SITE TEST REPORT Date :


sibilities
Legend Contractor’s name: Customer:
Hadi Haider Company NG-EOA
CSD Contract No. :
Name of substation: Jubail Commercial Port 115/13.8kV Susbtation 2 071-C20R
Page 1 of 10
CURRENT TRANSFORMER
Panel No: Equip. No.: Dwg. Ref.: Record No.:

Have all relevant safety instructions been followed?


CURRENT TRANSFORMER TEST

..\WorkInstructions\23.pdf
For Mechanical Check/Visual Inspection and Electrical Tests Use C.L. of W.I.23

A. GENERAL DATA & INFORMATION :

Bay / Location:

Make :

Phase A B C
Sr.No.
Ratio
Class
Type
Rct
Burden
Vkp
Imag
Application

ELECTRICAL TEST:

1. Insulation Resistance Test:

Instrument : Make:

Model/ Sl.No.: Applied Voltage: Primary to Ground 5 KV DC for one minute.


Primary to Secondary 2.5 KV DC for one minute.
Secondary to Ground and Core to core 1 KV DC for one minute.
Criteria : More than 1000 M Ohms for Primary – Secondary / Earth
More than 10 M Ohms for Secondary - Earth and between secondary’s.

Applied Between IR Value in Gega Ohms Result


A Phase B Phase C Phase
Primary - Earth
Primary - Secondary
Secondary - Earth

2. Secondary Winding Resistance Check::

TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
SITE TEST REPORT Date :
Contractor’s name: Customer:
Hadi Haider Company NG-EOA
Contract No. :
Name of substation: Jubail Commercial Port 115/13.8kV Susbtation 2 071-C20R
Page 2 of 10
CURRENT TRANSFORMER
Panel No: Equip. No.: Dwg. Ref.: Record No.:
Instrument: Make:
Model/Sl.No.: Criteria: Within +/- 5% of Factory test Report
Phase A: Amb.Temp. : ْ C

Factory
Measured Value in Ohm
Value in
Terminal Ratio Ohms at 75ْ
ْ C 75ْ C C % Error Remarks

Phase B: Amb.Temp. : ْ C

Factory
Measured Value in Ohm
Value in
Terminal Ratio Ohms at 75ْ
ْ C 75ْ C C % Error Remarks

Phase C: Amb.Temp. : ْ C

Factory
Measured Value in Ohm
Value in
Terminal Ratio Ohms at 75ْ
ْ C 75ْ C C % Error Remarks

Formula to convert winding resistance to reference temperature at 75  C for copper winding.

TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
SITE TEST REPORT Date :
Contractor’s name: Customer:
Hadi Haider Company NG-EOA
Contract No. :
Name of substation: Jubail Commercial Port 115/13.8kV Susbtation 2 071-C20R
Page 3 of 10
CURRENT TRANSFORMER
Panel No: Equip. No.: Dwg. Ref.: Record No.:

NOTE: 1.
Rc = Calculated value at 75  C
Rm = Measurement value which contained a measurement cable.

NOTE: 2
Calculated 75  C Rc = (Rm-Rx) x (234.5+75)
(234.5+Ta)

Rx = Resistance value of the measurement cable.


Ta = Ambient Temperature  C

NOTE: 3

Resistance value of measurement cable Rx = _______ Ω

3. Polarity Test:

Instrument: Make: Sr.No:

POLARITY CHECKED AND FOUND OKAY


CT Ref. Phase A Phase B Phase C

Core 1

4. Ratio Test:

Instrument: Make: Model/Sr.No.:

TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
SITE TEST REPORT Date :
Contractor’s name: Customer:
Hadi Haider Company NG-EOA
Contract No. :
Name of substation: Jubail Commercial Port 115/13.8kV Susbtation 2 071-C20R
Page 4 of 10
CURRENT TRANSFORMER
Panel No: Equip. No.: Dwg. Ref.: Record No.:
Phase A:

Primary Test Current Secondary Measured


Terminal Ratio Current % Error

Phase B:

Primary Test Current Secondary Measured


Terminal Ratio Current % Error

Phase C:
Primary Test Current Secondary Measured
Terminal Ratio Current % Error

5. Magnetization Curve Measurement:

Instrument: Make: Sr.No.


TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
SITE TEST REPORT Date :
Contractor’s name: Customer:
Hadi Haider Company NG-EOA
Contract No. :
Name of substation: Jubail Commercial Port 115/13.8kV Susbtation 2 071-C20R
Page 5 of 10
CURRENT TRANSFORMER
Panel No: Equip. No.: Dwg. Ref.: Record No.:

Criteria: The %age error for Magnetizing current shall be within +/- 5% of the factory Test Report.

Note: All CT cores shall be demagnetized after the tests are carried out.

Phase A CT Serial No.:

Current from
Sl.No. Voltage (V) Current (mA) Magnetizing Curve %age Error
(mA)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

Note: CT Analyzer Test Results will be attached.

