1 DEF
Delayed DEL --
OUT NO TRIP DELAY OPTD NO -- -- NO
Forward DEF
DIR TRIP

67N-1
Delayed
IN -- -- -- NO -- -- -- NO
REVERSE
DIR

67N-1
Delayed
OUT -- -- -- NO -- -- -- NO
REVERSE
DIR

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 43 of 69

3.2 COMMUNICATION SCHEME TEST (AIDED DISTANCE)

Remote End Local End


S/S JOUF-2 380/132/13.8KV BSP DAWMAT AL-JANDAL BSP
Protection Aux. FR TRIGGER
FR Aux.
Function Relay Indication
PROT. I/O SAS TRIG Relay Indication LED SAS
In LED
GER In Panel
Panel
21-AIDED IN/IN 94F-1 *Z1/AID FPFM 21-1 DIST CARRIER SEND YES *94F1 *Z1/AID DIS OHL JOUF-2 CKT-2 FPFM DIST YES
94F- DIS TRIP FPFM OLS-1 21-1 CHANNEL *94F1X TRIP CARRIER SEND
1X *21/67N RECEIVED *85S1-1 *21/67N OHL JOUF-2 CKT-2 FPFM
DISTANCE CARRIER RECEIVED
85S1-1 CARRIER FPFM OLS-1 21-2 CHANNEL *85R1-1 CARRIER
OHL JOUF-2 CKT-2 FPFM 21-1 DIST
85R1-1 SEND RECEIVED *85S-1 SEND AIDED OPTD
85R1- *21/67N FPFM 21-1 DIST AIDED OPTD *21/67N OHL JOUF-2 CKT-2 FPFM
1A CARRIER FPFM 94F-1 TRIP RELAY OPTD CARRIER INSTANTANEOUS RELAY 94F-1
RECV FPFM 85S1-1 FAST I/T-1 RELAY RECV OPTD
*AR OPTD *AR BLOCK OHL JOUF-2 CKT-2 85S1-1 FAST I/T-
BLOCK FPFM 85R1-1A FAST I/T-1 1 SEND RELAY OPTD
RELAY OPTD OHL JOUF-2 CKT-2 CB K310
79 AUTORECLOSER LINE AUTORECLOSER INITIATED
OHL JOUF-2 CKT-2 CB K330
SECTION BREAKER INITIATED
AUTORECLOSER INITIATED
79 AUTORECLOSER CENTRE CBF-1 PROTECTION INITIATED
BREAKER INITIATED (BUS CB)
380KV FAULT RECORDER CBF-1 PROTECTION INITIATED
TRIGGERED (MID CB)
CBF-2 PROTECTION INITIATED
(BUS CB)
CBF-2 PROTECTION INITIATED
(MID CB)
OHL JOUF-2 CKT-2 85R1-1 FAST I/T-

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 44 of 69

1 RECV. RELAY OPTD


CB K310 AUTO TRIP
CB K330 AUTO TRIP
OHL JOUF-2 CKT-2 CB K310
AUTORECLOSER BLOCKED
OHL JOUF-2 CKT-2 CB K330
AUTORECLOSER BLOCKED

OUT/ -- -- -- -- --
21-AIDED OUT
-- NO NO

*21/67N
-- CARRIER FPFM 21-1 DIST CARRIER SEND
21-AIDED IN/OUT YES -- -- -- YES
SEND

21-1 OUT/IN -- *Z1/AID FPSM PSE OLS-1 21-1 CHANNEL YES -- *21/67N OHL JOUF-2 CKT-2 DIST CARRIER YES
AIDED DIS TRIP RECEIVED CARRIER SEND
*21/67N FPSM PSE OLS-2 21-1 CHANNEL SEND
CARRIER RECEIVED
SEND FPSM 21-1 DISTANCE AIDED
*21/67N OPTD
CARRIER 79 AUTORECLOSER LINE
RECV SECTION BREAKER
*AR OPERATION BLOCKED
BLOCK 380KV FAULT RECORDER
TRIGGERED

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 45 of 69

3.3 COMMUNICATION SCHEME TEST (AIDED DEF)

Local End Remote End


S/S JOUF-2 380/132/13.8KV BSP DAWMAT AL-JANDAL BSP
Protection
Aux. Aux. FR
Function PROT. Indication FR Indication
I/O Relay LED SAS TRIGGER Relay LED SAS TRIGGER
In Panel In Panel
67N- IN/IN 94F-1 *Z1/AID FPFM 67N-1 DEF CARRIER SEND YES *94F1 *Z1/AID OHL JOUF-2 CKT-2 FPFM DEF CARRIER YES
AIDED 94F-1X DIS TRIP FPFM OLS-1 67N-1 CHANNEL *94F1X DIS TRIP SEND
85S1-1 *67N/67N RECEIVED *85R1-1 *67/67N OHL JOUF-2 CKT-2 FPFM DEFANCE
CARRIER RECEIVED
85R1-1 CARRIER FPFM OLS-1 67N-2 CHANNEL *85S-1 CARRIER
OHL JOUF-2 CKT-2 FPFM 67N-1 DEF
85R1-1A SEND RECEIVED SEND AIDED OPTD
*21N/67N FPFM 67N-1 DEF AIDED OPTD *67N/67N OHL JOUF-2 CKT-2 FPFM
CARRIER FPFM 94F-1 TRIP RELAY OPTD CARRIER INSTANTANEOUS RELAY 94F-1 OPTD
RECV FPFM 85S1-1 FAST I/T-1 RELAY RECV OHL JOUF-2 CKT-2 85S-1 FAST I/T-1
*AR OPTD *AR SEND RELAY OPTD
BLOCK FPFM 85R1-1 FAST I/T-1 RELAY BLOCK OHL JOUF-2 CKT-2 CB K310
OPTD AUTORECLOSER INITIATED
79 AUTORECLOSER LINE OHL JOUF-2 CKT-2 CB K330
AUTORECLOSER INITIATED
SECTION BREAKER INITIATED
CBF-1 PROTECTION INITIATED (BUS
79 AUTORECLOSER CENTRE CB)
BREAKER INITIATED CBF-1 PROTECTION INITIATED (MID
380KV FAULT RECORDER CB)
TRIGGERED CBF-2 PROTECTION INITIATED (BUS
CB)
CBF-2 PROTECTION INITIATED (MID
CB)

