ARCHITECTURAL EQUIPMENT

PAGES 1
REPORT NO.: FRM-206-A003 REV. NO 1

Client: Job No.:


Item Description Status Accept.
No. Yes No N/A

1 All equipment located and correctly tagged in accordance


with drawings
2 Equipment installed and correctly secured in accordance
with drawings
3 Full supply of loose galley equipment installed
4 All work surfaces and equipment free from damage
5 Hot and cold water supplies connected at applicable
locations/equipment, taps are secure with no dripping and
drain plugs perform the function
6 All piping connections correctly made, to applicable
equipment, adequately supported and installed to
specification
7 All equipment its specified function
8
9
10
11
12
13
14
15
16
17
18
Punchlist No.:

COMPANY
NAME
DATE
SIGNATURE