Professional Documents
Culture Documents
CHECKED &
PREPARED BY : BADRUL BIN IDRIS : NORAZIZI BIN NORDIN
APPROVED BY
POSITION : SAFETY & HEALTH OFFICER POSITION : PROJECT MANAGER
SIGNATURE : SIGNATURE :
REVISION : 00
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL REVISION DATE : 12 .06.2022
LOCATION/ CADANGAN MENDAPATKAN KELULUSAN KEBENARAN MERANCANG SEKSYEN 9, KOTA PUTERI SERTA MENYIAPKAN KERJA TANAH DAN INFRASTRUKTUR UTAMA YANG BERKAITAN DI SEBAHAGIAN SEKSYEN 9, KOTA PAGE : PAGE 1 of 2
PROJECT PUTERI (FASA 1), MUKIM RAWANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN
(A) LAUNCHING BEAM TRUSS FOR ELEVATED MAINDRAIN CROSSING AIR SELANGOR MAIN PIPE
1. Mobilization of lorry and • Improper access / • Lorry / crane topple - Pre-inspection access 1 4 4 LOW CSS Sub-
crane 160 tons ground condition condition before contractor
for heavy demobilization.
machineries - Ensure ground for access
in good condition.
- Lay crusher run if required
• Collision between • Property damage - Provide escort car during 2 4 8 MEDIUM Supplier,
machineries demobilize Sub-
- Provide traffic controller contractor
for sharp
turn/reverse/positioning.
▪ Improper ground ▪ Crane topple ▪ Levelling and compact 2 4 8 MEDIUM Operator,
2. Positioning crane 160ton condition ground for crane position CSS
▪ Provide steel plate
▪ Ensure outrigger fully
extended
▪ Inspection stability of
crane before start
operation
3. Unloading steel truss • Load fall during ▪ Serious body injury ▪ Operated by competent 2 4 8 MEDIUM Operator,
lifting using crane ▪ Fatality crane operator CSS
• Property damage ▪ Inspection before lifting
work with checklist
• Ensure correct and proper
lifting gear use
• Load swing ▪ Serious body injury ▪ Operated by competent 2 4 8 MEDIUM CSS
during lifting • crane operator
using crane ▪ Control load by tagline
4. Launching beam truss • Load fall during ▪ Serious body injury ▪ Operated by competent 2 4 8 MEDIUM Operator,
lifting using crane ▪ Fatality crane operator CSS
▪ Property damage ▪ Inspection before lifting
work with checklist
▪ Ensure correct and proper
lifting gear use
• Working at ▪ Serious body injury ▪ Permit to work system 2 3 6 MEDIUM CSS
height ▪ (PTW), Erect proper
working platform
▪ Ensure scaffold / working
platform is safe to use
ABBREVIATION(S)
TBT : Toolbox Talk SWP : Safe Work Procedures WAH : Working at Height SHO : Safety & Health Officer SS : Site Supervisor
SOP : Standard Operating Procedures SSS : Site Safety Supervisor PE : Professional Engineer JT : Project Engineer CSS : Contractor Site
Supervisor
FORM REF : FORM/SHE/HIRARC/01
VERSION : 01
REVISION : 00
HAZARD IDENTIFICATION, RISK ASSESSMENT AND RISK CONTROL REVISION DATE : 12 .06.2022
LOCATION/ CADANGAN MENDAPATKAN KELULUSAN KEBENARAN MERANCANG SEKSYEN 9, KOTA PUTERI SERTA MENYIAPKAN KERJA TANAH DAN INFRASTRUKTUR UTAMA YANG BERKAITAN DI SEBAHAGIAN SEKSYEN 9, KOTA PAGE : PAGE 2 of 2
PROJECT PUTERI (FASA 1), MUKIM RAWANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN
ABBREVIATION(S)
TBT : Toolbox Talk SWP : Safe Work Procedures WAH : Working at Height SHO : Safety & Health Officer SS : Site Supervisor
SOP : Standard Operating Procedures SSS : Site Safety Supervisor PE : Professional Engineer JT : Project Engineer CSS : Contractor Site
Supervisor