PROJECT NAME:CONSTRUCTION OF 132KV D/C OHTL BETWEEN ABU QAEED 132KV S/S & AL HAQU 132KV S/S

ELEMENT 2.9d
DAILY INSPECTION CHECKLIST FOR PALE LOADER
PROJECT CONSTRUCTION OF 132KV D/C OHTL BETWEEN ABU QAEED 132KV S/S & AL HAQU 132KV S/S DATE
CONTRACTOR RAISSY COMPANY VEHICLE NO
OPERATOR’S NAME LICENSE NO
INCHARGED SUPERVISOR THIRD PARTY

EQUIPMENT Condition Picture of Equipment


Sl Items to be Check (Description) SAT SUN MON TUE WED THU FRI

Hydraulic system and Engine(Fluid, Oil,


1 fuel & Battery)
Bucket, bucket teeth, bucket cutting edge
2
and lift arms

3 Pale Loader Cab, Canopy Frame, ROPS/


FOPS.

4 Wheels &Tires

5 Center Articulation point

6 Horn & Reversing Alarm

7 Lights & Hazard Beacon

8 Seat belt & Brakes

9 Fire Extinguisher

Note:  OK  Not Ok

Inspected By Reviewed by
Remarks : Remarks :
________________________________________________________________________ ________________________________________________________________
______________________________________________________ ________________________________________________________________
Name: Date: Sign Name: Date: Sign

Page 1 of 1 Rev.2 [08-April-2019] Projects Business Unit