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 46 of 69

OHL JOUF-2 CKT-2 85R1-1 FAST I/T-1


RECV. RELAY OPTD
CB K310 AUTO TRIP
CB K330 AUTO TRIP
OHL JOUF-2 CKT-2 CB K310
AUTORECLOSER BLOCKED
OHL JOUF-2 CKT-2 CB K330
AUTORECLOSER BLOCKED

67N- OUT/ -- -- -- -- --
-- NO NO
AIDED OUT

*67N/67N
FPFM 67N-1 DEF CARRIER SEND
67N- IN/ CARRIER
OUT
380KV FAULT RECORDER YES -- -- -- YES
AIDED SEND
TRIGGERED

67N-1 OUT/ -- *AIDED FPSM PSE OLS-1 67N-1 YES -- *67/67N OHL JOUF-2 CKT-2 DEF CARRIER SEND YES
AIDED IN DEF TRIP CHANNEL RECEIVED CARRIER
*67 FPSM PSE OLS-2 67N-1 SEND
CARRIER CHANNEL RECEIVED
SEND (G) FPSM 67N-1 DEF AIDED OPTD
*67N 380KV FAULT RECORDER
CARRIER TRIGGERED
RECEIVE
(G)

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 47 of 69

3.5 DIFF FUNCTION TEST

1- DC Failure Test: Simulation at JOUF-2 CKT

Simulation Alarms At: S/S JOUF-2 BSP CKT-2 Alarms At: S/S DAWMAT AL-JANDAL
at
S/S JOUF- Relay Relay
2 BSP CKT- MCP SAS MCP SAS
Panel Panel
2
FPFM RED670 PROTECTION RELAY DC OHL JOUF-2 CKT-2 FPFM DIFF. COMM
*Local alarm SUPPLY FAIL *DIFF BLOCK 87L MUX. CH-2 FAIL
*FPFM-87L-1 Red Led for FPFM RED670 PROTECTION RELAY *DIFF.CH1 *Local alarm Red Led OHL JOUF-2 CKT-2 FPFM DIFF. COMM
FPFM DC OFF for CH-1&CH-2
RELAY-OFF CH-1&CH-2 FAULTY Fail 87L MUX. CH-1 FAIL
* Green LED PROT RELAY SAS COMMUNICATION *DIFF.CH2 OHL JOUF-2 CKT-2 FPFM FUNCTION
“Link” is off FAIL Fail DIFF. (BLOCKED)
Converter Converter (FOIP-12) FPFM CONVERTER CH-1 OE-3 *Local alarm Red Led
*DIFF.CH1 *DIFF.CH1 for CH-1 OHL JOUF-2 CKT-2 FPFM DIFF. COMM
CONV.1 CONV.1 DC SUPPLY FAIL
Fail Fail 87L MUX. CH-1 FAIL
DC OFF OFF FPFM 87L-1 DIFF. CHANNEL-1 FAIL
Converter Converter (FOIP-11) FPFM CONVERTER CH-2 OE-3 *Local alarm Red Led
for CH-2 OHL JOUF-2 CKT-2 FPFM DIFF. COMM
CONV.2 *DIFF.CH2 CONV.2 DC SUPPLY FAIL *DIFF.CH2
87L MUX. CH-2 FAIL
DC OFF Fail OFF FPFM 87L-1 DIFF. CHANNEL-2 FAIL Fail
(FOIP-12) FPFM CONVERTER CH-1 OE-3
DC SUPPLY FAIL *DIFF.CH1
Converter *DIFF.CH1 Converter OHL JOUF-2 CKT-2 FPFM DIFF. COMM
FPFM 87L-1 DIFF. CHANNEL-1 FAIL Fail
CONV.1 Fail CONV.1 *Local alarm Red Led 87L MUX. CH-1 FAIL
(FOIP-11) FPFM CONVERTER CH-2 OE-3 *DIFF.CH2
& *DIFF.CH2 OFF for CH-1&CH-2 OHL JOUF-2 CKT-2 FPFM DIFF. COMM
DC SUPPLY FAIL Fail
Converter Fail Converter 87L MUX. CH-2 FAIL
FPFM 87L-1 DIFF. CHANNEL-2 FAIL *DIFF BLOCK
CONV.2 *DIFF CONV.2 OHL JOUF-2 CKT-2 FPFM FUNCTION
FPFM 87L-1 DIFF. BLOCKED
DC OFF BLOCK OFF (DIFF.) BLOCKED
FPFM 87L-1 DIFF. (F.O)
COMMUNICATION CHANNEL FAIL

