You are on page 1of 3

TEST REPORT FOR

SEL MOTOR PROTECTION SEL 710


RELAY-SEL 710
DATE: 21.06.2018

Project : SINGARENI THERMAL POWER PLANT, TELANGANA

Client : M/s STEAG ENEGY SERVICES PVT LTD

End Client : M/S SINGARENI

Panel Ref : CWPUMP ,PANEL NO:16

Relay Make & Model : SEL-710

Serial No : 3140070044

CT & VT Ratio : 400/1A

1. Phase Over Current TOC – [ 51P] Non Directional Current (I) – 4XFLA A : TD- 0s ,FLA:0.607

Phase Set Current (A) Inj. Current(A) Actual Tripping Trip Time(s)
Time (s)
R-N 2.428 2.428 0 0.038

Y-N 2.428 2.428 0 0.041

B-N 2.428 2.428 0 0.041

2. [51N ] Current (I) – 5A : Time Delay- 0 s

Phase Set Current (A) Inj. Current(A) Actual Tripping Trip Time(s)
Time (s)
R-N 5 5 0 0.042

Y-N 5 5 0 0.043

B-N 5 5 0 0.039

3. JAM Current (I) – 2.5XFLA A ,Time Delay- 5 s FLA:0.607

PROTECTION ENGG M/S STEAG ENERGY SERVICE LTD

JAYAMKONDAN V MR.JEYAKUMAR
TEST REPORT FOR
SEL MOTOR PROTECTION SEL 710
RELAY-SEL 710
DATE: 21.06.2018

Phase Set Current (A) Inj. Current(A) Actual Tripping Trip Time(s)
Time (s)
R-N 1.517 1.517 5 4.98

Y-N 1.517 1.517 5 5.01

B-N 1.517 1.517 5 5.12

4. DIFFERENTIAL PROTECTION Current (I) – 0.1 A ,Time Delay- 0 s

Phase Set Current (A) Inj. Current(A) Actual Tripping Trip Time(s)
Time (s)
R-N 0.1 0.1 0 0.030

Y-N 0.1 0.1 0 0.022

B-N 0.1 0.1 0 0.031

5. CURRENT IMBALANCE Current (I) – 10%A ,Time Delay- 5 s

Phase Set Current (A) Inj. Current(A) Actual Tripping Trip Time(s)
Time (s)
R-N 0.546 0.546 5 5.2

Y-N 0.546 0.546 5 5.10

B-N 0.546 0.546 5 4.98

6. UNDER VOLTAGE Voltage (I) – 0.7xVnm ,Time Delay- 2 s

Phase Sett Voltage (v) Inj. Voltage(v) Actual Tripping Trip Time(s)
Time (s)
PROTECTION ENGG M/S STEAG ENERGY SERVICE LTD

JAYAMKONDAN V MR.JEYAKUMAR
TEST REPORT FOR
SEL MOTOR PROTECTION SEL 710
RELAY-SEL 710
DATE: 21.06.2018

R-N 44 44 2 1.911

Y-N 44 44 2 2.03

B-N 44 44 2 2.09

7. THERMAL OVER LOAD

Phase Inj. Current(A) Trip Time(s)

R,Y,B 0.8 530

R,Y,B 0.9 340

R,Y,B 1.0 220

Check List:

1. LED Functions has been checked and found ok.


2. Relay operations has been found satisfied and fit for service.

PROTECTION ENGG M/S STEAG ENERGY SERVICE LTD

JAYAMKONDAN V MR.JEYAKUMAR

You might also like