Perform Technical Site Survey and Report (TSSR), the price includes
1.1 providing full D2B full report as well as general arrangement drawings set
"attached" for 3 candidates for each site
Supply of the As built drawings for the final candidate, including all
construction details as well as power and grounding details, Site Document
1.3 set 1
including consultant drawings, lease agreement, all equipment gurantee
certificates, as well as earth certi
2 Site Acquisition
Site Acquisition only will be valid if lease agreement is submitted, this will be
2.1 Unit
only for sucssiful candidate
3 Pre Fabricated Shelter:
3.1 Prefab Shelter with min dimension 3.00 x 4.00x 2.90 (L x W x H) with the unit
following specifications: -Shelter envelope with a minimum IP 54 protection.
- The floor must be able to support a uniformly distributed load of
1000kg/m2, a concentrated force of
(2) Door handle, lever type, powder coated "stainless stell" (3) Door lock,
Open able from inside without the use of a key, (4) Stainless lock door open,
(5) metal door label with high Voltage sign, site Code and Banglalink logo,
and 1.11.3. Red label w
Carrying and Installation of Prefab Shelter with min dimension 3.00 x 4.00x
3.2 Unit
2.90 (L x W x H)
3.3 the same like 3.1 but with 4.00 x 5.00 x 2.90 Unit
Access steps with the following dimensions: - Max. Height 20 cm., - Min.
3.4 Unit
width 28 cm. - Min length 90 cm
4 Brick Shelter
4.2 the same but 3.00 x 3.60 x 2.90 m Unit
4.3 the same but 4.00 x 5.00 x 2.90 m Unit
4.4 the same but 4.00 x 6.00 x 2.90 m Unit
Extra reinforcement concrete for brick shelter base, the concrete strenght
4.5 will not be less than 300 kg/cm2 after 28 days, the price including M3
reinforcement steel
5 Electrical Work
5.1 Multi core cables of standard copper conductors are insulated with XLPE compound, assembled together and covered with an ove
5.1.1 Paradise cable 1 x 2.5 mm(RED)2(Including Guard shade) M 45
5.9.4 Transportation and Installation of window type AC 1.5 ton (18000 BTU) Unit 1
A/C control unit, including run idicator,Timer with a 7 hours-cycle will be
installed to put in order either A/C1 (3 hours) followed by A/C2 (4hours) and
5.10 Unit 0
vice versa to monitor both A/C units;this timer will ensure only one of the
units will cooling in th
5.10.1 Transportation and Installation of A/C control unit Unit 0
Obtaining Power connection for electric supply authority for sanction load of
5.16 Set 1
10 kW, 3 Phase including all necessary formalities & security deposit.
6 Cable Run
6.0 Out Door cable ladder, Aluminum Type, 400 mm width M 12.60
6.1 IN Door cable ladder, Aluminum Type, 400 mm width M 12.60
6.1.1 the same but 200 mm width M 0
3 inches PVC Schedule 40 conduct for power cable, with high resistance to
6.2 M 0
sun effect, supported with U-clamps every 1 meter,
6.3 Roxtec or similar for cable entry, the price includes frame, sealing
modules and a compression unit
Roxtec G frame, galvanized mild steel, suitable for 6 modules RM40 + 6
6.3.1 Unit 0
modules RM20 for coaxial cables
Roxtec G frame, galvanized mild steel, suitable for 6 modules RM60 + 6
6.3.2 Unit 0
modules RM20 for coaxial cables
6.3.3 Roxtec R100 frame, with 4 modules RM 30 for air conditioning Unit 0
6.3.4 Round seal for single cable entries, Roxtec RS 50 seal, for power cable Unit 0
6.3.5 Round seal for single cable entries, Roxtec RS 43 seal, for earth cable Unit 0
6.4 Cable fed through for feeder entry "in case of No Roxtec" Unit 1
6.5 Gland for Air conditioning pipes and power "in case of No Roxtec" Unit 0
6.6 Cable gland for power cable entry "in case of No Roxtec" Unit 0
6.7 Cable gland for earth cable "in case of No Roxtec" Unit 0
1.5"dia G.I Pole for G.I. cable ladder support, price including all
6.8 Unit 0
accessories, fixation and installation material
GI. electric pole-4" dia 6m bottom and 3" dia for 3m top with RCC base,
6.9 Unit 0
price including all accessories, fixation and installation material
