Concrete Works

A-2.2/10-10-01 - Checklist For Screed


Site Work Activity

CHECKLIST FOR SCREED


Site
Location
Date
Drawing Reference No.
Refer to the approved WMS and relevant drawings

S.No Description Detail


A Substrate Surface Praparation

1 Substrate is clean from grease, oil and dirt Yes No NA

2 Substrate is free from cracks and exposed bars Yes No NA

3 waterproofing is done and completely cured Yes No NA

B Setting Out / Marking


1 Level pegs provided according to survey marking Yes No NA

2 Vertical and horizondal control provided to check all pegs Yes No NA

3 Sufficient number of level pegs, intervel provided at every _______meter Yes No NA

4 Correct finishing elevation, offset and drop Yes No NA

C Coordination with other works


1 Wall plastering within the area completed Yes No NA

2 Concrete services/fitting are laid /installed Yes No NA

D Mixing & Batching Mortat Screed


1 Clean sand used for mortar screed mixing Yes No NA

2 Material used as per specification Yes No NA

E Screeding & Finishing


1 Finishing level, alingnment & evenness are acceptable Yes No NA

2 Check the falls Yes No NA

Observations:
Whether the above points checked and in order? YES NO

Corrective Action Proposed

Site Engineer QA/QC Engineer Client


SPCPL SPCPL TRPL