CHECKLIST BEFORE TAKING THE POSSESSION

Sr. Units
Description of items checked
No. Hall Kit
A Floor tiling
1 Colour/shade variation,crack observed in floor tiles. Y N NA
2 Gap sealing of floor tiles filled properly Y N NA
3 Slope of floor tiles given in the open terrace/ balcony towards Y N NA
outlet
4 Floor tiles are thoroughly cleaned. Y N NA
B Toilet Floor/ wall tiling
1 Tiles Fixed are not sounding hollow or debonding Y N NA
2 Water accumulated in WC/ bath/ toilet check by pouring Y N NA
water
3 Windows/ ventilators in toilets properly finished with wall Y N NA
tiles
C Kitchen platform & wall tiling
1 Cracks observed in the kitchen wall tiles. N Y NA
2 Proper slope given to the kitchen platform check by pouring Y N NA
water as per requirement
3 Rounding of corners of vertical granite. Y N NA
4 Kitchen steel sink gaps from beneath filed with mortar. Y N NA
5 Noise form the kitchen steel sink when water is forced Y N NA
through the top
D Loft
1 Slope of the loft slightly away from main wall. Y N NA
2 Cleaning of loft on the top done. Y N NA
3 Deflection of loft slab observed. Y N NA
E Door
1 All door painted properly from all the sides including top & Y N NA
bottom.
2 Screws to All fittings and hinges screwed properly Y N NA
3 All door/window shutters are defect less like bend, damaged Y N NA
etc.
4 Rounding of corners of vertical granite. Y N NA
5 Cover moulding patti to all door frames fixed with proper Y N NA
corner finishing.
6 All door / window fittings operating and functioning smoothly Y N NA
to requirements
F Aluminium Windows
1 Shutters obstruct while sliding,locking operation and cleaning Y N NA
2 Frame / shutters bend and damaged, Powder coating damage. Y N NA
3 Gaps in the window frame and plaster sealed from internally Y N NA
& externally
4 Check by pouring water in the window tracks for proper Y N NA
draining of water.
G CP Fitting
1 Functioning of taps, mixers, bib cocks satisfactory. Y N NA
2 Damage or scratches to CP fittings observed Y N NA
3 Alignments & Levels of CP fittings properly maintained Y N NA
4 Water Shower pressure checked & found satisfactory. Y N NA
5 Leakage observed from taps, mixer, bibcocks etc. Y N NA
H Sanitary ware
1 Functioning of flush tank and EWC satisfactory Y N NA
2 Leakage through the flush tank when filled. Y N NA
3 WHB fixed on the brackets properly (Check Rigidity) Y N NA
4 Brackets painted with oil paint. Y N NA
5 All ceramic sanitary fittings free from cracks Y N NA
6 Sealing of joints between WHB and wall done. Y N NA
7 Separate stop cock provided for whole flat. Y N NA
I Electrification
1 All switches working properly. Y N NA
2 All fan hooks in fan boxes present. Y N NA
3 ELCB/MCB fitted & working properly Y N NA
4 All screws fixed to switch boards. Y N NA
5 Simultaneously all lighting and points are working in full load Y N NA
6 Crimping lugs are used on the DB end for termination of all Y N NA
the wires
7 All the circuits are ferruled at both ends Y N NA
Colour coding used for single phase & three phase circuits as per the Y N NA
8 standard norms i.e. Red, Yellow, Blue for phases,
Black for Neutral & Green for Earth
9 Dedicated neutrals Bus bar links per phase & Earth bus bar Y N NA
provided in the DB.
10 Circuit diagram provided inside DB cover Y N NA
11 Separate junction box provided next to the main DB for the Y N NA
inverter outgoing circuit.
J Painting walls / ceiling
1 Undulations in the wall/ceiling surface observed. Y N NA
2 Dampness or leakages observed on wall/ceiling. Y N NA
3 Corners and edges are sharp and finished satisfactorily Y N NA
4 Cracks in walls / ceiling observed. Y N NA
5 Surface finish of painted walls and ceiling uniform. Y N NA
6 Door and window fixtures cleaned after painting. Y N NA