You are on page 1of 10

PERANCANGAN KURSUS

JABATAN TEKNOLOGI
COURSE OUTLINE
ELEKTRIK DAN ELEKTRONIK
MAKLUMAT KURSUS
PROGRAM TEKNOLOGI ELEKTRONIK
(COURSE INFORMATION)

SEMESTER/SESI (SEMESTER/SESSION) : SEMESTER 4


KOD KURSUS (COURSE CODE) : DEB4113
NAMA KURSUS (NAME OF COURSE) : INDUSTRIAL MANAGEMENT

BEBAN AKADEMIK PELAJAR (STUDENT ACADEMIC LOAD):


Kategori Aktiviti Aktiviti Pembelajaran Jumlah Jam/Semester
(Category of Activities) (Learning Activity) (Total Hours/Semester)
Kuliah
26
(Lecture)
Pembelajaran Berbantu Amali
28
(Guided Learning) (Practical)
Aktiviti Pembelajaran Bertumpukan Pelajar
2
(Student Centered Learning Activity)
Persediaan Untuk Tugasan/Projek
22
(Preparation For Assignments/Projects)
Pembelajaran Kendiri Pembelajaran Kendiri/Ulangkaji
26
(Self Learning) (Independent Study/Revision)
Persediaan Bagi Penilaian
8
(Preparation For Assessment)
Penilaian Rasmi Penilaian Berterusan
6
(Formal Assessments) (Continuous Assessments)
Menduduki peperiksaan akhir teori
2
Penilaian rasmi (Final examination sitting for theory)
(Formal assessments) Menduduki peperiksaan akhir amali
0
(Final examination sitting for practical )
JUMLAH JAM BELAJAR (JJB)
120
[TOTAL STUDENT LEARNING TIME (SLT)]
NILAI KREDIT
3
(CREDIT VALUE)

Kursus Pra-syarat (Pre-Requisite Course) : None


Nama Pensyarah (Name of Lecturer) :

Disediakan oleh Penyelaras Kursus Tandatangan


:
(Prepared by Course Leader) (Signature)
Nama (Name) : Tarikh (Date) :

Disemak oleh Ketua Program Disahkan oleh Ketua Jabatan


: :
(verified by) (Head of Programme) (Approved by) (Head of Department)
Tandatangan Tandatangan
: :
(Signature) (Signature)
Nama (Name) : Nama (Name) :
Tarikh (Date) : Tarikh (Date) :

DEB4113 1
MATLAMAT (GOALS) :

This course covers industrial managerial skills such as human and product resource and quality management.

SINOPSIS (SYNOPSIS):

This course covers the concept of prepare production schedule, plant/layout line, work instruction, improvement plan, implement
quality improvement plan, monitor work progress, monitor subordinate discipline, counsel non-performing subordinate and evaluate
subordinate appraisal.
HASIL PEMBELAJARAN (LEARNING OUTCOMES):

Upon completion of the course, students will be able to:


1. Assess work instruction, progress and performance according to management requirement. (C3,PLO3)
2. Formulate quality control and equipment analysis based on standard procedure. (A3,PLO5)
3. Prepare production schedule, quality improvement plan, quality control and equipment analysis using management
requirement. (A4,PLO9)
ISI KANDUNGAN (CONTENT):

MINGGU KANDUNGAN PENTAKSIRAN


(WEEK) (CONTENT) (ASSESSMENT)
1 1.0 PREPARE PRODUCTION SCHEDULE USING COMPUTER (4 HOURS)
1.1 Identify customer requirement.
1.1.1 Determine audio video product list according to requirement.
1.1.2 Identify communication procedure according to communication
system standard.
1.1.3 Check audio video product according to customer requirement.
1.1.4 Apply communication procedure according to communication
system standard.
1.2 Review production requirement.
1.2.1 Identify model type according to production requirement.
1.2.2 Check raw material status according to production requirement.
1.2.3 Check production capacity status according to industrial
requirement.
1.3 Generate customer schedule.
1.3
1.3.1 Identify software application according to standard operation
software.
1.3.2 Determine reporting procedure according to standard report.
1.3.3 Utilize software application according to standard operation
software.
1.3.4 Apply reporting procedure according to standard report.
2 2.0 PREPARE LAYOUT LINE USING COMPUTER SOFTWARE (4 HOURS) Presentation 1
2.1 Generalizes production schedule. (Task 1 & 2)
2.1.1 Identify documentation system according to standard operation (1 hour)
procedure. Quiz
2.1.2 Determine management information system according to

