TO BE HIDDEN DWG No : PTK-86-C-010 ÷ 015 ISSUED FOR CONTRACTORRUCTION BOM Title : CIVIL MATERIALS ACCOMODATION TYPE B ESTIMATE PRICE U-Price T-Price No. Rev Tag No. Q=1X2 U Material/Equipment Description (IDR) (IDR)
A 2 SITE PREPARATION WORK 0
01 1 2 UNIT EXCAVATOR FOR CUT & FILL - 02 324 647 M2 EARTH, COMPACTED SOILS/ROCKS: FOR FILLING/BACKFILLING - B FOOTING , COLUMN AND FLOOR SLAB CONRETE 0 01 3 6 M3 LEAN CONCRETE UNDER FOOTING THK 50 MM ( fc 14.53 mpa ) 0 02 1292 2583 KG REIFORCEMENT CONCRETE BAR D10 LONG 12000 MM 0 03 180 360 KG REIFORCEMENT CONCRETE BAR DIA Ø 8 MM LONG 12000 MM 0 04 6 12 M3 REINFORCED CONCRETE FOOTING & COLUMN ( fc 24,9 mpa ) 0 05 1 1 M3 LEAN CONCRETE CONCRETE UNDER STAIR THK 120 ( fc 14.53 mpa ) 0 06 2 3 M3 LEAN CONCRETE AREA TOILET UNDER CERAMIC FLOOR THK 50 MM ( fc 14.53 mpa ) 0 C FLOOR, TILING WORK AND BOARD SKIRTING 0 01 327 654 M2 SUPPLY & INSTALL KALSIFLOOR 1200 X 2400 THK 20 MM 0 02 235 470 M1 SUPPLY & INSTALL SKIRTING WOOD PLANK H=100 THK 10 MM FINISH PAINT COLOR BROWN 0 03 65 130 M1 SUPPLY & INSTALL SKIRTING KALSIBOARD PLANK H=250 THK 6 MM FINISH PAINT COLOR 0 04 151 302 M2 SUPPLY & INSTALL VINYL FLOOR ROLL THK 1.5MM MOTIF KAYU 0 05 32 64 M2 SUPPLY & INSTALL FLOOR TOILET TILE CERAMIC 200 X 200 NON-SLIP COLOR WHITE 0 06 118 237 M2 SUPPLY & INSTALL WALL TOILET TILES CERAMIC 200 X 250 COLOR WHITE 0 D WALL PARTITION AND CEILING WORK 983.583.920 01 408 816 M2 SUPPLY INSTALL WALL INTERIOR PLYWOOD THK 6 MM INCLUD. ALL HARWARE, FIXINGS & TRIMS 410.000 334.510.800 02 223 447 M2 SUPPLY INSTALL WALL INTERIOR KALSIBOARD THK 6 MM INCLUD. ALL HARWARE, FIXINGS & TRIMS 410.000 183.210.960 03 162 324 M2 SUPPLY INSTALL WALL EXTERIOR KALSIBOARD THK 6 MM INCLUD. ALL HARWARE, FIXINGS & TRIMS 410.000 132.994.160 03 31 62 M2 SUPPLY & INSTALL CEILING TOILET KALSIBOARD 3,5MM INCLUDE HOLLOW FRAMING, FIXING AND TRIMS 580.000 36.192.000 05 362 724 M2 SUPPLY & INSTALL CEILING CORIDOR & ROOM PLYWOOD 6MM INCLUDE HOLLOW FRAMING, FIXING AND TRIMS 410.000 296.676.000 E PAINTING 171.676.848 01 362 724 M2 INTERIOR & EXTERIOR CEILING PAINT – COLOR WHITE 75.000 54.270.000 02 408 816 M2 WALL PAINTING INTERIOR BEDROOM COLOR DANACRYLD " BARLEY WHITE " 95.000 77.508.600 03 162 324 M2 WALL PAINTING EXTERIOR COLOR GREEN 123.000 39.898.248 F WINDOW & DOOR FRAME 279.600.000 DOOR SETS ; SINGLE LEAF DOOR WOOD SOLID PANEL (WITH ALUMINUM FRAME 4 INCH COLOUR DARK BROWN, 01 12 24 EA 3.300.000 79.200.000 HINGES, LOCK SET, HANDLE SET, ETC) - TYPE D2 DOOR SETS ; SINGLE LEAF DOOR PVC PANEL (WITH ALUMINUM FRAME 4 INCH COLOUR DARK BROWN, HINGES, LOCK 02 12 24 EA 3.300.000 79.200.000 SET, HANDLE SET, ETC) - TYPE-D2 SINGLE WINDOW FIX GLASES (WITH ALUMINUM FRAME 4 INCH COLOUR DARK BROWN, GLASSES THK 5 MM, 03 12 24 EA 4.500.000 108.000.000 HINGES, ETC) - TYPE W2 SINGLE WINDOW FIX GLASES (WITH ALUMINUM FRAME 4 INCH COLOUR DARK BROWN, GLASSES THK 5 MM) - TYPE 04 6 12 EA 1.100.000 13.200.000 W3 G ACCECORIES 191.200.000 01 6 12 EA STEEL STAIR W.1500 MM 4.500.000 54.000.000 02 70 140 M1 HAND RAIL STEEL PIPE 1,5" THK 1.5 MM 980.000 137.200.000 H ROOF 359.591.800 SUPPLY & INSTALL ROOF LYSAGHT STD PROFILE COLORBOND TRIMDEK CORRUGATED GALVANIZED, OLIVE GREEN 01 448 895 M2 387.000 346.519.800 INCLUDE . ALL HARWARE, FIXINGS & TRIMS 02 86 172 M1 VASCIA KALSIPLANK 200 X 3000 THK 8 MM FINISH OIL PIANT DARK BROWN 76.000 13.072.000 I KNOCKDOWN BOLTER STEEL STRUCTURE 857.600.000 ALL STEEL STRUCTURE: FLOOR, JOIST, COLUMNS, FRAMES, HANDRAILS, STAIRS, MUST BE PROVIDED BY PRE- 1 1 2 LS 428.800.000 857.600.000 ENGINEERED KNOCK-DOWN TYPE (i.e. ROBERTSONFASTBUILD) ============= END SECTION =============== GENERAL NOTES : 2.843.252.568 MATERIAL PRICE BASED ON MARKET PRICE. THE LIST OF MATERIALS ABOVE MAY OF SLIGHTLY DIFFERENCE (IN ITEMS OR QUANTITY) TO DRAWINGS. HENCE, THE COMPLETE INFORMATION 1, SHALL GOVERNS. ALL TEMPORARY/SUPPORTING MATERIALS / CONSUMABLES/TEARS-WEARS (I.E. FORMWORK, NAILS, TAPES, WELDING & CUTTING, GAS, BLAST & PAINTS, INSTALLATION PANELS/CABLES, ETC.) 2, TO BE PROVIDED BY CONTRACTOR AS PART OF SUPPLY.