ICCP LISP IV - SERVICE AND MAINTENACE BLDG.

F - ABCD - 43FLBLDG - 78

SPECS MAPPING
CLIENT SUPPLIED SPECS SCMCDC DESIGNERS' SPECS FINAL SPECS
Submittals
Description
Required? Y/N

Type/Specs Brand Material Type/Specs Brand Material Type/Specs Brand Material

TYPE YOUR PROJECT NAME


PROJECT:
ADMINSITRATION BUILDING :
Part 1 - General
General conditions
of contract and the
A. General Requirements
requirements of Div.
1
B. Section Includes :

1. Excavation and Backfill


2. Excavation and backfill for
underground mech. & elect'l.
3. Coordinate with the ff:
sections
4. Definitions

C.Quality Assurance
1. Codes and Standards, D 698, D 1556, D
Perform excavation work in 1557, D 2167, D
compliance with applicable 2216, D 2487, D
requirements of governing 2922, D 2937, D
Auhtorities 3017, D 4318
*Engage an
independent
Testing/Inspection
agency approved by
the Engineer to
perform soil testing,
compaction testing
2. Testing and inspection and inspection
services .
* Payment for
inspection and
testing included
under this section
shall be by the
Contractor.
Ensure conc.
3. Concrete Blinding Blinding specified in
section 03300
Dewatering work
4. Dewatering specified under
Section 02140

D. Submittals
Submit results of all
physical and/or
chemical tests
carried out on the
1. Test Reports proposed backfill/fill
material(s). - By
designated
Testing /Inspection
Agency.
Submit three (3)
copies of a final
survey prepared by
an authorized
2. Survey
surveyor identifying
the final excavation,
dimension and
levels.

Contractor shall
3. Method Statement
provide.

Permits and
approvals from
Authorities having
jurisdiction prior to
4. Permits
start of excavation,
provide copies of
permits to the
ergineer.

E. Job Conditions

1. Site Information
a. refer to contract drawings as Conduct own site
they affect the works of this investigation if
section. deemed necessary.
Assumed soil
bearing is kPa
(2000 psf).
The contractor shall
report in writing to
b. Section Includes :Section the engineer the
00010 - Soil report not actual soil
provided. conditions
uncovered and shall
confirm actual
bearing capacity
before depositing of
concrete.
It is expressly
c. Data about subsurface understood that the
conditions in these documents Engineer is not
is not intended as a responsible for
representation or warranty or interpretations or
accuracy, nor can continuity conclusions drawn
between soil bearings be there from on the
assumed. part of Contractor or
Sub-contractor.

Rev.0 September 4,2019


CLIENT SUPPLIED SPECS SCMCDC DESIGNERS' SPECS FINAL SPECS
Submittals
Description
Required? Y/N

Type/Specs Brand Material Type/Specs Brand Material Type/Specs Brand Material

Shall be made by
d. Additional test borings and the Contractor at no
other expolatory operations extra cost to the
Contract.

2. Existing utilities

Provide adequate
means of support
a. If utilities are to remain in
and protection
place
during earthwork
operations.
Advise the Engineer
b. Should uncharted, or
and consult utility
incorrectly charted, piping and
authority
other utilities be encountered
immediately for
during excavation,
direction.
Except when
permitted in writing
c. Do not interrupt existing by then Engineer
utilities serving facilities and then only after
occupied and used by the acceptable
Owner and others. temporary utility
services have been
provided.
Receive written
authorization to
d. Provide a minimum of 48-
proceed, before
hour notice to the Engineer
interupting any
utility.
e. Demolish and completely Co-ordinate with
remove (from site) existing utility authorities for
underground utilities indicated shut-off of services,
and/or required to be removed. if lines are active.

Not permitted under


3. Use of Explosives
any circumtances
a. Barricade
4. Protection of Persons and excavation and
Property provdie warning
lights
b. Protect
structures, utilities,
sidewalks,
pavements, and
other facilities from
damage caused by
settlement, lateral
movement,
undermining, dry or
wet washout and
other hazards,
created by
earthwork
operations.
The Contractor shall
provide proper
supports for the
sides of excavation
to prevent collapse,
5. Safety of Excavations using all necessary
means, and shall be
responsible for the
safety of the
excavation and
workers concerned.

Part 2 - Products

A. Soil Materials
ASTM D3282-
93(2004)e1,
Group
calssificationA-1, A-
2 or A-3 .
Any fill material
placed within
1. Fill material 500mm of any
concrete structure
shall be free of
chemicals in such
concentrations that
it would cause a
deleteriouseffect on
concrete.
Same as Fill
2. Backfill material
material
20 Mpa
characteristic
3. Concrete fill
strength (fcu),
sulpahte
Fill resisting.
material placed
under fully
supervised
conditions,
4. Engineered fill
compacted and
tested to 98%
Standard Proctor
dry density .
5. Substituions Comply

Batch plant mix


composed of:
a. Concrete
aggregate: fines
1100kg; 20mm
6. Unshrinkable Fill coarse; 1100 kg.
b. Portland
cement: 25kg.
C. water as
required for
200mm slump.

Part - 3 Execution

A. General

Rev.0 September 4,2019


CLIENT SUPPLIED SPECS SCMCDC DESIGNERS' SPECS FINAL SPECS
Submittals
Description
Required? Y/N

Type/Specs Brand Material Type/Specs Brand Material Type/Specs Brand Material

Code of practice for


excavation and
filling, Excavation
should be true to
lines, widths and
depths shown on
Drawings or to such
1. Workmanship on building
lines, deppths,
sites
dimensions as
directed by the
Engineer to reach
appropriate bearing
strata and/or to
accommodate site
conditions.

B. Stability of Excavation

1. Construction of the Under sectio 02221


Excavation Perimeter Retention and applies to the
system building perimeter.

2. The Contractr shall take all


necessary precautions during
excavation for the works.
3. The Contractor shall be held
solely responsible for the safety
of buildings adjoining all
excavations and the
construction of and efficiency of
the shoring underpinning,
shutting, etc.

4. Areas to be excavated ,
including but not necessarily
limited to basements for pump
rooms, elevators, pits, sump
pits, etc. under the building and
trenches shall have sides of
excavations protected aginst
collapse.

5. Remove shoring and bracing


coincident with completed
concrete work as determined by
the Engineer.

C. SETTING OUT

1. The Contractor shall stake


out the work as shown on
Section01050
Drawings , in accordance with
requirements .

D. EXCAVATION FOR
STRUCTURES
Maintain a
tolerance +/- 15mm
beneath reinforced
1. Conform to elevations and
concrete
dimensions shown.
foundations and
ground bearing
slabs.
2. Excavation shall include: the
removal of all earth, rocks,
boulders, remains of buildings,
services not ot be used and all
items found but required to be
removed, to permit the
construction of the buiding.

Excavate by hand
the last 200mm to
final garde, just
3. In excavating for before blinding is
foundations, take care not ot placed.Trim bottoms
disturb bottom of excavation. to required lins and
grades to leave
solid base to receive
other work.
The Contractor shall
raise the bottom of
4. Should excavations be the excavation to
extended by error or oversight the required level
to depths lower than reuiqred. using concrete fill, at
no additional cost to
the contract.

5. After excavation is
complete, the Contractor shall
notify the Engineer and the
Testing /Inspection Agency,
prior to pouring any concrete.

E. EXCAVATION FOR
TRENCHES

he more stringent
1. Should requirements of this
(as determined by
Section differ from those
the Engineer) shall
specified in Division 15 and 16,
govern.

Provide 150mm to
2. Dig trenches to the uniform 225mm celarance
width required for the particular on both sides of
item to be installed and pipe or conduit.
sufficiently wide to provide Provide all
ample working room. necessary planking
and strutting.

Rev.0 September 4,2019


CLIENT SUPPLIED SPECS SCMCDC DESIGNERS' SPECS FINAL SPECS
Submittals
Description
Required? Y/N

Type/Specs Brand Material Type/Specs Brand Material Type/Specs Brand Material

Slope trenches for


piping to establish
3. Excavate trenches to depths
indicated flow lines
indicated and required .
and invert
elevations .

carry excavation
150mm below
required elevation
4. Where rock is encountered, and backfill with
concrete fill to the
underside of piles or
conduit prior to
installation of pipe.

do not excavate
beyond indicated
depths. Hand
5. For pipes or conduit 125mm
excavate bottom cut
or less in nominal size and for
to accurate
flat-bottomed multiple-duct
elevations and
conduit units,
support pipe or
conduit on
undisturbed soil.

6. For pipes or conduit 150mm


or largerin nominal size, tanks
and other

Rev.0 September 4,2019


SPECS MAPPING - [LIST OF MATERIALS (SPECIFIED AND ALTERNATES BRAND] F - ABCD - 43FLBLDG - 78

LIST OF MATERIALS (SPECIED AND ALTERNATES BRAND)

Specs Conformance
Estimated Savings for
Estimated Cost the proposed Proposed
Conformed w/ Specified brand? Specified brand
Description Specified Brands Approved Equal Brands Specs/Type Material Variance Bid vs. REMARKS brand/spec. vs. Approve Equal JPS COMMENTS
Reference Cost estimated cost
Specified Brand Specified Brand (Bid Brand
Yes No Cost)
TYPE YOUR PROJECT NAME
PROJECT:

Mechanical Works _HVAC SYSTEM


B.I. Pipes & Fittings Supreme Superpipes Schedule BI Yes Supreme n/a Ok
Grinnel,Jenkins,Crane,Keyst Lug type will be used by the
see specs for each
Valves on,Kitz, Honeywell ( Lug Showa,Schmidt Lug Type No Honeywell ( Wafer Honeywell PMT in compliance to OSPI's
system
Type) Type) n/a 506,000.00 506,000.00 ( Wafer Type) specified brand

Griswold,Flowcon Do we have balancing valves


Balancing Valves None No on the plan? If yes, it must be
International, Flowcontrol
Griswold, or Flowcon
Honeywell International, or Flowcontrol

Tour and Anderson,


Control Valve Yamatake,Control Tech
Johnson,Honeywell,Belimo
Yes Belimo n/a Ok
no signifcant cost
Automatic air vent APCO Minivent
Honeywell impact Must be APCO.
Pressure guage Ashcroft,Duragauge,Crosby,So Wika,Honeywell Yes Ashcroft n/a Ok
Thermometer Evert Angle,Weiss,Weksler Whistler,Wika Yes Weksler n/a Ok
Pipe Insulation Armaflex Thermoflex Yes Armaflex n/a Ok

No cost for
Duct Insulation ACI Phil Insulation No specified brand
(ACI),since it is no
Phil. Ins. n/a longer existence Ok
no signifcant cost
Vibration Isolator Mason None
Tozen impact Must be Mason.
Must be Metraflex or
Flexible Joint Metraflex, Microflex E-Flex, Honeywell No
E-Flex no cost yet Microflex.
Greenheck,National,Niagara,
Fans & Blowers Filgen
Kruger, Chicago Yes Niagara n/a Ok
G.I. sheets Philsteel,APO Kawasaki Steel Yes Puyat (APO) n/a Ok
Johns- Must be Johns-Manville,
Flexible Duct None No
Manville,Siflex,Wiremold Phil. Ins. no cost yet Siflex, Wiremold
Tuttle and Bailey, LG air (alternate Must be Tuttle & Bailey, Trox,
Air devices (Grill, Diffusers & Dampers) Zonetech, LG Aire No
Trox,Carnes brand) no cost yet 2,968,940.14 TUTTLE & BAILEY 2,215,039.42 Zonetech Carnes.