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 48 of 69

2- DC Failure Test: Simulation at DAWMAT AL-JANDAL

Simulation Alarms At: S/S DAWMAT AL-JANDAL BSP Alarms At: S/S JOUF-2 380/132/13.8 KV
at
S/S Relay Relay
DAWMAT MCP SAS MCP SAS
Panel Panel
AL-JANDAL
OHL JOUF-2 CKT-2 FPFM PROT. DC
*Local alarm FPFM 87L-1 DIFF. CHANNEL-1 FAIL
SUPPLY FAIL *DIFF BLOCK
Red Led for *Local alarm Red Led FPFM 87L-1 DIFF. CHANNEL-2 FAIL
*FPFM-87L-1 OHL JOUF-2 CKT-2 FPFM PROT. RELAY *DIFF.CH1
FPFM DC OFF CH-1&CH-2 for CH-1&CH-2 FPFM 87L-1 DIFF. BLOCKED
RELAY-OFF FAULTY Fail
* Green LED FPFM 87L-1 DIFF. (F.O) COMMUNICATION
OHL JOUF-2 CKT-2 FPFM SAS *DIFF.CH2
“Link” is off CHANNEL FAIL
COMMUNICATION FAIL Fail
OHL JOUF-2 CKT-2 FPFM MEDIA CONV-1 *Local alarm Red Led
Converter Converter
*DIFF.CH1 DC FAIL *DIFF.CH1 for CH-1
CONV.1 CONV.1 FPFM 87L-1 DIFF. CHANNEL-1 FAIL
Fail OHL JOUF-2 CKT-2 FPFM DIFF. COMM Fail
DC OFF OFF
87L MUX. CH-1 FAIL
OHL JOUF-2 CKT-2 FPFM MEDIA CONV-2 *Local alarm Red Led
Converter Converter
DC FAIL for CH-2
CONV.2 *DIFF.CH2 CONV.2 *DIFF.CH2 FPFM 87L-1 DIFF. CHANNEL2 FAIL
OHL JOUF-2 CKT-2 FPFM DIFF. COMM
DC OFF Fail OFF Fail
87L MUX. CH-2 FAIL
Converter Converter OHL JOUF-2 CKT-2 FPFM MEDIA CONV-1
*DIFF.CH1
CONV.1 *DIFF.CH1 CONV.1 DC FAIL *Local alarm Red Led FPFM 87L-1 DIFF. CHANNEL-1 FAIL
Fail
& Fail OFF OHL JOUF-2 CKT-2 FPFM DIFF. COMM for CH-1&CH-2 FPFM 87L-1 DIFF. CHANNEL-2 FAIL
*DIFF.CH2
Converter *DIFF.CH2 Converter 87L MUX. CH-1 FAIL FPFM 87L-1 DIFF. BLOCKED
Fail
CONV.2 Fail CONV.2 OHL JOUF-2 CKT-2 FPFM MEDIA CONV-2 FPFM 87L-1 DIFF. (F.O) COMMUNICATION
*DIFF BLOCK
DC OFF *DIFF OFF DC FAIL CHANNEL FAIL

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 49 of 69

OHL JOUF-2 CKT-2 FPFM DIFF. COMM


BLOCK 87L MUX. CH-2 FAIL
OHL JOUF-2 CKT-2 FPFM FUNCTION
(DIFF.) BLOCKED

3- Communication Fail Check: Simulation at S/S JOUF-2

Simulation At Alarms At: S/S JOUF-2 Alarms At: S/S DAWMAT AL-JANDAL
S/S JOUF-2 MCP MCP
BSP
Relay Panel SAS Relay Panel SAS
*Local alarm *Local alarm
REMOVE FIBER Red Led for Red Led for OHL JOUF-2 CKT-2 FPFM DIFF. COMM 87L
*DIFF.CH1 Fail CH-1 FPFM 87L-1 DIFF. CH-1 FAIL *DIFF.CH1 Fail
FPFM 87L-1 CH1 CH-1 MUX. CH-1 FAIL

*Local alarm *Local alarm


REMOVE FIBER Red Led for Red Led for OHL JOUF-2 CKT-2 FPFM DIFF. COMM 87L
*DIFF.CH2 Fail CH-2 FPFM 87L-1 DIFF. CH-2 FAIL *DIFF.CH2 Fail
FPFM 87L-1 CH2 CH-2 MUX. CH-2 FAIL

*Local alarm *Local alarm OHL JOUF-2 CKT-2 FPFM DIFF. COMM 87L
Red Led for FPFM 87L-1 DIFF. CH-1 FAIL *DIFF.CH1 Fail Red Led for MUX. CH-1 FAIL
REMOVE FIBER *DIFF.CH1 Fail *DIFF.CH2 Fail
CH-1 & CH-2 FPFM 87L-1 DIFF. CH-2 FAIL CH-1 & CH-2 OHL JOUF-2 CKT-2 FPFM DIFF. COMM 87L
FPFM 87L-1 CH1 *DIFF.CH2 Fail *DIFF BLOCK
FPFM 87L-1 DIFF. BLOCKED MUX. CH-2 FAIL
FPFM 87L-1 CH2 *DIFF BLOCK
FPFM 87L-1 DIFF. (F.O) COMMUNICATION CHANNEL FAIL OHL JOUF-2 CKT-2 FPFM FUNCTION (DIFF.)
BLOCKED

4- Communication Fail Check: Simulation at S/S DAWMAT AL-JANDAL


Simulation Alarms At: S/S DAWMAT AL-JANDAL Alarms At: S/S JOUF-2 380/132/13.8 KV
At
S/S DAJ Relay Panel MCP SAS Relay Panel MCP SAS
BSP
*Local alarm *Local alarm
REMOVE FIBER Red Led for OHL JOUF-2 CKT-2 FPFM DIFF. COMM 87L MUX. CH-1 Red Led for
*DIFF.CH1 Fail CH-1 *DIFF.CH1 Fail FPFM 87L-1 DIFF. CHANNEL-1 FAIL
FPFM 87L-1 CH1 FAIL CH-1

*Local alarm OHL JOUF-2 CKT-2 FPFM DIFF. COMM 87L MUX. CH-2 *Local alarm
REMOVE FIBER *DIFF.CH2 Fail *DIFF.CH2 Fail FPFM 87L-1 DIFF. CHANNEL-2 FAIL
Red Led for FAIL Red Led for

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 50 of 69

CH-2 CH-2
FPFM 87L-1 CH2
*Local alarm OHL JOUF-2 CKT-2 FPFM DIFF. COMM 87L MUX. CH-1 *Local alarm
*DIFF.CH1 Fail *DIFF.CH1 Fail FPFM 87L-1 DIFF. CHANNEL-1 FAIL
Red Led for FAIL Red Led for
REMOVE FIBER *DIFF.CH2 Fail *DIFF.CH2 Fail FPFM 87L-1 DIFF. CHANNEL-2 FAIL
CH-1 & CH- OHL JOUF-2 CKT-2 FPFM DIFF. COMM 87L MUX. CH-2 CH-1 & CH-2
FPFM 87L-1 CH1 *DIFF BLOCK *DIFF BLOCK FPFM 87L-1 DIFF. BLOCKED
2 FAIL
FPFM 87L-1 CH2 FPFM 87L-1 DIFF. (F.O) COMMUNICATION
OHL JOUF-2 CKT-2 FPFM FUNCTION (DIFF.)
CHANNEL FAIL
BLOCKED

