3.0INSPECTIONBYQA/QCORSENIOROFFICERSandACTIONTAKEN
(if provision inspection isdone)
NA
PART-II- Observation of QM for Ongoing/Completed work
1.0QUALITYARRANGEMENT-Observations(InCaseOfOngingWorkOnly)
Observations:
1 - Y Y Y Y
*IfEngineerofAgencyisNotPresentonSiteThenProposedDissectionasperTenderClause(i.eRs1650
0/-Month)
Grading : “S”
1 YES YES
- - - - -
Grading : “NA”
3.0GEOMETRICS:TheQMShouldTakeatleasttwomeasurementsin1KMlengthandiffoundthat
theRoadwayandCarriagewayisinadequate QMmaytakemoreobservation.
Observation -item 3 a:Roadway width & Carriageway.
1 0/170 3.00 OK OK NA NA
-
2 0/10 0/10 3.00 OK OK NA NA
Section 2 -
4.0 EARTHWORK :
OBSERVATION -item 4 a:Quality of Material for Embankment/Sub Grade:
On Visual Classification
Location Identifythegroupsymbol&Write Quality of Material is acceptable(Y/N)
(Type of soll)
Grading : N.A
OBSERVATION -item 4 b:Workmanship for Embankment and sub Grade Construction:
Grading :N.A
N.A.
YES NO N.A
Grading :N.A
5. Sub-Base(GSB)
Observation-QualityofmaterialandWorkmanship:
IfMixmaterialisused(MixDesignisdoneornot)NO
Whether
LAB TEST (AS Per
Suitable Compaction is
Record)
Confirms form Adequate(Y/N) Observed
Prescribed
Sr to plasticity Thickness
Thickness
No Grading angle of Layer(In
Provided(Y/N)
(Y/N) PI&LL( mm)
Y/N)
MDD OM
CBR FDD FMC
gm/cc C
%
NA
Grading :NA
Filler
Volume of
material Whethe
Thickness filler
Aggregate is non- r
Location of each Thickness material
confirms to plastic Adequat Remarks
(Km) layer of is percent of
Grading(Y/N to e
WBM(MM) adequate(Y/N coarse
) desired compacti
) aggregate
extent onis
(Y/N) done
(Y/N)
NA NA NA NA NA NA NA -
Grading : NA
Filler
Volume of
material Whethe
Thickness filler
Aggregate is non- r
Location of each Thicknes material
confirms to plastic to Adequat Remarks
(Km) layer of s is percent of
Grading(Y/N) desired e
WMM adequate( coarse
extent compacti
Y/N) aggregate
(Y/N) onis
done
(Y/N)
NA
Grading : “NA”
7.0.BituminousCourse:PremixCarpet/SurfaceDressing/BM/BUSG/SealCoat/MSS;
QualityofMaterialAndWorkmanshipofBTLayer(InCaseofongoingWorks):
Whether Coarse
Write Mixing Temperature
Aggregate WhethertheBinderisof
Sr No Location and Whether it is in
confirm to approvedgrade(Y/N)
Permissible limits.(Y/N)
Grading(Y/N)
1 NA
YES NO N/A
YES NO N/A
Y
2.1 Camber Board Available or Not
Y
2.2 Site Cleaning is Properly Done
Y
2.3 Technical Staff / Sufficient Labour Available
7.0 C : Bitumen Extraction Tests Performed at Plant Site at the time inspection:
Wt of
%
Mix Wt of Mix % Asphalt % Asphalt
Wt.ofAs Asphalt Remarks
with Without w.r.tAggr reqd.asper
phalt(gm) w.r.t Pass/Fail
Asphalt Asphalt(gm) egate Specification
Mix
(gm)
Grading : S
8.1 Observations-WorkmanshipofBTlayer(Incaseofcompletedworks):(PaverSite)FOR
: BBC
Thick Whether
Write laying
ness Surface
andwhether
evennessis
Sr Location it is in
within Remarks
No (km) Whether permissible
Thickne acceptable
Thickness limit
ss in limit
is (Y/N)
mm (Y/N)
adequate(
Y/N)
1 0/170 37.50 Y Y Y -
2 0/10 37.50 Y Y Y -
Section 2
Grading : “S”
8.1.BObservations - Workmanship of BT layer(In case of completed works):(Paver Site)
FOR :Carpet
Thickn Whether
Write laying
ess Surface
andwhether
evenness is
Sr Location it is in
within Remarks
No (km) Whether permissible
Thicknes acceptable
Thickness limit
s in limits
is (Y/N)
mm (Y/N)
adequate(Y/
N)
1 0/170 25 Y Y Y -
2 0/10 25 Y Y Y -
Section 2
Grading : “S”
Observations-WorkmanshipofBTlayer(Incaseofcompletedworks):(PaverSite)FOR:Sealcoat
1 0/170 12 Y Y Y
2 0/10 12 Y Y Y
Section 2
Grading : “S”
NA
1
10.0 Cross Drainage Works:
Grading :S
11.0 CC Pavements
Thickness
Grading : N.A
12.0 Road Furniture and Marking:
Junction Board No
Km Stone Fixed No
Grading : “S”
14. COMPLIANCEFORFOLLOWINGOBSERVATIONAREREQUIRES
15.1 Observation about deficiency in project preparation (Give details observation about
deficiencies in generalanditems
whichhavebeenleftbutarerequiredaspersitecondition)
->NA
15.2 Whether the work has been complete or is in progress as perwork program or delay has
occurred.if delay has occurred,whether the liquidated damages have beenwithhold or recovered
->yes
15.3Whethertheworkhasbeencompletedwithinthesanctioncost,ifnotwhatistheactiontakenbythe
PIU(incaseofcompleteworks).
->yes
15.4Observation about the action taken by PIU on the inspecting officers including SQMs and
NQMs.(Clearly offer comments about the action on the observation f Department officers,State
Quality Monitors)
->NA
15.5CommentaboutdifferenceinobservationmadebyNQMs/SQMsinearlierinspection(theNQMShall
StudyearlierinspectionreportofNOMs/SQMs.ifAnyadnhisClearCommentsaboutthedifferencesin
observation,if any)
->NA
Grading : “S” :
Agency Rating : A
- Overall Grading ofWork
The overall grading calculated on the basis of item and sub item wise grading is given below:
Awarded
Sr.no Item Sub Item
Grading
Quality of Material S
S
(a) Information and tests at plant site
7 Bituminous Course
(b) Information and tests at paver site
S
S
(a) Bituminous Course A
S
(c)Bituminous Course C
Overall Grading S