Phase B CT Serial No.:

Current from
Sr.No. Voltage (V) Current (mA) Magnetizing Curve %age Error
TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
SITE TEST REPORT Date :
Contractor’s name: Customer:
Hadi Haider Company NG-EOA
Contract No. :
Name of substation: Jubail Commercial Port 115/13.8kV Susbtation 2 071-C20R
Page 6 of 10
CURRENT TRANSFORMER
Panel No: Equip. No.: Dwg. Ref.: Record No.:
(mA)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

Note: CT Analyzer Test Results will be attached

Phase C CT Serial No.:

Current from
Sr.No. Voltage (V) Current (mA) Magnetizing Curve %age Error
(mA)
1
2
3
4

TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
SITE TEST REPORT Date :
Contractor’s name: Customer:
Hadi Haider Company NG-EOA
Contract No. :
Name of substation: Jubail Commercial Port 115/13.8kV Susbtation 2 071-C20R
Page 7 of 10
CURRENT TRANSFORMER
Panel No: Equip. No.: Dwg. Ref.: Record No.:
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

Note: CT Analyzer Test Results will be attached.

6. Burden Test:

Injected Current:
Phase Description Core-1 Core-2 Core-3 Core-4 Remarks
A Terminal No.
Ratio
Measured Voltage (V)

TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
SITE TEST REPORT Date :
Contractor’s name: Customer:
Hadi Haider Company NG-EOA
Contract No. :
Name of substation: Jubail Commercial Port 115/13.8kV Susbtation 2 071-C20R
Page 8 of 10
CURRENT TRANSFORMER
Panel No: Equip. No.: Dwg. Ref.: Record No.:
Calculated Burden (V)
Design Burden (VA)
Terminal No.
Ratio
B Measured Voltage (V)
Calculated Burden (V)
Design Burden (VA)
Terminal No.
Ratio
C Measured Voltage (V)
Calculated Burden (V)
Design Burden (VA)

7. PHASE TEST:

8. Verification of CT Secondary Circuits by Primary Injection Method:

Injected Measured Current in Terminal (A)


Phase Current Purpose Remarks
Core No. Local Control Relay Panel /
(A)
Cubicle Control Panel
A 1
2
3

TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
SITE TEST REPORT Date :
Contractor’s name: Customer:
Hadi Haider Company NG-EOA
Contract No. :
Name of substation: Jubail Commercial Port 115/13.8kV Susbtation 2 071-C20R
Page 9 of 10
CURRENT TRANSFORMER
Panel No: Equip. No.: Dwg. Ref.: Record No.:
4
1
2
B
3
4
1
2
C
3
4

9. Insulation power Factor:

Test instrument :
Make :
Model/SI No :
Oil Temp.gauge reading :
Criteria :
Amp temp

Measurements Test Voltage(Kv) Capacitance (nF) Power factor % Power factor % after
measured correction
CH+CHL
CH
CHL
CL+CLH
CL
CLH

10. High voltage Test:

11. INTERCORE CORE COUPLING TEST: (verify for differential core only)

Core -1 Excite Voltage across Volt across Volt across Volt across
Core -2, all other sec. Core -3, all other sec. Core -4 all other sec. Core -5 all other sec.
wind. shorted & wind. shorted & Primary wind. shorted & wind. shorted &
Primary open open Primary open Primary open

Core -2 Excite Voltage across Voltage across Volt across Volt across
Core -1, all other sec. Core -3, all other sec. Core -4 all other sec. Core -5 all other sec.
wind. shorted & wind. shorted & Primary wind. shorted & wind. shorted &

TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________
SITE TEST REPORT Date :
Contractor’s name: Customer:
Hadi Haider Company NG-EOA
Contract No. :
Name of substation: Jubail Commercial Port 115/13.8kV Susbtation 2 071-C20R
Page 10 of 10
CURRENT TRANSFORMER
Panel No: Equip. No.: Dwg. Ref.: Record No.:
Primary open open Primary open Primary open

Core -3 Excite Voltage across Voltage across Volt across Volt across
Core -1, all other sec. Core -2, all other sec. Core -4 all other sec. Core -5 all other sec.
wind. shorted & wind. shorted & Primary wind. shorted & wind. shorted &
Primary open open Primary open Primary open

Core -4 Excite Voltage across Voltage across Voltage across Voltage across
Core -1, all other sec. Core -2, all other sec. Core -3, all other sec. Core -5, all other sec.
wind. shorted & wind. shorted & Primary wind. shorted & wind. shorted &
Primary open open Primary open Primary open

Core -5 Excite Voltage across Voltage across Voltage across Voltage across
Core -1, all other sec. Core -2, all other sec. Core -3, all other sec. Core -5, all other sec.
wind. shorted & wind. shorted & Primary wind. shorted & wind. Shorted &
Primary open open Primary open Primary open

Note: To determine if there is coupling between cores, the excitation test should be done, and the voltage across the full
winding on each of the adjacent cores should be measured one at a time with all other current transformer secondary
windings shorted. A high impedance voltmeter (20000Ω/ V or greater) will read less than 1V or 2 V if there is no inter-core
coupling. If there is coupling, the voltage will be substantially higher (Reference IEEE StedC57.13.1-2006)

TEST DATE: TEST EQUIPMENT CALIB.DATE & DETAIL

TESTING ENGINEER CSD- Engineer

Signature: ________________ Signature: ________________


Name : ________________ Name : ________________