This document is a checklist for installing aluminum doors and windows with sections reviewing the material, frame installation, leaf installation, protection, and coordination with other tasks. It includes over 30 individual items to check to ensure proper installation and coordination with related work. The checklist will be used and signed off by the site supervisor and oversight inspector to confirm the aluminum doors and windows were installed correctly.
This document is a checklist for installing aluminum doors and windows with sections reviewing the material, frame installation, leaf installation, protection, and coordination with other tasks. It includes over 30 individual items to check to ensure proper installation and coordination with related work. The checklist will be used and signed off by the site supervisor and oversight inspector to confirm the aluminum doors and windows were installed correctly.
This document is a checklist for installing aluminum doors and windows with sections reviewing the material, frame installation, leaf installation, protection, and coordination with other tasks. It includes over 30 individual items to check to ensure proper installation and coordination with related work. The checklist will be used and signed off by the site supervisor and oversight inspector to confirm the aluminum doors and windows were installed correctly.
A MATERIAL 1 Material sample, certificate, grade and shop drawings submitted Y N NA to and approved by OIC 2 Material and grade as per approved sample Y N NA 3 Door or window frame and leaf free from visible defects, such as Y N NA chips or scratches 4 Frame cutting/joints gap within tolerance and weather tight Y N NA 5 Components stored clear of the ground and adequately Y N NA supported to prevent distortion 6 Protection provided to prevent exposure to rain and water Y N NA B FRAME INSTALLATION 1 Correct door and window position Y N NA 2 Vertical control provided with setting out and marking Y N NA 3 Horizontal control provided with setting out and marking Y N NA 4 Support provided to hold frame rigid to position Y N NA 5 Fishtail or tie adaptors are properly installed Y N NA C LEAF INSTALLATION 1 Door swing as per approved shop drawings Y N NA 2 Correct hinges installed as per swing direction Y N NA 3 Glazing and rubber sealer properly installed Y N NA Material: _________________________________ 4 All accessories installed to position with correct materials Y N NA D PROTECTION 1 Proper and adequate protection provided Y N NA E COORDINATION WITH OTHERS 1 Brickworks/Blockworks: Fishtails / tie adaptors installed Y N NA accordingly 2 Plastering: Frame protected from split by mortar Y N NA 3 Painting: Frame protected from split by paint Y N NA