7 Grounding works for Roof Top site
7.2 Earth cable, isolated green/ yellow cable
7.2.1 16 mm(Copper) M 0
16 mm(Alluminium) M 10
7.2.2 35 mm M 0
7.2.3 Earthing cable (green) 50 mm BYA M 0
Earthing cable 50 mm BYA(Alluminium) M 135
7.2.3 Non insulated earthing cable 50mm (Bare copper) M 0
9 Masts and/ or Short Towers: Design Wind Speed: 210km/hr Basic wind speed,
Supply and Installation of MW 3.00 m Mast, Design Wind Speed:
210km/hr Basic wind speed, wind area 2 MW dishes 1.2m diameter as the
9.1 Unit 0
attached detailed drawings, price including mast base, fixation as well as all
installation material
Supply and Installation of 6.00 m Mast, Design Wind Speed: 210km/hr
Basic wind speed, wind area 2 GSM antennae + 1 MW dish 1.2m diameter
9.2 Unit 0
as the attached detailed drawings, price including mast base, fixation as well
as all installation material
Supply and Installation of 9.00 m or 8.00m Mast, Design Wind Speed:
210km/hr Basic wind speed, wind area 3 GSM antennae + 2 MW dish 0.6m
9.3 Unit 0
diameter as the attached detailed drawings, price including mast base,
fixation as well as all installation material
9.12 GSM side arm Hot dip galvanized, 75mm Dia, 3.00 long, wall mounted unit 0
9.13 MW side arm Hot dip galvanized, 114mm Dia, 2.00 long, wall mounted unit 0
10 Extra items
10.1 Alarm cable (Telephone) m 45
10.2 Security light unit 3
10.3 Junction box unit 0
10.4 PVC pipe 1" m 15
10.5 GI pipe 1.5 " pcs 1
10.6 Flexible pipe 1.5 " m 10
Flexible pipe 1" m 10
10.7 PVC Pipe 1.5" m 15
10.18 Copper rod (1 m) Pcs 0
10.19.1 Power socket 16A double pole and ground type for 230V, Unit 2
10.19.2 13A 3Pin Soket + Switch Combined Unit 1
10.19.3 15A 3Pin Soket + Switch Combined Unit 3
10.19.4 Supply and Installation of Gang switch Unit 2
10.19 PVC Duct (4× 6) cm Pcs 14
10.20 PVC Duct (2× 1.5) cm (Including Generator room wiring) Pcs 15
10.21 Non insulated earthing cable 50mm (Alluminium)Indoor Grounding M 25
10.22 Master Ground Bar (400×100×5) mm Pcs 0
Steel Bar (400×100×5) mm Pcs 2
10.23 Ground Bar (300×50×5) mm Pcs 0
10.24 Ground Bar (150×50×5) mm Pcs 0
10.30 Supply and installation of Hatch bolt Pcs 0
10.25 AC Sequrity Grill unit 2
Reinforcement concrete for tower foundation , the concrete strenght will not
10.9 be less than 300 kg/cm2 after 28 days, the price including reinforcement M3
steel
10.10 3/4inch Plaster work for Tower base m2
10.11 CC for shelter base m3
10.12 3/4inch Plaster work for cabin CC base m2
10.13 NCF work for cabin CC base m2
10.14 Supply and installetion of Steel Access Ladder with CC Base m
10.15 Supply and installetion of climbing Ladder m
10.16 Carrying & setting of templet & anchor bolt for 15 m tower unit
10.17 1/2" - 3/4" Plaster work m2
10.20 Welding at Tower Base Column 16mm Dia Bar Pcs
Drilling and epoxy for 20mm Dia Bar at Tower Base Column Pcs
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BDT 0.00
RATE TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
BDT 0
Detail Calculation For 27 m GF Tower
Site ID. GF.RT -27m Tower BL project Site Type: 27m tower, ODU
Site Address: GF.RT CWSP:
1. Tower Foundation
RCC Works (1:1.5:3) with wooden
1.2 formworks for GF Sites
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no.
1 Pile cap 2,300 1,000 700 4
Pile cap tri-angle part 2,300 500 700 2
Pile cap tri-angle part 2,337,563 1 700 2
Total
Total
Cement
Sylhet Sand
Stone
Main bar16mm
CB
Main 3 20 6,650 2
Main 4 20 6,650 2
Main Stirrup 31 10 2,000 2
Main 4 16 8250 1
Main 2 12 6650 1
Main 2 12 6650 1
Main 4 20 6650 1
B2
Main 5 20 6650 1
Stirrup Mid 31 10 1917 1
Stirrup Main 31 10 2,300 1
Main ST 31 16 300 1
Main rod Long 43 12 8750 1
Main rod Short 57 12 6900 1
b
Main bar16mm
CB
Main 4 16 6,650 2
Main Stirrup 27 10 1,600 2
Main 3 16 7950 1
Main 2 12 6650 1
Main 2 16 6650 1
B4
Main 4 16 6650 1
Main ST 27 10 1,600 1
Total
20mm dia bar
16mm dia bar
12mm dia bar
10mm dia bar
3.10 250mm Brick Wall
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no.
