This document is a checklist for inspecting brickwork at a construction site. It contains checks to perform before, during, and after brickwork. Some key checks include ensuring the work surface is clean and ready, materials are available, layout and dimensions are correct, proper bonding and thickness of mortar is used, and curing of brickwork for 15 days after completion. The purpose is to ensure quality control and compliance with specifications at each stage of the brickwork process.
This document is a checklist for inspecting brickwork at a construction site. It contains checks to perform before, during, and after brickwork. Some key checks include ensuring the work surface is clean and ready, materials are available, layout and dimensions are correct, proper bonding and thickness of mortar is used, and curing of brickwork for 15 days after completion. The purpose is to ensure quality control and compliance with specifications at each stage of the brickwork process.
This document is a checklist for inspecting brickwork at a construction site. It contains checks to perform before, during, and after brickwork. Some key checks include ensuring the work surface is clean and ready, materials are available, layout and dimensions are correct, proper bonding and thickness of mortar is used, and curing of brickwork for 15 days after completion. The purpose is to ensure quality control and compliance with specifications at each stage of the brickwork process.
Sr DESCRIPTION YES NO Remark 1 Has the FLOOR where brickwork is to be carried out is cleaned properly before line out. 2 Has all the surface where brickwork is going to touch is properly HACKED & ready to receive the brickwork? Check the column faces and beam bottom. 3 Check for adequate availability of proper material for execution of work 4 Check for any Client changes 5 Check for Appropriate size of Pharma for mortar batching. 6 Check for mixing tray for mixing the mortar. 7 Check for arrangement for soaking of bricks. 8 Check the layout, plumb of column, lines of beam, and record it. Is it O K? 9 Is longest line is set first and ⊥cular is taken from longest line 10 Are the external faces are set correctly by checking the plumb for external face. 11 Is the first layer is laid in level and checking proper line and ⊥cular to longest line 12 Check the diagonal and dimensions of all individual rooms. Is it O .K? Remarks if any
13 Are bricks are soaked in water for at least 15 mins before
laying the bricks. 14 Check for the thickness of mortar thickness (<10 mm) 15 Check for bond of brickwork. Is it O. K? (Breaking of Joints and bond) 16 Is mortar is used within initial setting of cement. 17 Ensure flush pointing of brickwork. 18 Is the RCC band is provided where ever required 19 Check for location of door and window opening is provided at proper place 20 Check for Location opening required for Air conditioning a. Return Air opening b. sleeves for conduits c. A/c Grill openings d. Duct routing POST EXECUTION CHECKS 21 Check for date of brickwork, is it mentioned on the brickwork curing point of view 22 Check for curing for at least 15 days 23 Check for cleaning of area and wastage of material and record it.