1.0 PURPOSE
The purpose of this Job Method Statement is to define the method and safe practice for
surveying fire water line at Bintulu Crude Oil Terminal (BCOT).

2.0 SCOPE OF WORK


The scope of work during for the survey is as below;
i. Conduct survey for plain metric and vertical control connections to plant datum.
ii. Conduct pipe measurement for Fire waterline 4”-FW-631-1101, 8”-15-FW-3400 and
Fire Water pump house area

3.0 SURVEY WORK

Prior to the survey setting-out works, the surveyor and his crews will under take conformity
survey works at specific location to established checks and record the existing features and
condition of areas where works is to be carried out.

4.0 SURVEYOR AND SURVEY EQUIPMENTS

Piping Inspector : 1 pax


Surveyor : 2 pax
Chainman : 2 pax
IMMACULATE ENGINEERING Doc No:
IE-OP-L3-001
JOB METHOD STATEMENT FOR
REV.0
SURVEYING FIRE WATER LINE

Equipment list
No Description Quantity Unit
1 Total Station 1 no
2 Prism set 2 nos
3 Tripods 3 nos
4 Automatic Level 1 no
5 Levelling staff 2 nos
6 Topcon GPS Hiper V 1 nos
7 Measuring Tape 1 nos
8 Camera 1 nos
9 Walkie Talkie 2 nos

The survey equipment unit shall be calibrated with acceptable certificates by the
manufacturer with the time schedule. On site regular checks will be made to make that the
instrument is operating in accordance with the manufacturer’s specifications.

3.0 PREPARATORY WORK

3.1 Standard PPE equipment. Declaration of equipment via Good Entry form
3.2 JHA development, review & approve by Client
3.3 PTW for work execution
3.4 Gas test and toolbox talk session upon PTW approval & prior work execution
IMMACULATE ENGINEERING Doc No:
IE-OP-L3-001
JOB METHOD STATEMENT FOR
REV.0
SURVEYING FIRE WATER LINE

4.0 WORK SITE SURVEY

4.1 To ensure the conformity of the survey works all previous data to be adopted (Latest
survey data adopted in BCOT plant). The control survey network shall be adopting
existing control points which will be located and jointly confirmed and verified.
Extension to the provided plain metric control shall be provided by traverse method
using calibrated electronic equipment with data loggers or internal memory suitable
for field-to-finish concept of surveying.

The standard of survey requires an accuracy of not less than1:400 and an angular
misclosure of not exceeding 2’30” in 25 stations. All control points shall be
permanently marked as reference.

4.2 New Temporary Bench Marks (TBM) and Reference Marks (RM) will also be based
on level adopted in BIF plant. Extension to the height control network provided by
means of ordinary leveling method. All elevations shall be in meters and reduced to
BIF plant datum.

Leveling accuracy is expected in the limits of second order. The maximum misclosure
for a line of ordinary leveling closing back on the starting points is +12/K mm where K
is the length of the circuit in kilometer.

4.3 Upon completion the of the above activity, pegging & setting out works will be
carried out according to the approved Construction drawing.

4.4 Wooden pegs colored coded and labeled will be installed at setting out points. All
installed wooden pegs configurations shall be approximately 2 inches above ground &
not more than 4 inches underground.
IMMACULATE ENGINEERING Doc No:
IE-OP-L3-001
JOB METHOD STATEMENT FOR
REV.0
SURVEYING FIRE WATER LINE

4.5 The topographic data was logged by aiming the Total Station at the Target Prism held
on ranging pole of known height. The pole was held on the ground at permanent
features such as the drain, footpaths, roads, markers, spot levels, culverts, fence,
pipes, buildings etc.

4.6 On completion of the survey report will be produced and submitted for
approval/acceptance.