Pull Out Test Report – Beer Tuvia & Nir Chen

Purpose of the test:


Check the vertical and horizontal forces in specific points, as defined by Soltec, at the
Beer Tuvia site.
The results are designated to be the data log for the pylons design, along with the
geo technical survey that has been performed, on Lat February.

Description:
On April 12,2020 the pull-out test was performed, on rammed piles as defined by
Soltec.
The piles, were stick in the ground at a 2.5 m depth (according to the geotechnical
survey recommendations)

1
Piles Coordinates
Attached the KMZ file.

Tested Piles:
IPE 180 & IPE 200

Test Description:
Was performed according to:

• SE-EN-2169_en-Rev.02- Pull out test specifications -Beer Tuvia.Rev.02


• GP-EN-2001_en-Rev.10a-Pull test general procedure
• Information as given by Soltec team, during several meetings.

Testing Equipment:

Load cell – 10 tons capacity

2
Digital weight Indicator Rinstrum R320

Digital longitude displacement indicator

3
All testing equipment was calibrated at the calibration simulator, at the RONAR LAB
SYSTEMS- Ranana Israel.
Calibration certificate of the simulator, calibration approval and declaration –
attached.

Results
Attached in the Excel file.