1- Measurement Test
Testing Equipment: 3- Φ injection tester OMICRON CMC Note: CTR = 3000: 1 A
A- Injection at S/S JOUF-2 BSP CKT-2:
 CH1 HEALTHY & CH2 FAIL
INJECTED S/S JOUF-2 S/S DAJ BSP CKT-2
Current
S.N Phase
(LOCAL )
RED670 Display Current ( A ) RED670 Display Current ( A )
FREJA I- LOCAL I REMOTE I DIFF I BIAS I- LOCAL I REMOTE I DIFF I BIAS

1 R-N 0.25A 742 0 743.6 0 704 706


2995.3 2955
2 Y-N 0.5A 1493.38 0 1492.3 0 1468 1465

3 B-N 1A 2999.69 0 2997.2 0 2965 2955

 CH2 HEALTHY & CH1 FAIL


INJECTED S/S JOUF-2 S/S DAJ BSP CKT-2
Current
S.N Phase
(LOCAL )
RED670 Display Current ( A ) RED670 Display Current ( A )
FREJA I- LOCAL I REMOTE I DIFF I BIAS I- LOCAL I REMOTE I DIFF I BIAS

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 51 of 69

1 R-N 0.25A 741 0 735 0 731.75 731.24

2 Y-N 0.5A 1492 0 1493 2994 0 1485.64 1477.36 2995.48

3 B-N 1A 2993 0 2996 0 2974 2995


B- Injection at S/S DAJ BSP CKT-2:
 CH1 HEALTHY & CH2 FAIL
INJECTED S/S DAJ BSP CKT-2 S/S JOUF-2
Current
S.N Phase
(LOCAL )
RED670 Display Current ( A ) RED670 Display Current ( A )
FREJA I- LOCAL I REMOTE I DIFF I BIAS I- LOCAL I REMOTE I DIFF I BIAS

1 R-N 0.25A 746 0 741 0 719 718

2 Y-N 0.5A 1493 0 1494 3000 0 1466 1455 2977

3 B-N 1A 2999 0 3000 0 2964 2968

 CH2 HEALTHY & CH1 FAIL


INJECTED S/S DAJ BSP CKT-2 S/S JOUF-2
Current
S.N Phase
(LOCAL )
RED670 Display Current ( A ) RED670 Display Current ( A )
FREJA I- LOCAL I REMOTE I DIFF I BIAS I- LOCAL I REMOTE I DIFF I BIAS

1 R-N 0.25A 742 0 742 2999 0 711 721 2965

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 52 of 69

2 Y-N 0.5A 1494 0 1493 0 1476 1485

3 B-N 1A 3000 0 3000 0 2977 2968

 Differential Stability Test : -

1- Inject Rated Current in Local & Remote Ends continuously by GPS Sync. :-

Test NO. Action RELAY REACTION


1 CH-1 FAIL NO TRIP
2 CH-2 FAIL NO TRIP
3 CH-1 FAIL & CH-2 FAIL NO TRIP
4 RELAY SUPPLY OFF (DC OFF) NO TRIP
5 RELAY ON TEST MODE NO TRIP

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 53 of 69

 The following diagram for ( 3 phase Diff Characteristics ) between DAJ CKT-2 & JOUF-2 CKT-2 :-

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 54 of 69

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 55 of 69

A- Differential Trip Test:

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 56 of 69

A- Injection at S/S JOUF-2 BSP CKT-2: Differential Trip Test (CH2 FAIL, CH1 HEALTHY) & Prot. IN
Simulation At Alarms At S/S JOUF-2 BSP Alarms At: S/S DAWMAT AL-JANDAL
S/S JOUF-2
BSP Relay LED Relay OPTD SAS Relay OPTD Relay LED SAS

87L DIFF. TRIP 94F1-1 * 87L Diff FPFM 87L-1 DIFF. I/T SEND * 87L Diff Trip OHL JOUF-2 CKT-2 FPFM 87L-1 DIFF. R-
94F1-1X Trip FPFM 87L-1 DIFF. I/T RECEIVED * AR BLOCK PH OPTD
85S1-1 * AR BLOCK FPFM 87L-1 DIFF. R-PH OPTD 94F1 OHL JOUF-2 CKT-2 FPFM 87L-1 DIFF. Y-
85R1-1 FPFM 87L-1 DIFF. Y-PH OPTD 94F1X PH OPTD
85R1-1A FPFM 87L-1 DIFF. B-PH OPTD 85S1-1 OHL JOUF-2 CKT-2 FPFM 87L-1 DIFF. B-
FPFM 94-1 TRIP RELAY OPTD 85R1-1 PH OPTD
FPFM 85S1-1 FAST I/T-1 RELAY OHL JOUF-2 CKT-2 FPFM
OPTD INSTANTANEOUS RELAY 94F-1 OPTD
FPFM 85R1-1A FAST I/T-1 RELAY OHL JOUF-2 CKT-2 85S1-1 FAST I/T-1
OPTD SEND RELAY OPTD
79 AUTORECLOSER LINE OHL JOUF-2 CKT-2 85R1-1 FAST I/T-1
SECTION BREAKER INITIATED RECV. RELAY OPTD
79 AUTORECLOSER CENTRE OHL JOUF-2 CKT-2 CB K310
BREAKER INITIATED AUTORECLOSER INITIATED
380KV FAULT RECORDER OHL JOUF-2 CKT-2 CB K330
TRIGGERED AUTORECLOSER INITIATED
79 AUTORECLOSER LINE CBF-1 PROTECTION INITIATED (BUS CB)
SECTION BREAKER BLOCKED CBF-1 PROTECTION INITIATED (MID CB)
CBF-2 PROTECTION INITIATED (BUS CB)
CBF-2 PROTECTION INITIATED (MID CB)
CB K310 AUTOTRIP
CB K330 AUTOTRIP
OHL JOUF-2 CKT-2 CB K310 79
AUTORECLOER BLOCKED
OHL JOUF-2 CKT-2 CB K330 79

