Professional Documents
Culture Documents
Consultant : CESD
Client :Banglalink
Soil Excavation : According to Design Drawings or the consultant Recommendation, the Sub Contractors must Consult with the
Local Utility (Electric ,Gas,Telephone & Water) Companise to Determine The Location of any Underground Facilities Prior to
1 Digging.
Mat Foundation m3 0 7,900 5,400 2,000 0.00
0.00
Mat Foundation m3 0 1000 1800 2000 0.00
Backfill using Soil With Well Compaction (from Site Soil)
Total Excavation m3 0 7,900 5,400 2,000 0.00
Total Excavation m3 0 1,000 1,800 2,000 0.00
2 Mat Foundation m3 0 7,300 4800 700 0.00
0.00
Mat Foundation m3 0 1,000 1500 700 0.00
GB m3 0 10,100 250 500 0.00
Column m3 0 300 300 1300 0.00
Plan Concrete For outdoor BTS foundation (Mass Cement 1:3:6) 3/4" Down Graded Brick Chips, Local sand (FM-1.5) branded
Cement With a Specified branded Cement Content not Less than 250kg/m3 & Stress Not Less Than 180 kg/cm2 After 28 Days.
3
Mat Foundation m3 0 7,300 4800 250 0.00
0.00
Mat Foundation m3 0 1,000 1500 250 0.00
Reinforced Concrete for outdoor BTS mat foundation With a soleplate resisting cement content not less than 350kg/m3 the
price including protection against soil and water attack by water proof coating of two Layers of approved Materials
Column C (Up to +9.0) m3 6 2,500 300 300 1.35
Column C (Up to +12.0) m3 6 2,500 300 300 1.35
Slab Beam B1 m3 1 5,960 300 350 0.63
Slab Beam B1* m3 1 5,960 300 350 0.63
4 Slab Beam B2 m3 3 2,850 300 350 0.90
Slab Beam B2 m3 1 2,850 300 360 0.31
12.94
Slab Beam B3 m3 1 3,250 300 360 0.35
Slab Beam B3* m3 1 3,250 300 360 0.35
Slab Beam B4 1 5,960 300 360 0.64
Slab Beam B4* 1 5,960 300 360 0.64
Slab (Level=+12) 1 5,960 3,450 150 3.08
Slab (Level=+15) 1 4,560 4,250 140 2.71