You are on page 1of 26

COMMISSIONING REPORT 110V

Instruction Page

Thanks for your interest in Alcad’s products & services and downloading this document.

This Ni-Cd battery commissioning report consists of this instruction page and 5 sections.

The Cover page

PART A: Charging record

PART B: Discharge record (not for capacity purpose)

PART C: Re-charging record

PART D: Capacity test record

This commissioning shall be performed by a qualified & trained personnel.

IMPORTANT: Please strictly follow Alcad Installation and Operating Instructions sheet
which has been provided in the battery shipment packaging.
Installation and Operating Instructions sheet can also be downloaded from our website on
www.alcad.com

Note that Alcad can perform the commissioning for you.


Please contact your local Alcad’s representative on www.alcad.com for more details.

This PDF file format can also be filled in directly


on a PC for easier electronic forward back to Alcad.
Please use Adobe Reader XI or newer
(free on Adobe web sites)
Once completed, dated and signed,
please return all pages to:
E-mail: commissioningreports@alcad.com
Fax: + 46 491 681 10
ALCAD Nickel-Cadmium Batteries Commissioning Report
Ref N° ____________________

Customer order reference: ______________________


Commissioning date (yy/mm/dd): ________________
Battery location: ______________________________
Project reference: ______________________________
Battery type: ___________________________________ No of cells: _______________ Date code (example 1306) _______________________
Delivered: Filled and charged Electrolyte: Solid Charger manufacturer: _________________________
Empty and discharged Liquid Model: ______________________________________

Charging method
Constant current Constant Voltage (I/U characteristics) Charging time (yy/mm/dd & hh:mm):
Charging current (start) _________ A Charging current (start) _________ A Date from: _____________ to: ______________
Charging voltage (start) _________ V Charging voltage (start) _________ V Time from: _____________ to: ______________
Charging current (end) _________ A Charging current (end) _________ A
Charging voltage (end) _________ V Charging voltage (end) _________ V

Sheet 1 of 7
Battery Commissioning Report

PART A: CHARGING RECORD 1st charge (0 to 15 hours)


No. Hours 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
A1

Sheet 2 of 25
Battery Commissioning Report

PART A: CHARGING RECORD 1st charge (0 to 15 hours)


No. Hours 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
A2

Sheet 3 of 25
Battery Commissioning Report

PART A: CHARGING RECORD 1st charge (0 to 15 hours)


No. Hours 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
A3

Sheet 4 of 25
Battery Commissioning Report

PART A: CHARGING RECORD 1st charge (0 to 15 hours)


No. Hours 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
A4

Sheet 5 of 25
Battery Commissioning Report

PART A: CHARGING RECORD 1st charge (16 to 30 hours)


No. Hours 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
A5

Sheet 6 of 25
Battery Commissioning Report

PART A: CHARGING RECORD 1st charge (16 to 30 hours)


No. Hours 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
A6

Sheet 7 of 25
Battery Commissioning Report

PART A: CHARGING RECORD 1st charge (16 to 30 hours)


No. Hours 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
A7

Sheet 8 of 25
Battery Commissioning Report

PART A: CHARGING RECORD 1st charge (16 to 30 hours)


No. Hours 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
Commissioning carried out by: Acceptance (customer) carried out by: Acceptance (end-user) carried out by:
A8
Company name Company name Company name
Signature Signature Signature
Name Name Name Sheet 9 of 25
Date (yy/mm/dd) Date (yy/mm/dd) Date (yy/mm/dd)
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
Battery Commissioning Report

PART B: DISCHARGE RECORD (not for capacity purpose)


No. Hours 0 1 2 3 4 4.25 4.5 4.75 5 5.5
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
B1

Sheet 10 of 25
Battery Commissioning Report

PART B: DISCHARGE RECORD (not for capacity purpose)


No. Hours 0 1 2 3 4 4.25 4.5 4.75 5 5.5
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
B1
B2

Sheet 11
10 of 25
Battery Commissioning Report

PART B: DISCHARGE RECORD (not for capacity purpose)


No. Hours 0 1 2 3 4 4.25 4.5 4.75 5 5.5
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
B1
B3

Sheet 12
10 of 25
Battery Commissioning Report

PART B: DISCHARGE RECORD (not for capacity purpose)


No. Hours 0 1 2 3 4 4.25 4.5 4.75 5 5.5
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
Commissioning carried out by: Acceptance (customer) carried out by: Acceptance (end-user) carried out by:
B4
Company name Company name Company name
Signature Signature Signature
Name Name Name Sheet 13 of 25
Date (yy/mm/dd) Date (yy/mm/dd) Date (yy/mm/dd)
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
Battery Commissioning Report

PART C: RE-CHARGING RECORD 2nd charge (0 to 15 hours)


No. Hours 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
C1

Sheet 14 of 25
Battery Commissioning Report

PART C: RE-CHARGING RECORD 2nd charge (0 to 15 hours)


No. Hours 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
C1
C2

Sheet 15
14 of 25
Battery Commissioning Report

PART C: RE-CHARGING RECORD 2nd charge (0 to 15 hours)


No. Hours 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
C1
C3

Sheet 16
14 of 25
Battery Commissioning Report

PART C: RE-CHARGING RECORD 2nd charge (0 to 15 hours)


No. Hours 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
C1
C4

Sheet 17
14 of 25
Battery Commissioning Report

PART C: RE-CHARGING RECORD 2nd charge (16 to 30 hours)


No. Hours 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
C5

Sheet 18 of 25
Battery Commissioning Report

PART C: RE-CHARGING RECORD 2nd charge (16 to 30 hours)


No. Hours 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
C5
C6

Sheet 19
18 of 25
Battery Commissioning Report

PART C: RE-CHARGING RECORD 2nd charge (16 to 30 hours)


No. Hours 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
C5
C7

Sheet 20
18 of 25
Battery Commissioning Report

PART C: RE-CHARGING RECORD 2nd charge (16 to 30 hours)


No. Hours 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
Commissioning carried out by: Acceptance (customer) carried out by: Acceptance (end-user) carried out by:
C8
Company name Company name Company name
Signature Signature Signature
Name Name Name Sheet 21 of 25
Date (yy/mm/dd) Date (yy/mm/dd) Date (yy/mm/dd)
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
Battery Commissioning Report

PART D: CAPACITY TEST RECORD


No. Hours 0 1 2 3 4 4.25 4.5 4.75 5 5.5
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
D1

Sheet 22 of 25
Battery Commissioning Report

PART D: CAPACITY TEST RECORD


No. Hours 0 1 2 3 4 4.25 4.5 4.75 5 5.5
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
D1
D2

Sheet 23
22 of 25
Battery Commissioning Report

PART D: CAPACITY TEST RECORD


No. Hours 0 1 2 3 4 4.25 4.5 4.75 5 5.5
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)
D1
D3

Sheet 24
22 of 25
Battery Commissioning Report

PART D: CAPACITY TEST RECORD


No. Hours 0 1 2 3 4 4.25 4.5 4.75 5 5.5
Time (hh:mm)
Charg. voltage
Charg. current
Ambient T (°C)
Electrolyte T (°C)

Cell N°
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
Commissioning carried out by: Acceptance (customer) carried out by: Acceptance (end-user) carried out by:
D4
Company name Company name Company name
Signature Signature Signature
Name Name Name Sheet 25 of 25
Date (yy/mm/dd) Date (yy/mm/dd) Date (yy/mm/dd)
Please record the readings of the individual cell voltage with 3 digits after the dot (ex: 1.413)

You might also like