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 57 of 69

AUTORECLOSER BLOCKED

B- Injection at S/S JOUF-2 BSP CKT-2: Differential Trip Test (CH2 FAIL, CH1 HEALTHY) & Prot. OUT at JOUF-2
Alarms At S/S JOUF-2 BSP Alarms At: S/S DAWMAT AL-JANDAL
Simulation At
S/S JOUF-2 BSP Relay LED Relay OPTD SAS Relay OPTD Relay LED SAS

87L DIFF. TRIP 85R1-1 * 87L Diff FPFM 87L-1 DIFF. I/T SEND * 87L Diff OHL JOUF-2 CKT-2 FPFM 87L-1 DIFF. R-
Trip FPFM 87L-1 DIFF. I/T RECEIVED Trip PH OPTD
* AR BLOCK FPFM 87L-1 DIFF. R-PH OPTD * AR BLOCK 94F1-1 OHL JOUF-2 CKT-2 FPFM 87L-1 DIFF. Y-
FPFM 87L-1 DIFF. Y-PH OPTD 94F1-1X PH OPTD
FPFM 87L-1 DIFF. B-PH OPTD 85S1-1 OHL JOUF-2 CKT-2 FPFM 87L-1 DIFF. B-
FPFM 85R1-1 FAST I/T-1 RELAY PH OPTD
OPTD OHL JOUF-2 CKT-2 FPFM 94-1 TRIP
79 AUTORECLOSER LINE RELAY OPTD
SECTION BREAKER INITIATED OHL JOUF-2 CKT-2 FPFM 85S1-1 FAST
79 AUTORECLOSER CENTRE I/T-1 RELAY OPTD
BREAKER INITIATED OHL JOUF-2 CKT-2 CB K310
380KV FAULT RECORDER AUTORECLOSER INITIATED
TRIGGERED OHL JOUF-2 CKT-2 CB K330
79 AUTORECLOSER LINE AUTORECLOSER INITIATED
SECTION BREAKER BLOCKED CBF-1 PROTECTION INITIATED (BUS CB)
CBF-1 PROTECTION INITIATED (MID CB)
CBF-2 PROTECTION INITIATED (BUS CB)
CBF-2 PROTECTION INITIATED (MID CB)
CB K310 AUTOTRIP
CB K330 AUTOTRIP
OHL JOUF-2 CKT-2 CB K310 79

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 58 of 69

AUTORECLOER BLOCKED
OHL JOUF-2 CKT-2 CB K330 79
AUTORECLOSER BLOCKED

C- Injection at S/S JOUF-2 BSP CKT-2: Differential Trip Test (CH1 FAIL, CH2 HEALTHY) & Prot. IN
D- Simulation At Alarms At S/S JOUF-2 BSP Alarms At: S/S DAWMAT AL-JANDAL
E- S/S JOUF-2
BSP Relay LED Relay OPTD SAS Relay OPTD Relay LED SAS

87L DIFF. TRIP 94F1-1 * 87L Diff FPFM 87L-1 DIFF. I/T SEND * 87L Diff OHL JOUF-2 CKT-2 FPFM 87L-1 DIFF. R-
94F1-1X Trip FPFM 87L-1 DIFF. I/T RECEIVED Trip PH OPTD
85S1-1 * AR BLOCK FPFM 87L-1 DIFF. R-PH OPTD * AR BLOCK 94F1 OHL JOUF-2 CKT-2 FPFM 87L-1 DIFF. Y-
85R1-1 FPFM 87L-1 DIFF. Y-PH OPTD 94F1X PH OPTD
85R1-1A FPFM 87L-1 DIFF. B-PH OPTD 85S1-1 OHL JOUF-2 CKT-2 FPFM 87L-1 DIFF. B-
FPFM 94-1 TRIP RELAY OPTD 85R1-1 PH OPTD
FPFM 85S1-1 FAST I/T-1 RELAY OHL JOUF-2 CKT-2 FPFM
OPTD INSTANTANEOUS RELAY 94F-1 OPTD
FPFM 85R1-1A FAST I/T-1 RELAY OHL JOUF-2 CKT-2 85S1-1 FAST I/T-1
OPTD SEND RELAY OPTD
79 AUTORECLOSER LINE OHL JOUF-2 CKT-2 85R1-1 FAST I/T-1
SECTION BREAKER INITIATED RECV. RELAY OPTD
79 AUTORECLOSER CENTRE OHL JOUF-2 CKT-2 CB K310
BREAKER INITIATED AUTORECLOSER INITIATED
380KV FAULT RECORDER OHL JOUF-2 CKT-2 CB K330
TRIGGERED AUTORECLOSER INITIATED
79 AUTORECLOSER LINE CBF-1 PROTECTION INITIATED (BUS CB)
SECTION BREAKER BLOCKED CBF-1 PROTECTION INITIATED (MID CB)
CBF-2 PROTECTION INITIATED (BUS CB)

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 59 of 69

CBF-2 PROTECTION INITIATED (MID CB)


CB K310 AUTOTRIP
CB K330 AUTOTRIP
OHL JOUF-2 CKT-2 CB K310 79
AUTORECLOER BLOCKED
OHL JOUF-2 CKT-2 CB K330 79
AUTORECLOSER BLOCKED

F- Injection at S/S JOUF-2 BSP CKT-2: Differential Trip Test (CH1 FAIL, CH2 HEALTHY) & Prot OUT at JOUF-2
Alarms At S/S JOUF-2 BSP Alarms At: S/S DAWMAT AL-JANDAL
Simulation At
S/S JOUF-2 BSP Relay LED Relay OPTD SAS Relay OPTD Relay LED SAS

