Contractor : Nour Bangla

Consultant : CESD
Client :Banglalink

Site ID: KHU_X0990

BOQ Summry For Consultant Check


Item Description Quantity Unit
1 Soil Excavation 0.00 m3
2 Backfill using Soil With Well Compaction. 0.00 m3
3 Plain Concrete 0.00 m3
4 Reinforced concrete 12.94 m3
5 Steel-60 G 2866.81 kg

KHU_X0990 Nour Bangla


Contractor : Nour Bangla
Consultant : CESD
Client :Banglalink

BOQ For Consultant Check


Site ID & Name : KHU_X0990 Jhenaidaha sadar, Jhenaidaha.
Dimensions
Total
Item Description unit L(m) B(m) H(m) Quantity Total Quantity
No Length Width Heigth

Soil Excavation : According to Design Drawings or the consultant Recommendation, the Sub Contractors must Consult with the
Local Utility (Electric ,Gas,Telephone & Water) Companise to Determine The Location of any Underground Facilities Prior to
1 Digging.
Mat Foundation m3 0 7,900 5,400 2,000 0.00
0.00
Mat Foundation m3 0 1000 1800 2000 0.00
Backfill using Soil With Well Compaction (from Site Soil)
Total Excavation m3 0 7,900 5,400 2,000 0.00
Total Excavation m3 0 1,000 1,800 2,000 0.00
2 Mat Foundation m3 0 7,300 4800 700 0.00
0.00
Mat Foundation m3 0 1,000 1500 700 0.00
GB m3 0 10,100 250 500 0.00
Column m3 0 300 300 1300 0.00
Plan Concrete For outdoor BTS foundation (Mass Cement 1:3:6) 3/4" Down Graded Brick Chips, Local sand (FM-1.5) branded
Cement With a Specified branded Cement Content not Less than 250kg/m3 & Stress Not Less Than 180 kg/cm2 After 28 Days.
3
Mat Foundation m3 0 7,300 4800 250 0.00
0.00
Mat Foundation m3 0 1,000 1500 250 0.00

Reinforced Concrete for outdoor BTS mat foundation With a soleplate resisting cement content not less than 350kg/m3 the
price including protection against soil and water attack by water proof coating of two Layers of approved Materials
Column C (Up to +9.0) m3 6 2,500 300 300 1.35
Column C (Up to +12.0) m3 6 2,500 300 300 1.35
Slab Beam B1 m3 1 5,960 300 350 0.63
Slab Beam B1* m3 1 5,960 300 350 0.63
4 Slab Beam B2 m3 3 2,850 300 350 0.90
Slab Beam B2 m3 1 2,850 300 360 0.31
12.94
Slab Beam B3 m3 1 3,250 300 360 0.35
Slab Beam B3* m3 1 3,250 300 360 0.35
Slab Beam B4 1 5,960 300 360 0.64
Slab Beam B4* 1 5,960 300 360 0.64
Slab (Level=+12) 1 5,960 3,450 150 3.08
Slab (Level=+15) 1 4,560 4,250 140 2.71

KHU_X0990 Nour Bangla 1


Contractor : Nour Bangla
Consultant : CiviTech
Client :Banglalink

BOQ For Consultant Check


Site ID & Name : KHU_X0990 Jhenaidaha sadar, Jhenaidaha.
High Grade Steel Measurement
Dia & Weight (Kg/m)
Item Description Dia Nos Length (m) Nos. Total Total (Kg)
(Bar) (Items) Bar (Bar) Length 8mm 10mm 12mm 16mm 20mm
0.4 0.62 0.89 1.58 2.47
B1 & B1* (Beam)
Main bar Top 4 T20 20 2 6.81 4 54.48 2.47 134.57
Main bar Bottom 5 T20 20 2 5.91 5 59.10 2.47 145.98
Main stirrups 6@10/m 10 2 1.55 30 94.12 0.62 58.35
Separator 20 2 0.25 16 8.00 2.47 19.76
B2 (Beam)
Main bar Top 3T16 16 4 4.30 3 51.60 1.58 81.53
Main bar Bottom 4T20 20 4 3.40 4 54.40 2.47 134.37
Main stirrups 6@10/m 10 4 1.55 17 106.02 0.62 65.73
1
B3 & B3* (Beam)
Main bar top 4T20 20 4 4.55 4 72.80 2.47 179.82
Main bar bottom 4T20 20 4 3.80 4 60.80 2.47 150.18
Main stirrups 6@10/m 10 4 1.55 20 120.90 0.62 74.96
B4 & B4* (Beam)
Main bar top 5T20 20 2 6.51 5 65.10 2.47 160.80
Main bar bottom 5T20 20 2 5.61 5 56.10 2.47 138.57
Main stirrups 6@10/m 10 2 1.55 30 94.12 0.62 58.35
Separator 20 2 0.25 16 8.00 2.47 19.76
BTS Column
2 Main Bar 8T16 © 16 6 6.15 8 295.20 1.58 466.42
Stirrups 7@10/m 10 6 1.06 42 267.12 0.62 165.61
Floor Slab (+12m)
Main bar short direction (Top & bottom) 10 2 5.93 24 282.27 0.62 175.01
Main bar long direction (Top & bottom) 10 2 3.42 41 283.72 0.62 175.91
4
Floor Slab (+15m)
Main bar short direction (Top & bottom) 10 2 4.53 33 295.36 0.62 183.12
Main bar long direction (Top & bottom) 10 2 4.22 37 313.77 0.62 194.53
2783.31
Westage 3% 83.499
Total Re-bar 2866.81