This document is an architectural area completion report for a job with 12 items to check. It summarizes the status of wall and ceiling linings, prefabricated firewalls, flooring, furniture placement, outfitting/equipment, windows, doors, technical fittings, information signs, suspended floors, and water bunds. The report will be signed off by the client once all items are completed to specification and without damage.
This document is an architectural area completion report for a job with 12 items to check. It summarizes the status of wall and ceiling linings, prefabricated firewalls, flooring, furniture placement, outfitting/equipment, windows, doors, technical fittings, information signs, suspended floors, and water bunds. The report will be signed off by the client once all items are completed to specification and without damage.
This document is an architectural area completion report for a job with 12 items to check. It summarizes the status of wall and ceiling linings, prefabricated firewalls, flooring, furniture placement, outfitting/equipment, windows, doors, technical fittings, information signs, suspended floors, and water bunds. The report will be signed off by the client once all items are completed to specification and without damage.
Item Description Status Accept. No. Yes No N/A 1 Wall and ceiling linings. Insulation and vapour barrier placed and undamaged, lining colour correct, ceiling and wall panels correctly trimmed and free from damage 2 Prefabrication firewalls/louvres installed to specification with sealed joints, plumb and lined, without damage 3 Floor coating. Floor screed placed according to specification, carpet or tiles of correct colour, embedding of carpet or tiles is firm without any gaps or damage 4 Floor laid to drain evenly to outlets, with no puddling or flat spots 5 Furniture. All furniture of correct colour & placed in accordance with drawings, all drawers/locker doors open/shut, all locks function. All spare keys taped securely adjacent to respective locks 6 Outfitting/Equipment. Bunk and window curtains correct length, width and colour. All wall pictures/mirrors installed, waste bucket and ashtrays in place, correct number of coat hangers provided 7 Windows. Windows fixed as per Vendor detail, complete with window blind 8 Doors. Entrance and toilet doors close without slamming and seal correctly, door catcher and/or stopper functions, door lock operates freely 9 Technical fittings. Shower curtains of correct length and width, hot/cold water taps function, shower rose with flexible hose/tube installed and adjustable 10 Information signs installed
11 Suspended floors correct and un-damaged
12 Water bunds turned up around walls in wet areas