87L DIFF. TRIP 85R1-1 * 87L Diff FPFM 87L-1 DIFF. I/T SEND * 87L Diff OHL JOUF-2 CKT-2 FPFM 87L-1 DIFF. R-
Trip FPFM 87L-1 DIFF. I/T RECEIVED Trip PH OPTD
* AR BLOCK FPFM 87L-1 DIFF. R-PH OPTD * AR BLOCK 94F1-1 OHL JOUF-2 CKT-2 FPFM 87L-1 DIFF. Y-
FPFM 87L-1 DIFF. Y-PH OPTD 94F1-1X PH OPTD
FPFM 87L-1 DIFF. B-PH OPTD 85S1-1 OHL JOUF-2 CKT-2 FPFM 87L-1 DIFF. B-
FPFM 85R1-1 FAST I/T-1 RELAY PH OPTD
OPTD OHL JOUF-2 CKT-2 FPFM 94-1 TRIP
79 AUTORECLOSER LINE RELAY OPTD
SECTION BREAKER INITIATED OHL JOUF-2 CKT-2 FPFM 85S1-1 FAST
79 AUTORECLOSER CENTRE I/T-1 RELAY OPTD
BREAKER INITIATED OHL JOUF-2 CKT-2 CB K310
380KV FAULT RECORDER AUTORECLOSER INITIATED
TRIGGERED OHL JOUF-2 CKT-2 CB K330

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 60 of 69

AUTORECLOSER INITIATED
CBF-1 PROTECTION INITIATED (BUS CB)
CBF-1 PROTECTION INITIATED (MID CB)
CBF-2 PROTECTION INITIATED (BUS CB)
CBF-2 PROTECTION INITIATED (MID CB)
CB K310 AUTOTRIP
79 AUTORECLOSER LINE
CB K330 AUTOTRIP
SECTION BREAKER BLOCKED
OHL JOUF-2 CKT-2 CB K310 79
AUTORECLOER BLOCKED
OHL JOUF-2 CKT-2 CB K330 79
AUTORECLOSER BLOCKED

G- Injection at S/S DAJ BSP CKT-2: Differential Trip Test (CH2 FAIL, CH1 HEALTHY) & Prot IN

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 61 of 69

Alarms At : S/S DAJ BSP CKT-2 Alarms At : S/S JOUF-2


Simulation At
S/S DAJ BSP CKT-2
Relay LED Relay OPTD SAS Relay OPTD Relay LED SAS

87L DIFF. TRIP * 87L Diff Trip OHL JOUF-2 CKT-2 FPFM 87L-1 94F1-1 * 87L Diff FPFM 87L-1 DIFF. I/T SEND
* AR BLOCK DIFF. R-PH OPTD 94F1-1X Trip FPFM 87L-1 DIFF. I/T RECEIVED
94F1 OHL JOUF-2 CKT-2 FPFM 87L-1 85S1-1 * AR BLOCK FPFM 87L-1 DIFF. R-PH OPTD
94F1X DIFF. Y-PH OPTD 85R1-1 FPFM 87L-1 DIFF. Y-PH OPTD
85S1-1 OHL JOUF-2 CKT-2 FPFM 87L-1 85R1-1A FPFM 87L-1 DIFF. B-PH OPTD
85R1-1 DIFF. B-PH OPTD FPFM 94-1 TRIP RELAY OPTD
OHL JOUF-2 CKT-2 FPFM FPFM 85S1-1 FAST I/T-1 RELAY OPTD
INSTANTANEOUS RELAY 94F-1 FPFM 85R1-1A FAST I/T-1 RELAY OPTD
OPTD 79 AUTORECLOSER LINE SECTION
OHL JOUF-2 CKT-2 85S1-1 FAST BREAKER INITIATED
I/T-1 SEND RELAY OPTD 79 AUTORECLOSER CENTRE BREAKER
OHL JOUF-2 CKT-2 85R1-1 FAST INITIATED
I/T-1 RECV. RELAY OPTD 380KV FAULT RECORDER TRIGGERED
OHL JOUF-2 CKT-2 CB K310 79 AUTORECLOSER LINE SECTION
AUTORECLOSER INITIATED BREAKER BLOCKED
OHL JOUF-2 CKT-2 CB K330
AUTORECLOSER INITIATED
CBF-1 PROTECTION INITIATED
(BUS CB)
CBF-1 PROTECTION INITIATED
(MID CB)
CBF-2 PROTECTION INITIATED
(BUS CB)
CBF-2 PROTECTION INITIATED
(MID CB)
CB K310 AUTOTRIP
CB K330 AUTOTRIP
OHL JOUF-2 CKT-2 CB K310 79

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 62 of 69

AUTORECLOER BLOCKED
OHL JOUF-2 CKT-2 CB K330 79
AUTORECLOSER BLOCKED

H- Injection at S/S DAJ BSP CKT-2: Differential Trip Test (CH2 FAIL, CH1 HEALTHY) & Prot OUT at DAJ

Alarms At : S/S DAJ BSP CKT-2 Alarms At : S/S JOUF-2


Simulation At
S/S DAJ BSP CKT-2 Relay LED Relay OPTD SAS Relay OPTD Relay LED SAS

* 87L Diff Trip OHL JOUF-2 CKT-2 FPFM 87L-1 94F1-1 * 87L Diff FPFM 87L-1 DIFF. I/T SEND
87L DIFF. TRIP * AR BLOCK DIFF. R-PH OPTD 94F1-1X Trip FPFM 87L-1 DIFF. I/T RECEIVED
85R1-1 OHL JOUF-2 CKT-2 FPFM 87L-1 85S1-1 * AR BLOCK FPFM 87L-1 DIFF. R-PH OPTD
DIFF. Y-PH OPTD FPFM 87L-1 DIFF. Y-PH OPTD
OHL JOUF-2 CKT-2 FPFM 87L-1 FPFM 87L-1 DIFF. B-PH OPTD
DIFF. B-PH OPTD FPFM 94F-1 TRIP RELAY OPTD
OHL JOUF-2 CKT-2 85R1-1 FAST FPFM 85S1-1 FAST I/T-1 RELAY OPTD
I/T-1 RECV. RELAY OPTD 79 AUTORECLOSER LINE SECTION
OHL JOUF-2 CKT-2 CB K310 BREAKER INITIATED
AUTORECLOSER INITIATED 79 AUTORECLOSER CENTRE BREAKER
OHL JOUF-2 CKT-2 CB K330 INITIATED
AUTORECLOSER INITIATED 380KV FAULT RECORDER TRIGGERED
CBF-1 PROTECTION INITIATED 79 AUTORECLOSER LINE SECTION
(BUS CB) BREAKER BLOCKED
CBF-1 PROTECTION INITIATED
(MID CB)

