ø25 - SPR ø25 - SPR

ø32 - SPR ø32 - SPR


ø32 - SPR
ø32 - SPR
ø40 - SPR ø40 - SPR
ø40 - SPR ø40 - SPR
ø50 - SPR ø50 - SPR

301

500
+18500
ø100 - SPR ø50 - SPR
Roof

+15500
Third Ceiling

6000 6000 6000 6000 6000 6000 6000 6000

01.02 01.03 01.04 01.05 01.06 01.07 01.08 01.09 01.10

FF Section A
1 : 75

Standard remarks:
- All dimensions are in millimeters (mm) and indicated levels in meters (m).
- All drawings to be read in conjunction with the Structural,- Civil,- and Mechanical & Electrical drawings.
- Drawings are not to be scaled; written dimensions should be followed and verified with details.
- Indicated Finished Floor Level of the buildings is 0.00 = 96.1 or 97.1 or 106.1 MSL
- Building locations (corners) are fixed with the relevant UMT coordinates and related to the coordinated
of the Boundary Bench mark A1.
- Pre Engineered Building Systems: Steel Super Structure of the Packaging Building and Full Product Store (BR),
Utility Building (E), Malt Intake Building (M),
Chemical Storage Building (S), Power Station (T) and Brew House & Service Block (Z) will be designed, fabricated
and delivered by the Pre Engineered Building Supplier.
- Pipe Bridge: The Pipe Bridges (P) as indicated on the drawings will be designed, fabricated and delivered
by the Pre Engineered Building Supplier.
- Builders steel: Support Steel frames for industrial doors (overhead doors) will be designed, fabricated and delivered
by the Pre Engineered Building Supplier.
- Industrial doors: Overhead doors, man doors and louvre doors will be designed, fabricated and delivered
by the Pre Engineered Building Supplier.
- All equipment and equipment related building services are indicative. Exact dimensions and positions still to be determined.
- Roof, wall and floor openings are not yet indicated. Openings are listed in file “openings PEB”.
Exact dimensions, amounts and positions still to be determined.
- Safety facilities for working on roofs are yet not indicated. To be taken into account.

0
.5
88
87 .50

88
86 .50
85 .50

.00
.50

88

0
.5
U

87
87.
00

. 50
87
B T GEDUNG EXISTING
86.00

86 .50
Existing Building
Center Line

e
S

nc
fe
om r
fr ete
87.50

87.50

ck m

87 .50
in line
87.00
87.50
86.50

87.50
87.00
86.50
86.00
.50
87

ba 5
87.00
86.50
86.50 87 .50
87.00

t
se
X = 705616.838
Y = 9270621.605
Z = 87.514 Wate r p lant

Wate r t ank
15 0 m 3

.00
85 50
85. 00 Gen
86. .50
86 .00
87 .50
87 Wate r t ank
Gen 15 0 m 3
87.50

86.50
85.50 LV MDB
85.00
86.00 87.00

TR TR MV

N A' A B C D E F G H I J

7
m
5
k1
ac
S etb
er
Riv

s
ea
Cik
S.
© 2013 HaskoningDHV Nederland B.V. All intellectual property rights among which the copyright related to this drawing shall vest in
HaskoningDHV Nederland B.V.. The drawing is the property of HaskoningDHV Nederland B.V. and may not without the prior written
consent of Haskoning DHV Nederland B.V. be duplicated or published in any way in whole or in part, or be used for any purpose

Isometric Fire Sprinkler Roof Floor CD0 21.08.2017 RHD SMT ISSUED FOR CONSTRUCTION
Nr. Date Issued by Issued to Description

Drawn By : Designed By : Checked By : Approved By :


YgM IZH BM MA
Client :

PT Sinarmas Agro Resources And Technology, TBK


Sinarmas Land Plaza Tower 2, Jl. M.H. Thamrin PT. SMART Tbk
No.Kav 51, RT.9/RW.4, Gondangdia, Menteng, Kota (PT SINARMAS AGRO RESOURCES & TECHNOLOGY Tbk.)
Jakarta Pusat, DKI Jakarta 10350
Project Name : Subject :

TISSUE CULTURE PHASE II SECTION AND ISOMETRIC FIRE SPRINKLER


SMART Biotechnology Center, Sentul Bogor. ON ROOF FLOOR
other than for which it is supplied.

PT. HASKONING INDONESIA, P.Size : Phase : For Construction


a company of :
Ventura Building 2nd & 3rd Floor
R.A. Kartini #26 (Outer Ring Road) Scale : Status : Final
Cilandak 12430
Jakarta - Indonesia Proj.Nr. : TA1811 Suitability :
T: +62 21 750 46 05

I&B
E: info@rhdhv.com
www.royalhaskoningdhv.com
Drw.Nr. : B1-04-DR-M-6015-CD0
2/6/2018 4:22:45 PM
C:\TEMP\TA1811_Lab_MEP_204298.rvt