Earthwork CHECKLIST 503

Project

NO. STANDARD CHECK REMARKS


A STUDY ON CURRENT LAND CONDITION
1 Soil Investigation Report available
Y N NA
2 Work permit and approval from relevant authority received
Y N NA
B PREPARATION
1 Survey works done as per construction drawing Y N NA
2 Traffic diversion required Y N NA
3 Excavated trial holes to ascertain the position of underground Y N NA
services
4 Implementation of dust control system Y N NA
5 Temporary/permanent drain system properly provided Y N NA
6 Protection to private property done Y N NA
7 Relocation/protection of services done Y N NA
8 Underpinning/Shoring required Y N NA
C CUTTING, BACKFILLING & COMPACTION
1 Surface vegetation and top soil removed Y N NA
2 Excavation depth according to drawing, specification and/or OIC's Y N NA
instruction
3 Source of backfilling material tested and approved Y N NA
4 Backfilling and compaction to be done layer by layer. Y N NA
Max thickness: __________mm
5 Backfilling according to drawing, specification and/or OIC's Y N NA
instruction
6 Compaction done as per specification and drawing Y N NA
D TESTING REQUIREMENTS
1 Field Density Test conducted (Each layer shall be tested Y N NA
and approved by OIC prior to the placing of the next layer).
No. of tests conducted: __________
2 Test result acceptable and complies with specification Y N NA

Name of SS: Name of OIC:


Checked & Signed: Reviewed Non-compliance: Verified & Signed: Reviewed Non-compliance:

Date: Date: Date: Date: