F - ABCD - 43FLBLDG - 78
SPECS MAPPING
CLIENT SUPPLIED SPECS SCMCDC DESIGNERS' SPECS FINAL SPECS
Submittals
Description
Required? Y/N
C.Quality Assurance
1. Codes and Standards, D 698, D 1556, D
Perform excavation work in 1557, D 2167, D
compliance with applicable 2216, D 2487, D
requirements of governing 2922, D 2937, D
Auhtorities 3017, D 4318
*Engage an
independent
Testing/Inspection
agency approved by
the Engineer to
perform soil testing,
compaction testing
2. Testing and inspection and inspection
services .
* Payment for
inspection and
testing included
under this section
shall be by the
Contractor.
Ensure conc.
3. Concrete Blinding Blinding specified in
section 03300
Dewatering work
4. Dewatering specified under
Section 02140
D. Submittals
Submit results of all
physical and/or
chemical tests
carried out on the
1. Test Reports proposed backfill/fill
material(s). - By
designated
Testing /Inspection
Agency.
Submit three (3)
copies of a final
survey prepared by
an authorized
2. Survey
surveyor identifying
the final excavation,
dimension and
levels.
Contractor shall
3. Method Statement
provide.
Permits and
approvals from
Authorities having
jurisdiction prior to
4. Permits
start of excavation,
provide copies of
permits to the
ergineer.
E. Job Conditions
1. Site Information
a. refer to contract drawings as Conduct own site
they affect the works of this investigation if
section. deemed necessary.
Assumed soil
bearing is kPa
(2000 psf).
The contractor shall
report in writing to
b. Section Includes :Section the engineer the
00010 - Soil report not actual soil
provided. conditions
uncovered and shall
confirm actual
bearing capacity
before depositing of
concrete.
It is expressly
c. Data about subsurface understood that the
conditions in these documents Engineer is not
is not intended as a responsible for
representation or warranty or interpretations or
accuracy, nor can continuity conclusions drawn
between soil bearings be there from on the
assumed. part of Contractor or
Sub-contractor.
Shall be made by
d. Additional test borings and the Contractor at no
other expolatory operations extra cost to the
Contract.
2. Existing utilities
Provide adequate
means of support
a. If utilities are to remain in
and protection
place
during earthwork
operations.
Advise the Engineer
b. Should uncharted, or
and consult utility
incorrectly charted, piping and
authority
other utilities be encountered
immediately for
during excavation,
direction.
Except when
permitted in writing
c. Do not interrupt existing by then Engineer
utilities serving facilities and then only after
occupied and used by the acceptable
Owner and others. temporary utility
services have been
provided.
Receive written
authorization to
d. Provide a minimum of 48-
proceed, before
hour notice to the Engineer
interupting any
utility.
e. Demolish and completely Co-ordinate with
remove (from site) existing utility authorities for
underground utilities indicated shut-off of services,
and/or required to be removed. if lines are active.
Part 2 - Products
A. Soil Materials
ASTM D3282-
93(2004)e1,
Group
calssificationA-1, A-
2 or A-3 .
Any fill material
placed within
1. Fill material 500mm of any
concrete structure
shall be free of
chemicals in such
concentrations that
it would cause a
deleteriouseffect on
concrete.
Same as Fill
2. Backfill material
material
20 Mpa
characteristic
3. Concrete fill
strength (fcu),
sulpahte
Fill resisting.
material placed
under fully
supervised
conditions,
4. Engineered fill
compacted and
tested to 98%
Standard Proctor
dry density .
5. Substituions Comply
Part - 3 Execution
A. General
B. Stability of Excavation
4. Areas to be excavated ,
including but not necessarily
limited to basements for pump
rooms, elevators, pits, sump
pits, etc. under the building and
trenches shall have sides of
excavations protected aginst
collapse.
C. SETTING OUT
D. EXCAVATION FOR
STRUCTURES
Maintain a
tolerance +/- 15mm
beneath reinforced
1. Conform to elevations and
concrete
dimensions shown.
foundations and
ground bearing
slabs.
2. Excavation shall include: the
removal of all earth, rocks,
boulders, remains of buildings,
services not ot be used and all
items found but required to be
removed, to permit the
construction of the buiding.
Excavate by hand
the last 200mm to
final garde, just
3. In excavating for before blinding is
foundations, take care not ot placed.Trim bottoms
disturb bottom of excavation. to required lins and
grades to leave
solid base to receive
other work.
The Contractor shall
raise the bottom of
4. Should excavations be the excavation to
extended by error or oversight the required level
to depths lower than reuiqred. using concrete fill, at
no additional cost to
the contract.
5. After excavation is
complete, the Contractor shall
notify the Engineer and the
Testing /Inspection Agency,
prior to pouring any concrete.
E. EXCAVATION FOR
TRENCHES
he more stringent
1. Should requirements of this
(as determined by
Section differ from those
the Engineer) shall
specified in Division 15 and 16,
govern.
Provide 150mm to
2. Dig trenches to the uniform 225mm celarance
width required for the particular on both sides of
item to be installed and pipe or conduit.
sufficiently wide to provide Provide all
ample working room. necessary planking
and strutting.
carry excavation
150mm below
required elevation
4. Where rock is encountered, and backfill with
concrete fill to the
underside of piles or
conduit prior to
installation of pipe.
do not excavate
beyond indicated
depths. Hand
5. For pipes or conduit 125mm
excavate bottom cut
or less in nominal size and for
to accurate
flat-bottomed multiple-duct
elevations and
conduit units,
support pipe or
conduit on
undisturbed soil.
Specs Conformance
Estimated Savings for
Estimated Cost the proposed Proposed
Conformed w/ Specified brand? Specified brand
Description Specified Brands Approved Equal Brands Specs/Type Material Variance Bid vs. REMARKS brand/spec. vs. Approve Equal JPS COMMENTS
Reference Cost estimated cost
Specified Brand Specified Brand (Bid Brand
Yes No Cost)
TYPE YOUR PROJECT NAME
PROJECT:
No cost for
Duct Insulation ACI Phil Insulation No specified brand
(ACI),since it is no
Phil. Ins. n/a longer existence Ok
no signifcant cost
Vibration Isolator Mason None
Tozen impact Must be Mason.
Must be Metraflex or
Flexible Joint Metraflex, Microflex E-Flex, Honeywell No
E-Flex no cost yet Microflex.
Greenheck,National,Niagara,
Fans & Blowers Filgen
Kruger, Chicago Yes Niagara n/a Ok
G.I. sheets Philsteel,APO Kawasaki Steel Yes Puyat (APO) n/a Ok
Johns- Must be Johns-Manville,
Flexible Duct None No
Manville,Siflex,Wiremold Phil. Ins. no cost yet Siflex, Wiremold
Tuttle and Bailey, LG air (alternate Must be Tuttle & Bailey, Trox,
Air devices (Grill, Diffusers & Dampers) Zonetech, LG Aire No
Trox,Carnes brand) no cost yet 2,968,940.14 TUTTLE & BAILEY 2,215,039.42 Zonetech Carnes.
Tube Turn,Taylor
Stainless Pipes & Fittings None No no signifcant cost Must be Tube Turn, or Taylor
Forge,Flowline, Grinnell
Sanyo seiki impact Forge, or Flowline, or Grinnell
SUB-TOTAL (PHP)