DEB4113 2
management regulation.
2.1.3 Utilize documentation system according to standard operation
procedure.
2.1.4 Apply management information system according to management
regulation.
2.2 Review production schedule.
2.2.1 Explain product process flow according to production schedule.
2.2.2 Identify product process flow according to production schedule.
2.2.3 Check machine capacity according to requirement production
control.
2.3 Perform layout line.
2.3.1 Identify software application according to standard operation
software.
2.3.2 Utilize software application according to standard operation
software.
2.3.3 Apply reporting procedure according to standard report.
3 3.0 PREPARE WORK INSTRUCTION USING COMPUTER SOFTWARE (4 HOURS) Written Test 1
(1 hour)
3.1 Identify process requirement.
3.1.1 Explain process flow according to computer software.
3.1.2 Prepare various types of work instruction according to computer
software.
3.1.3 Check model type according to process requirement.
3.1.4 Utilize work instruction according to production control.
3.1.5 Apply process flow according to process requirement.
3.2 Arrange appropriate work instruction.
3.2
3.3
3.2.1 Identify various types of work instruction according to production
control.
3.2.2 Determine computer software according to standard operating
software.
3.2.3 Select appropriate work instruction according to production control.
3.2.4 Apply computer software according to standard operating
software.
3.3 Produce appropriate work instruction.
3.3.1 Explain work instruction format according to standard operating
procedure.
3.3.2 Perform work instruction format according to standard operating
procedure.
3.3.3 Apply document work instruction according to standard operating
procedure.
4-6 4.0 PREPARE IMPROVEMENT PLAN USING RELATED REFERENCES AND Presentation 2
STANDARDS (12 HOURS) (1 hour)
4.1 Define acquire quality assurance standard.
4.1.1 Identify quality assurance performance according to standard
operating procedure.
4.1.2 Identify management information system according to standard
operating procedure.
4.1.3 Check quality assurance performance according to standard

DEB4113 3
operating procedure.
4.1.4 Utilize management information system according to standard
operating procedure.
4.2 Describe quality assurance standard effectiveness.
4.2.1 Interpret statistical analysis according to quality assurance
standard.
4.2.2 Utilize statistical analysis according to quality assurance standard.
4.2.3 Apply process control standard according to quality assurance
standard.
4.2.4 Check performances procedures according to quality assurance
standard.
4.3 Produce quality assurance improvement plan.
4.3.1 Identify quality assurance improvement format plan according to
quality assurance standard.
4.3.2 Perform document quality assurance improvement plan according
to quality assurance standard.
4.4 Submit improvement plan for approval.
4.4.1 Identify approval authorities according to quality assurance
standard.
4.4.2 Perform presentation skill according to quality assurance standard.
4.4.3 Present proposal according to quality assurance standard.
4.4.4 Apply convince management according to quality assurance
standard.
7-9 5.0 IMPLEMENT QUALITY IMPROVEMENT PLAN USING RELATED REFERENCES
AND STANDARDS (12 HOURS)
5.1 Discus improvement purpose.
5.1.1 Identify new requirements of quality according to job specification
requirement.
5.1.2 Explain possible benefit from improvement according to standard
operating procedures.
5.1.3 Check new requirements of quality according job specification
requirement.
5.1.4 Interpret quality related problems according to job specification
requirement.
5.1.5 Determine possible benefit from improvement according to job
specification requirement.
5.1.6 Perform estimate budget according to job specification
requirement.
5.1.7 Check resources required according to job specification
requirement.
5.2 Select improvement method.
5.2.1 Identify improvement requirement according to job specification
requirement.
5.2.2 Identify new and available technology according to job
specification requirement.
5.2.3 Utilize relate between improvement requirement and technology
according to job specification requirement.
5.2.4 Check effective technology according to job specification
requirement.
5.3 Execute approved improvement plan.

DEB4113 4
5.3.1 Explain project schedule according to job specification
requirement.
5.3.2 Calculate project costing according to job specification
requirement.
5.3.3 Check project resources allocation according to job specification
requirement.
5.3.4 Apply project schedule according to job specification requirement.
5.3.5 Perform project resources according to job specification
requirement.
5.4 Produce quality Improvement report.
5.4.1 Identify formatting report according to standard operating
procedures.
5.4.2 Utilize documentation report according to standard operating
procedures.
5.4.3 Perform format report according to standard operating procedures.
5.4.4 Apply recorded document report according to standard operating
procedures.
10 - 11 6.0 IMPLEMENT QUALITY CONTROL USING REFERENCES, QUALITY ANALYSIS Presentation 3
EQUIPMENT (8 HOURS) (Task 5 & 6)
6.1 Determine customer requirement. (1 hour)
6.1.1 Identify quality control specification according to quality Project
management standard. (Task 5 & 6)
6.1.2 Utilize customer requirement according to quality management (1 hour)
standard.
6.2 Prepare quality control standard.
6.2.1 Identify quality control standard according to quality management
standard.
6.2.2 Apply quality controls methodology/tools according to quality
management standard.
6.2.3 Prepare quality control documentation according to quality
management standard.
6.2.4 Set up quality control standard according to quality management
standard.
6.2.5 Produce quality control documents according to quality
management standard.
6.3 Submit quality control standard proposal for approval.
6.3.1 Prepare quality control management according to quality
management standard.
6.3.2 Perform present proposed quality control standard according to
quality management standard.
6.4 Obtain feedback on proposal.
6.4.1 Determine quality control methodology/tools according to quality
management standard.
6.4.2 Check proposal feedback according to quality management
standard.
6.4.3 Apply proposal according to quality management standard
6.5 Carry out quality control standard.
6.5.1 Identify quality control standard according to quality management
standard.
6.5.2 Apply quality control standard according to quality management

DEB4113 5
standard.
6.6 Produce quality control implementation report.
6.6.1 Explain quality control report according to standard operating
procedures.
6.6.2 Identify quality control documentation report according to standard
operating procedures.
6.6.3 Utilize format report according to standard operating procedures.
6.6.4 Record document report according to standard operating
procedures.
12-13 7.0 MONITOR WORK PROGRESS USING WORK SCHEDULE (8 HOURS)
7.1 Prepare acquire work schedule.
7.1.1 Determine management information system according to job
specification requirement.
7.1.2 Select standard operating procedures according to job
specification requirement.
7.1.3 Obtain work schedule according to job specification requirement.
7.1.4 Utilize management information system according to job
specification requirement.
7.1.5 Apply standard operating procedures according to job specification
requirement.
7.2 Perform monitoring methods.
7.2.1 Explain work monitoring list criteria according to job specification
requirement.
7.2.2 Select work monitoring criteria according to job specification
requirement.
7.2.3 Apply work schedule according to job specification requirement.
7.3 Check work progress implementation.
7.3.1 Explain methods of monitoring work progress according to job
specification requirement.
7.3.2 Identify human behaviour according to job specification
requirement.
7.3.3 Apply methods of monitoring work progress according to job
specification requirement.
7.3.4 Check actual work progress according to job specification
requirement.
7.3.5 Perform work progress with relevant parties according to job
specification requirement.
7.4 Report progress status.
7.4.1 Explain formatting progress status report according to standard
operating procedures.
7.4.2 Prepare documentation progress status report according to
standard operating procedures.
7.4.3 Determine format progress status report according to standard
operating procedures.
7.4.4 Record document progress status report according to standard
operating procedures.
14 8.0 MONITOR JOB PERFORMANCE USING PERSONNEL RECORDS (4 HOURS) Written Test 2
(Task 7 & 8)
8.1 Explain job performance.
(1 hour)
8.1.1 Differentiate job description according to job specification

DEB4113 6
requirement.
8.1.2 Identify job performance standard according to job specification
requirement.
8.1.3 Utilize job description according to job specification requirement.
8.1.4 Apply performance standard according to job specification
requirement.
8.2 Review job performance record.
8.2.1 Explain job instruction according to job specification requirement.
8.2.2 Utilize job performance procedures according to job specification
requirement.
8.2.3 Determine job instruction according to job specification
requirement.
8.2.4 Perform job performance procedures according to job specification
requirement.
8.3 Discuss job performance with candidates.
8.3.1 Identify interpersonal skill according to job specification
requirement.
8.3.2 Utilize job performance standard according to job specification
requirement.
8.3.3 Apply interpersonal skill according to job specification requirement.
8.4 Produce job performance report.
8.4.1 Explain formatting job performance report according to standard
operating procedures.
8.4.2 Apply documenting job performance report according to standard
operating procedures.
8.4.3 Utilize format progress status report according to standard
operating procedures.
8.4.4 Record document progress status report according to standard
operating procedures.
15 STUDY WEEK
16 FINAL EXAMINATION WEEK
17 FINAL EXAMINATION WEEK

AMALI (PRACTICAL) :

DEB4113 7
PENILAIAN (ASSESSMENT):

No Type of Assessment CLO


Continuous Assessment CLO 1 – C3,PLO3 CLO 2 – A3,PLO5 CLO 3 – A4,PLO9
Test (20%)
-Written Test 15%
1 -Quiz 5%
Assignments (40%)
-Individual Presentation 10%
-Group Presentation 10%
-Project 20%
Final Examination
2
Theory (40%) 40%
Sub Total 60% 20% 20%
Total 100%

ASSESSMENT SPECIFICATIONS TABLE (AST):

