On April 12,2020 the pull-out test was performed, on rammed piles as defined by
Soltec.
The piles, were stick in the ground at a 2.5 m depth (according to the geotechnical
survey recommendations)
1
Piles Coordinates
Attached the KMZ file.
Tested Piles:
IPE 180 & IPE 200
Test Description:
Was performed according to:
Testing Equipment:
2
Digital weight Indicator Rinstrum R320
3
All testing equipment was calibrated at the calibration simulator, at the RONAR LAB
SYSTEMS- Ranana Israel.
Calibration certificate of the simulator, calibration approval and declaration –
attached.
Results
Attached in the Excel file.
4
5
6