Rev. : 00 Date :
Checks for Control Room Design
All externals entry doors must be filled with adequate door seals to prevent
4 ingress of duct and air
borne particles.
No penetrations are allowed from the roofing. The provision of China mosaic
flooring over the roof with water proofing can be adopted to reduce the
6 building temperature. The system remain intact and waterproof under the
local climatic conditions.
Guttering, downpipes and fitting must be installed around the roof slab and
7 extended to the storm water drain.
All external doors and windows must be protected from weather by either
8 rain guards at the top.
9 The doors to the entrance shall be secured with unauthorized access control
Providing 200mm thick first class burnt brick Masonry wall in Flemish-bond
formation with cement mortar 1:4 (1 cement:4 course sand) or suitable
chemicals (in case of AAC blocks) in proper line, level & plum including
18 racking out the joints on exposed surfaces to receive plaster & curing etc.
complete. The brick work shall be provided with runners at regular intervals
in 1 m vertical height with 2 nos. of 8mm dia. T.M.T. bars at Junctions,
Finished roof level. Inside plaster shall be 12mm thk. (in two coats) in cement
19 mortar 1:3.
Providing & applying sand face plaster 20 mm thick in two coats using
approved screened and graded river sand in all positions including base coat
of 12 mm thick in c.m. 1:4, curing the same not less than one day & keeping
20 the surface of base coat rough to receive the sand faced treatment & top
coat of 8 mm thick in c.m. 1:3 using waterproofing compount @ 2kg per
cement bag finishing the surface by taking out grains & curing for minimum
10 days
Exterior Paint shall be Two coat of waterproof acrylic emulsion apex ultima
21 paint
22 Interior Paint shall be Two coat of acrylic/luxury emulsion paint
Battery room paint shall be provided ceiling and wall for full hieght painted
23 with acid resistant paint
All sanitary, toilet, plumbing, door, windowsand their fixture & office
24 furniture shall be reputed brand & IS codel provision
Deviations, if any
1
2
3
4
Verification team
Reviewed & Verfied by Approved & Accepted by
Remarks
Name
Date
Sign.
CEA Technical
Remarks, if any
Approved & Accepted by
Accepted by
Pravinkumar Patil