Nama Syarikat
Alamat
Alamat
logo CEILING/SKIM COAT CHECKLIST
Project: Ref:
Inspection Date / Time:………………………………….. / ……………………………………
Location / Description: (Plan attached) : ………………………………………………………………
………………………………………………………………………………………………………………
………………………………………………………………………………………………………………
………………………………………………………………………………………………………………
No Items KESB COW REMARK
Suspended Ceiling
1 Before installation of ceiling
a All M&E services within ceiling space to be
completed and inspected by COW. Relevant M&E
checklist duly signed and verified.
b All redundant formwork adhering to slab/beam
removed
c Adequate ceiling framing & hangers - rigid & level
d Check framing height measured from FFL
2 After installation of ceiling
a Check ceiling height from FFL
b Ceiling to be level and even
c Provide fan hooks where indicated
d No stain marks / damaged ceiling
e Access opening to be provided, if any
3 Skim Coat / Plaster to slab soffit
a All redundant formwork removed
b No surface cracks
c Surfaces even and flat
d Fan hooks
e Identify all light points are provided
CONCLUSION:
Submitted By: Inspected By: Verified / Noted By:
Site Supervisor Clerk of Works R.E / R.A
(Signature / Date) (Signature / Date) (Signature / Date)
Status:
Acceptable Rejected Not applicable