Ensure that the interior walls are installed before finishing the exterior walls
Verify the electrical and mechanical openings in the wall and their accessibility
Verify the measurements of window and door openings according to the plan
Ensure that there is no tilt at the top of the walls before installing the truss with screws
Make sure the truss is straight vertically and distributed in its location as shown in the
technical drawings
Apply insulation (rock wool) and use aluminum tape
Install the profile sheet and make sure of the overlap in the drainage aligned equally
Fix the roof ridge
Install block filler into corrugated sheets
Install skirting in site after placement the unit in its dedicated location
Electrical Works
Installing electrical outlets and electrical pipes and installing them with supports
according to the technical plan
External walls
Waterproofing corners and pipe openings and ensuring that all pipes are firmly installed
fix the waterproofing of the corners and place the insulation in the spaces under the roof
sheets where they meet the wall sheets
Waterproofing pipe openings and ensuring that all pipes are firmly installed
Aluminum works
Installing windows, doors, and glass partitions in the bathrooms, make sure are
sealant, to prevent the entry of water and air
Installing rubber and silicone needed
Interior Accessories
Cleaning appropriately