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 63 of 69

CBF-2 PROTECTION INITIATED


(BUS CB)
CBF-2 PROTECTION INITIATED
(MID CB)
CB K310 AUTOTRIP
CB K330 AUTOTRIP
OHL JOUF-2 CKT-2 CB K310 79
AUTORECLOER BLOCKED
OHL JOUF-2 CKT-2 CB K330 79
AUTORECLOSER BLOCKED

I- Injection at S/S DAJ BSP CKT-2: Differential Trip Test (CH1 FAIL, CH2 HEALTHY) & Prot. IN in JOUF-2 and Dawmat Al-Jandal

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 64 of 69

Alarms At: S/S DAWMAT AL-JANDAL Alarms At: S/S JOUF-2 380/132/13.8KV
Simulation at
S/S DAJ BSP CKT-2
Relay LED Relay OPTD SAS Relay OPTD Relay LED SAS

87L DIFF. TRIP * 87L Diff Trip OHL JOUF-2 CKT-2 FPFM 87L-1 94F1-1 * 87L Diff FPFM 87L-1 DIFF. I/T SEND
* AR BLOCK DIFF. R-PH OPTD 94F1-1X Trip FPFM 87L-1 DIFF. I/T RECEIVED
94F1 OHL JOUF-2 CKT-2 FPFM 87L-1 85S1-1 * AR BLOCK FPFM 87L-1 DIFF. R-PH OPTD
94F1X DIFF. Y-PH OPTD 85R1-1 FPFM 87L-1 DIFF. Y-PH OPTD
85S1-1 OHL JOUF-2 CKT-2 FPFM 87L-1 85R1-1A FPFM 87L-1 DIFF. B-PH OPTD
85R1-1 DIFF. B-PH OPTD FPFM 94-1 TRIP RELAY OPTD
OHL JOUF-2 CKT-2 FPFM FPFM 85S1-1 FAST I/T-1 RELAY OPTD
INSTANTANEOUS RELAY 94F-1 FPFM 85R1-1A FAST I/T-1 RELAY OPTD
OPTD 79 AUTORECLOSER LINE SECTION
OHL JOUF-2 CKT-2 85S1-1 FAST BREAKER INITIATED
I/T-1 SEND RELAY OPTD 79 AUTORECLOSER CENTRE BREAKER
OHL JOUF-2 CKT-2 85R1-1 FAST INITIATED
I/T-1 RECV. RELAY OPTD 380KV FAULT RECORDER TRIGGERED
OHL JOUF-2 CKT-2 CB K310 79 AUTORECLOSER LINE SECTION
AUTORECLOSER INITIATED BREAKER BLOCKED
OHL JOUF-2 CKT-2 CB K330
AUTORECLOSER INITIATED
CBF-1 PROTECTION INITIATED
(BUS CB)
CBF-1 PROTECTION INITIATED
(MID CB)
CBF-2 PROTECTION INITIATED
(BUS CB)
CBF-2 PROTECTION INITIATED
(MID CB)
CB K310 AUTOTRIP
CB K330 AUTOTRIP
OHL JOUF-2 CKT-2 CB K310 79

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 65 of 69

AUTORECLOER BLOCKED
OHL JOUF-2 CKT-2 CB K330 79
AUTORECLOSER BLOCKED

J- Injection at S/S DAJ BSP CKT-2: Differential Trip Test (CH1 FAIL, CH2 HEALTHY) & Prot. OUT in Dawmat Al-Jandal, Prot. In AT
JOUF-2
Simulation At Alarms At: S/S DAWMAT AL-JANDAL Alarms At: JOUF-2 380/132/13.8 KV
S/S DAWMAT AL-
JANDAL Relay LED Relay OPTD SAS Relay OPTD Relay LED SAS

* 87L Diff Trip OHL JOUF-2 CKT-2 FPFM 87L-1 94F1-1 * 87L Diff FPFM 87L-1 DIFF. I/T SEND
87L DIFF. TRIP * AR BLOCK DIFF. R-PH OPTD 94F1-1X Trip FPFM 87L-1 DIFF. I/T RECEIVED
85R1-1 OHL JOUF-2 CKT-2 FPFM 87L-1 85S1-1 * AR BLOCK FPFM 87L-1 DIFF. R-PH OPTD
DIFF. Y-PH OPTD FPFM 87L-1 DIFF. Y-PH OPTD
OHL JOUF-2 CKT-2 FPFM 87L-1 FPFM 87L-1 DIFF. B-PH OPTD
DIFF. B-PH OPTD FPFM 94F1-1 TRIP RELAY OPTD
OHL JOUF-2 CKT-2 85R1-1 FAST FPFM 85S1-1 FAST I/T-1 RELAY OPTD
I/T-1 RECV. RELAY OPTD 79 AUTORECLOSER LINE SECTION
OHL JOUF-2 CKT-2 CB K310 BREAKER INITIATED
AUTORECLOSER INITIATED 79 AUTORECLOSER CENTRE BREAKER
OHL JOUF-2 CKT-2 CB K330 INITIATED
AUTORECLOSER INITIATED 380KV FAULT RECORDER TRIGGERED
CBF-1 PROTECTION INITIATED 79 AUTORECLOSER LINE SECTION
(BUS CB) BREAKER BLOCKED
CBF-1 PROTECTION INITIATED
(MID CB)
CBF-2 PROTECTION INITIATED
(BUS CB)
CBF-2 PROTECTION INITIATED
(MID CB)
CB K310 AUTOTRIP

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 66 of 69

CB K330 AUTOTRIP
OHL JOUF-2 CKT-2 CB K310 79
AUTORECLOER BLOCKED
OHL JOUF-2 CKT-2 CB K330 79
AUTORECLOSER BLOCKED

INTER TRIP TEST: -

A- Injection at S/S JOUF-2 BSP CKT-2


Diff Setting at JOUF-2 : IDMin = 0.4 IB
Change Diff Setting at DAJ : IDMin = 1 IB
Inject 3 phase current at JOUF-2 = 0.5

