External Plaster checking
Filling of all cracks, junctions of masonry and concrete members, holes etc satisfactory
All plumbing and drainage lines on external faces and parapets including RWPs complete with testing
All external grills, window frames, railings on balconies and staircases complete
Drain spouts fixed in external box type windows and toilet sunks as per Architects approval
Sufficient hacking of all concrete surfaces done OR bonding agent applied just prior to plastering
Chicken mesh fixing done satisfactorily at all masonry and RCC member joints
Masonry surface well cleaned and thoroughly watered on previous day and brought to SSD condition
Sufficient level pads made on walls --(Plaster thk max 20mm) in perfect line, level, plumb and right angle at
corners
Any other observation
Chicken mesh/Fibre mesh fixing done satisfactorily at all masonry and RCC member joints and on cured chases
Masonry surface well cleaned and allowed to dry
Level strips made on walls in perfect line, level, plumb and right angle at corners
Back coat applied on walls in line, level and plumb without joints, surface kept scratched and well cured
Leakage of slab treated
Any other observation