1 wall Short 1,980 250 3,160 1
2 BTS wall 14,890 250 3,160 1
3 G.Area wall 7,951 250 3,160 1
4 Deduction grill 3,575 250 1,000 -1
5 Deduction grill 2,976 250 1,000 -1
6 Deduction door 1,200 250 2,200 -2
Total
Cement
Local Sand
Brick
3.11 125mm Brick Wall
Item No Structure Description Length (mm) Height (mm) Structure no.
1 Side wall 8,725 3,160 1
Total
Cement
Local Sand
Brick
3.13 Weather Coating
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no.
1 Column
2 GB
3 Floor beam
4 Floor slab
5 Roof slab
6 Brick wall
7 Brick wall
AS same AS plaster
Paint
2.12 Wall Tiles (Glazed) fitting
Item No Structure Description Length (mm) Height (mm) Structure no.
1 Wall in longer direction 4,050 3,160 2
2 Wall in longer direction 3,795 3,160 2
3 Deduction door 1,200 2,200 -1
Total
Total
2.13 Floor Tiles (Homogeneous) fitting
Item No Structure Description Length (mm) Height (mm) Structure no.
1 BTS Floor area 4,050 3,795 1
Total
Total
2.17 Patent Stone (1:2:4)
Thickness
Item No Structure Description Length (mm) Width (mm) (mm) Structure no.
1 BTS slab 6,075 4,175 75 1
2 BTS slab 4,300 2,155 75 1
3 Deduction 900 900 75 -1
Total
Cement
Local Sand
Brick chips
2.4 Neat cement finishing
Item No Structure Description Length (mm) Height (mm) Structure no.
1 BTS slab 6,075 4,175 1 1
2 BTS slab 4,300 2,155 1 1
3 Deduction 900 900 1 -1
Total
Cement
3. BTS slab (Under Top Floor)+Paraphet wall
3.1 RCC Works with wooden formworks for GF
Item No Structure Description Length (mm) Width (mm) Depth (mm) Structure no.
1 T .Slab 7,025 5,775 140 1
2 CB3 5,425 350 760 2
3 B3 4,175 250 660 2
4 B5 4,975 500 760 1
5 Deduction Ladder part 900 900 140 -1
Total
Total
Cement
Sylhet Sand
Stone
3.3 Plaster `
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no.
1 Wall in Site 31,100 725 1 2
3 Top Slab 8,850 6,700 1 1
4 Top Slab celing 8,850 6,700 1 1
5 Beam 5,125 700 1 2
6 Deduction Ladder part 900 900 1 -1
Total
Total
Cement
Local Sand
3.8 Mild Steel Deformed Bar (G-60)
Item Name Bar type No of Bar(No) Bar dia.(mm) Length (mm) Struc. Qty (No)
Main 4 16 6,650 2
Main Stirrup 27 10 1,600 2
Main 5 20 8350 2
Main 5 20 6650 2
Main 2 16 6650 2
Main 2 16 6650 2
Main 5 20 6650 2
B5
Main 5 20 8350 2
Main Stirrup 35 10 2500 2
Main Mid 35 10 2132 2
seperator 35 10 1,800 2
Total
20mm dia bar
16mm dia bar
12mm dia bar
10mm dia bar
3.10 250mm Brick Wall
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no.
1 under top slab 1,300 250 3,150 1
Total
Cement
Local Sand
Brick
3.11 125mm Brick Wall
Item No Structure Description Length (mm) Height (mm) Structure no.
1 Side wall 23,400 600 1
2 Parapet wall 29,000 600 1
Total
Cement
Local Sand
Brick
3.13 Weather Coating
Item No Structure Description Length (mm) Width (mm) Height (mm) Structure no.
1 Column
2 GB
3 Floor beam
4 Floor slab
5 Roof slab
6 Brick wall
7 Brick wall
AS same AS plaster
Paint
2.4 Neat cement finishing
Item No Structure Description Length (mm) Height (mm) Structure no.
