FIELD INSPECTION REPORT (Checklist)
Inspection Report (HVAC)
REPORT No. : Rev. 0
LINE or ITEM No. : Form No.
AREA / LOCATION :
Ref. No. /DWG. No.
INSPECTION DESCRIPTION:
HVAX PMC CLIENTS
No. Description Remarks
ACCEPT REJECT ACCEPT REJECT ACCEPT REJECT
A. Preparation
1 Delivery and Staging areas are well prepared.
Duct materials & accessories are properly checked
2
& properly tagged with markings.
Duct hanger & supports are sufficient and
3
available. No severe defects.
Dampers (smoke & Fire dampers, Manual,
4 Motorized) are all functioning and no defects
B. Duct Installation
1 Ducting Materials has no damaged
Duct sizes & location are as per approved IFC
2
Drawing
Duct layout and accessories installed were as per
3
approved IFC Drawings.
Duct connection were properly sealed with gasket
4
and sealant.
Duct hanger & supports are sufficient & with
5
proper spacing as per approved IFC Drawing
Clean duct surface prior duct insulation installed
6
(25mm Interior; 50mm Exterior)
Duct fastening screw spacing of 400 mm properly
7
installed
Duct insulation plastic band spacing of 600 mm
8
properly installed
Cut edges of Angle supports and Hangers are
9
touch up with galvanized paint.
Remarks:
SIGNED : ______________________ NAME : __________________________________ DATE : ____________________