Simulation At Alarms At S/S JOUF-2 BSP Alarms At: S/S DAWMAT AL-JANDAL
S/S JOUF-2
BSP Relay LED Relay OPTD SAS Relay OPTD Relay LED SAS

FPFM 87L-1 DIFF. I/T SEND OHL JOUF-2 CKT-2 FPFM 87L-1 DIFF. R-
94F1-1 FPFM 87L-1 DIFF. I/T RECEIVED PH OPTD
87L DIFF. TRIP 94F1-1X * 87L Diff FPFM 87L-1 DIFF. R-PH OPTD 94F1 OHL JOUF-2 CKT-2 FPFM 87L-1 DIFF. Y-
* 87L Diff Trip
85S1-1 Trip FPFM 87L-1 DIFF. Y-PH OPTD 94F1X PH OPTD
* AR BLOCK
85R1-1 * AR BLOCK FPFM 87L-1 DIFF. B-PH OPTD 85S1-1 OHL JOUF-2 CKT-2 FPFM 87L-1 DIFF. B-
85R1-1A FPFM 94-1 TRIP RELAY OPTD 85R1-1 PH OPTD
FPFM 85S1-1 FAST I/T-1 RELAY OHL JOUF-2 CKT-2 FPFM

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 67 of 69

INSTANTANEOUS RELAY 94F-1 OPTD


OHL JOUF-2 CKT-2 85S1-1 FAST I/T-1
SEND RELAY OPTD
OHL JOUF-2 CKT-2 85R1-1 FAST I/T-1
RECV. RELAY OPTD
OPTD OHL JOUF-2 CKT-2 CB K310
FPFM 85R1-1A FAST I/T-1 RELAY AUTORECLOSER INITIATED
OPTD OHL JOUF-2 CKT-2 CB K330
79 AUTORECLOSER LINE AUTORECLOSER INITIATED
SECTION BREAKER INITIATED CBF-1 PROTECTION INITIATED (BUS CB)
79 AUTORECLOSER CENTRE CBF-1 PROTECTION INITIATED (MID CB)
BREAKER INITIATED CBF-2 PROTECTION INITIATED (BUS CB)
380KV FAULT RECORDER CBF-2 PROTECTION INITIATED (MID CB)
TRIGGERED CB K310 AUTOTRIP
79 AUTORECLOSER LINE CB K330 AUTOTRIP
SECTION BREAKER BLOCKED OHL JOUF-2 CKT-2 CB K310 79
AUTORECLOER BLOCKED
OHL JOUF-2 CKT-2 CB K330 79
AUTORECLOSER BLOCKED

B- Injection at S/S DAJ BSP CKT-2


Diff Setting at DAJ: IDMin = 0.4 IB
Change Diff Setting at JOUF-2: IDMin = 1 IB
Inject 3 phase current at DAJ = 0.5

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 68 of 69

Alarms At: S/S DAJ BSP CKT-2 Alarms At: S/S JOUF-2
Simulation At
S/S DAJ BSP CKT-2
Relay LED Relay OPTD SAS Relay OPTD Relay LED SAS

87L DIFF. TRIP * 87L Diff Trip OHL JOUF-2 CKT-2 FPFM 87L-1 94F1-1 * 87L Diff FPFM 87L-1 DIFF. I/T SEND
* AR BLOCK DIFF. R-PH OPTD 94F1-1X Trip FPFM 87L-1 DIFF. I/T RECEIVED
94F1 OHL JOUF-2 CKT-2 FPFM 87L-1 85S1-1 * AR BLOCK FPFM 87L-1 DIFF. R-PH OPTD
94F1X DIFF. Y-PH OPTD 85R1-1 FPFM 87L-1 DIFF. Y-PH OPTD
85S1-1 OHL JOUF-2 CKT-2 FPFM 87L-1 85R1-1A FPFM 87L-1 DIFF. B-PH OPTD
85R1-1 DIFF. B-PH OPTD FPFM 94-1 TRIP RELAY OPTD
OHL JOUF-2 CKT-2 FPFM FPFM 85S1-1 FAST I/T-1 RELAY OPTD
INSTANTANEOUS RELAY 94F-1 FPFM 85R1-1A FAST I/T-1 RELAY OPTD
OPTD 79 AUTORECLOSER LINE SECTION
OHL JOUF-2 CKT-2 85S1-1 FAST BREAKER INITIATED
I/T-1 SEND RELAY OPTD 79 AUTORECLOSER CENTRE BREAKER
OHL JOUF-2 CKT-2 85R1-1 FAST INITIATED
I/T-1 RECV. RELAY OPTD 380KV FAULT RECORDER TRIGGERED
OHL JOUF-2 CKT-2 CB K310 79 AUTORECLOSER LINE SECTION
AUTORECLOSER INITIATED BREAKER BLOCKED
OHL JOUF-2 CKT-2 CB K330
AUTORECLOSER INITIATED
CBF-1 PROTECTION INITIATED
(BUS CB)
CBF-1 PROTECTION INITIATED
(MID CB)
CBF-2 PROTECTION INITIATED
(BUS CB)
CBF-2 PROTECTION INITIATED
(MID CB)
CB K310 AUTOTRIP
CB K330 AUTOTRIP
OHL JOUF-2 CKT-2 CB K310 79

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021


Description: Contract No:
End TO End Test for RED670– 87L1-DIS/DEF Test
4400011600
Customer: End Client:
ALBABTAIN CONTRACTING COMPANY NG-SEC
Site: Panel / Designation / Location no.: Sheet:
S/S DAWMAT AL-JANDAL BSP 8L.C03A+R1 JOUF-2 CKT-2 Page 69 of 69

AUTORECLOER BLOCKED
OHL JOUF-2 CKT-2 CB K330 79
AUTORECLOSER BLOCKED
OHL JOUF-2 CKT-2 CB K330 79
AUTORECLOSER BLOCKED

Tested by: Witnessed by:


Name: Eng. Mohamed Elsharkawy (BAB-064) Name: CSD Eng. Sanjit SEN

Signature & Date: 06/04/2021 Signature & Date: 06/04/2021