1 BTS slab 8,850 6,700 1 1
3 Deduction 900 900 1 -1
Total
Cement
NOUR BANGLA
Volume (m3)
6.44
1.61
3.27
11.32 m3
399.46 Cft
79.26 bag
179.76 Cft
339.54 Cft
Length (m)
252.00
252.00 m3
Volume (m3)
48.16 Area=196m2
48.16 m3
1,698.99 cft
337.10 bag
764.54 Cft
1,444.14 Cft
Volume (m3)
0.92
1.61
3.27
0.70
6.50 m3
229.41 cft
29.26 bag
103.24 cft
195.00 cft
Area (m2)
0.00
0.00 m2
0.00 Bag
Area (m2)
0.00
0.00 m2
0.00 sft
0.00 bag
0.00 cft
Area (m2)
0.00
0.00
Volume (m3)
6.38
4.68 LET=200
18.56
18.56 m3
654.80 cft
Volume (m3)
12.37 m3
436.53 cft
Volume (m3)
0.00
WT in Kg
4,098.84
963.80
275.09
122.52
217.81
176.77
229.80
53.27
26.52
63.92
35.35
6,263.68 kg
0.00 kg
4,902.27 kg
122.52 kg
1,238.89 kg
Volume (m3)
3.71
0.89
2.45
2.32
1.77
8.89
-0.29
24.38
44.12 m3
1,556.47 Cft
308.82 bag
700.41 Cft
1,323.00 Cft
Volume (m3)
0.00
0.00
0.00
0.00
0.00 cft
0.00 bag
0.00 cft
0.00 cft
Area (m2)
50.22
119.74 Information Mr.johir
169.96 m2
1,828.72 sft
18.29 bag
146.30 cft
Area (m2)
50.22
50.22 m2
4.02 Bag
Volume (m3)
2.32
2.32 m3
81.88 cft
Volume (m3)
1.55
1.55 m2
54.59 cft
WT in Kg
363.13
137.89
3,080.52 Extra=200*2
228.63
563.75
707.82
125.00
111.11
156.17
0.10
23.62
23.62
98.40
131.20
76.45
52.08
11.81
11.81
65.60
82.00
36.63
43.96
14.68
334.03
351.21
267.23
86.53
196.22
7,381.18 Kg
3,457.71 Kg
666.11 Kg
1,306.06 Kg
1,951.29 Kg
Area (m2)
65.46 Information Mr.johir
65.46 m2
17.67 Bag
98.18 cft
3,403.66 nos
Volume (m3)
1.97
0.74
2.71 m3
17.39 Bag
40.13 cft
81.21 cft
205.31
215.70
190.88
187.34
125.00
111.11
156.17
75.28
23.62
83.97
52.28
37.64
11.81
20.99
41.98
26.14
1,565.22 kg
0.00 kg
495.98 kg
35.42 kg
1,033.82 kg
Area (m2)
25.36
9.27
-0.81
33.82 m2
2.71 Bag
231.97
264.94
129.90
98.09
207.15
173.61
55.56
55.56
173.61
207.15
136.87
38.93
75.28
23.62
83.97
52.28
205.92
164.00
41.98
41.98
164.00
205.92
107.89
92.01
77.68
3,109.86 kg
1,501.36 kg
393.26 kg
288.55 kg
926.69 kg
Volume (m3)
1.02
1.02
1.54 Bag
10.83 cft
419.74 nos
Area (m2)
14.04 Information Mr.johir
17.40
31.44 m2
8.49 Bag
47.16 cft
1,634.88 nos
Area (m2)
59.30
-0.81
58.49 m2
4.68 Bag
SITE Type : BL 40M (GF Site)
Item No Description Unit Qty Price Total Amount
MTERIAL COST (civil)
1 Cement Bags 1098 390 428,213
2 Re-bar -
A Φ20 mm kg 4959 59.7 296,056
B Φ16 mm kg 6458 59.7 385,520
C Φ12 mm kg 1753 59.7 104,628
D Φ10 mm kg 5151 59.7 307,496
3 Bricks chips cft 157 75.00 11,796
4 Stone chips cft 4026 127.00 511,253
6 Sylhet sand cft 1934 31.00 59,955
7 Local sand cft 1006 16.50 16,604
8 Filling sand cft 14.00 -
9 Ist clas bricks nos 13719 7.00 96,032
10 Non shriang begs 3 1300.00 3,900
13 Paint lt 24.09 220.00 5,300
Wall Tails 46.94
Floor Tiles 15.37
Total 2,226,753
Excution cost
1 Pile subcontractor site 1 180000 180,000.00
2 Civil subcontractor site 1 180000 180,000.00
TOTAL 360,000
Other Cost
1 Conveyance site 1 6000.00 6,000
Hardwire Materials Site 1 10000 10,000.00
2 Template carrying site 1 3000.00 3,000
TOTAL 19,000
Ground Total 2,605,753
Approved By
Project Manager
Date Amount
Ckeck by procumente
Proposed
proved By
Project Manager