ASSESSMENT METHODS FOR


CLO COURSEWORK (CA)
TEST ASSIGNMENTS

PRESENTATIO
CONTENT

PROJECT
WRITTEN
CLO1

CLO2

CLO3

TEST
QUIZ

N
C3 A3 A4 5% 15% 20% 20%
1. Prepare production schedule using computer
X X

2. Prepare layout line using computer software


x X

3. Prepare work instruction using computer software X X


4. Prepare improvement plan using related references and
X X
standards
5. Implement quality improvement plan using related
references and standard
X X X X
6. Implement quality control using references, quality analysis
equipment
7. Monitor work progress using work schedule
X X
8. Monitor job performance using personnel records

DEB4113 8
RUJUKAN UTAMA (MAIN REFERENCES):
1. Abdul Talib Bon (2018), Pengurusan Industri (UTHM)
2. Peter Kidd and Bryan Field (2014). Powerfully Simple Meetings: Your Guide For Fewer, Faster, More Focused Meetings.
(Meeting Result)

KEHADIRAN/PERATURAN SEMASA KULIAH ( LECTURE ATTENDANCE / REGULATION ):

1. Pelajar mesti hadir tidak kurang dari 80% masa pertemuan yang ditentukan bagi sesuatu kursus.
Students must attend lectures not less than 80% of the contact hours for every course .

2. Pelajar yang tidak memenuhi perkara (1) di atas tidak dibenarkan menduduki sebarang bentuk penilaian selanjutnya. Markah
sifar (0) akan diberikan kepada pelajar yang gagal memenuhi perkara (1).
Students who do not fulfill (1) will not be allowed to sit for any further examination. Zero mark (0) will be given to students who
fail to comply with (1).

3. Pelajar perlu mengikut dan patuh kepada peraturan berpakaian yang berkuatkuasa dan menjaga disiplin diri masing-masing
untuk mengelakkan dari tindakan tatatertib diambil terhadap pelajar.
Students must obey all rules and regulations and must discipline themselves in order to avoid any disciplinary actions against
them.

4. Pelajar perlu mematuhi peraturan keselamatan semasa proses pembelajaran dan pengajaran.
Student must obey safety regulations during learning and teaching process.

MATRIK HASIL PEMBELAJARAN KURSUS DAN HASIL PEMBELAJARAN PROGRAM


(MATRIX OF COURSE LEARNING OUTCOMES AND PROGRAMME LEARNING OUTCOMES )

Dilampirkan (As attached).

DEB4113 9
MATRIK HASIL PEMBELAJARAN KURSUS DAN HASIL PEMBELAJARAN PROGRAM
MATRIX OF COURSE LEARNING OUTCOMES AND PROGRAMME LEARNING OUTCOMES

Jabatan (Department) : TEKNOLOGI ELEKTRIK DAN ELEKTRONIK Matrik ini perlu digunakan bersama:
Program (Programme) : TEKNOLOGI ELEKTRONIK 1. Objektif Pendidikan Program (PEO)
Kod Kursus (Course Code) : DEB4113 2. Hasil Pembelajaran Program (PLO)
Nama Kursus (Course Title) : INDUSTRIAL MANAGEMENT

Pematuhan kepada PLO (Compliance to PLO)


Kaedah
Kaedah
Bil. Hasil Pembelajaran Kursus Pentaksiran

PLO10

PLO11
Penyampaian KPI

PLO1

PLO4

PLO7
PLO2

PLO3

PLO5

PLO6

PLO8

PLO9
(No.) (Course Learning Outcomes) (Method of
(Method of Delivery)
Assessment)

Assess work instruction, progress and Quiz, Written 100% of


1 performance according to management C3 Lecture Tests, Written students scored
requirement. (C3,PLO3) Final Exam more than 50%

Formulate quality control and Case study, 100% of


2 equipment analysis based on standard A3 Project, Group Project students scored
procedure. (A3,PLO5) Work, Discussion more than 50%

Prepare production schedule, quality


Case study, 100% of
improvement plan, quality control and
3 A4 Project, Group Presentation students scored
equipment analysis using management
Work, Discussion more than 50%
requirement. (A4,PLO9)
Jumlah (Total) 60% 20% 20%

Taksonomi Pembelajaran (Learning Taxonomy)


Kognitif (Cognitive) Psikomotor (Psychomotor) Afektif (Affective)
C1 Pengetahuan (Knowledge) P1 Persepsi (Perception) A1 Menerima (Receiving)
C2 Pemahaman (Comprehension) P2 Set (Set) A2 Memberikan Maklum Balas (Responding)
C3 Aplikasi (Application) P3 Respons Berpandu (Guided Response) A3 Menilai (Valuing)
C4 Analisis (Analysis) P4 Mekanisme (Mechanism) A4 Mengorganisasi (Organising)
C5 Sintesis (Synthesis) P5 Respons Ketara Kompleks (Complex Overt Response) A5 Menghayati Nilai (Internalising)
C6 Penilaian (Evaluation) P6 Adaptasi (Adaptation)
P7 Lakuan Tulen (Origination)

DEB4113 10