Mechanical Works _PROCESS SYSTEM


G.I. Pipes & Fittings Supreme Superpipes Yes Supreme n/a Ok

Tube Turn,Taylor
Stainless Pipes & Fittings None No no signifcant cost Must be Tube Turn, or Taylor
Forge,Flowline, Grinnell
Sanyo seiki impact Forge, or Flowline, or Grinnell

Grinnell,Jenkins,Crane,Keyst Honeywell - for 65,80


Valves for PVAC Schmidt
one, Kitz, Honeywell & 100mm, Kitz -for
Yes 50mmdia. & below Ok
Grinnell,Jenkins,Crane,Keyst
Valves for CDA Schmidt
one, Kitz, Honeywell Yes Kitz n/a Ok
Control Valve Yes Belimo n/a
no signifcant cost
Automatic air vent APCO Minivent No
Honeywell impact Must be APCO.
Ashcroft,Duragauge,Crosby,
Pressure guage Wika,Honeywell
Solfrunt Yes Ashcroft n/a Ok
Thermometer Evert Angle,Weiss,Weksler Whistler,Wika Yes Weksler n/a Ok
Pipe Insulation Armaflex Thermoflex Yes Armaflex n/a Ok
no signifcant cost
Vibration Isolator Mason None
Tozen impact Must be Mason.
no signifcant cost Must be Metraflex or
Flexible Joint Metraflex, Microflex E-Flex, Honeywell No
E-Flex impact Microflex.
Greenheck,National,Niagara,
Fans & Blowers Filgen
Kruger, Chicago Yes Niagara n/a Ok
G.I. sheets Philsteel,APO Kawasaki Steel Yes Puyat n/a Ok
Spiral Round Duct Spiral Group, Spiro None Yes Spiral Group n/a Ok
no signifcant cost Must be Johns-Manville,
Flexible Duct Johns-Manville,Siflex,Wiremo None No
Phil. Ins. impact Siflex, Wiremold
LG air (alternate Tuttle and Bailey, or Trox, or
Air devices (Grill, Diffusers & Dampers) Tuttle and Bailey, Trox,Carne Zonetech, LG Aire No
brand) Carnes
PVC/CPVC Pipes & Fittings Harrington, Apex, GF, Spears None Yes Apex n/a Ok
Fire Protection System - -
B.I. Pipes & Fittings Supreme Superpipes Yes Supreme n/a Ok
no signifcant cost Must be Grinell, or Reliable, or
Sprinkler Heads Grinell, Reliable, Star Viking,Globe,Tyco No
Tyco impact Star
Fire Hose Cabinet Guardland No Firemaster Must be Guardland
Portable Fire Extinguisher Kidde, Amerex,Ansul Yes Amerex n/a Ok
no signifcant cost
Valves Grinell, Reliable Nibco
Tyco impact Must be Grinell, or Reliable

Rev.0 September 4,2019


Plumbing /
Sanitary / Storm
Drainage Works

Atlanta Tempipe,Charlotte, Unitect pipe


Water Distribution Piping (Cold Water Line) Flowguard Gold No
Philsaterm,Bor Plus Atlanta no cost yet 1,155,156.19 ( Belden) Must be Flowguard Gold
Corzan for CPVC. But UPVC
Sanitary Sewer, Waste & Condensate drain Corzan Atlanta CPVC Pipe,Charlotte No
Atlanta 3,800,000.00 ASTRAL POLY TE - Atlanta
Vent lines Atlanta,Moldex uPVC Pipe Crown uPVC Yes Atlanta Ok
Storm Drainage Line Atlanta,Moldex uPVC Pipe Crown uPVC Yes Atlanta Ok
Clean Outs Unilex Eurobrass,Metma Yes Unilex Ok
Drains Unilex Eurobrass,Metma Yes Unilex Ok
Gate Valves-Pump Assembly Bermad Singer Honeywell Must be Bermad
Check valves -Pump Assembly Bermad Singer Honeywell Must be Bermad
Pressure Reducing Valves Bermad Singer Honeywell Must be Bermad
Float Valves Bermad Singer Honeywell Must be Bermad
Gate Valves-Water Distribution System Kitz Siam, Crane, Nibco Yes Kitz Ok
Check valves -Water Distribution System Kitz Siam, Crane, Nibco Yes Kitz Ok
no signifcant cost
Pumps Homa,Bell & Gossette ITT, Aurorra No
Danfoss impact Must be Homa,Bell & Gossette
Bladder Tanks Amtrol Superflow Yes No Armtrol Ok
Firestop Sealant Hilti Promat No n/a Ok

SUB-TOTAL (PHP)

TOTAL PROJECT COST 7,274,940.14 3,876,195.61

Rev.0 September 4,2019