Professional Documents
Culture Documents
PEMBINAAN RKAT MARKAS ANGKATAN BERSAMA (MAB) DI WORK ACTIVITY : SITE CLEARING AND EXCAVATION
PREPARED BY : Abdul Hafiz bin Abdul Rahman
SUNGAI PANCHING, KUANTAN WORKS
LOCATION : Site Project HIRARC NO : 02 REV NO : 00 REVIEWED & APPROVED BY : Mujibur Rahman bin Muhammad
Page 1 of 3
area and inspected by
designated person
Effect • Make proper slope
near excavation area.
• Serious injury/fatality Protect slope with
• Damage to properties plastic sheets to avoid
erosion during rain
• Safety signages
• Provide shelter/resting
area for workers during
hot weather
• Water to be taken
regularly to stay
hydrated
• 5-10 minutes rest after
every 2-3 hours work
• Spray water to reduce
dust emmision
Monitoring/supervision
Page 2 of 3
Hazard • To provide appropriate PPE Monitoring/supervision
OSHA
• Toolbox / pre task talk before
Section
working • To provide signalman
• Struck by moving 15
at dumping area
machinery / vehicle Adminis • HSE
• Maintain proper access Modera
5. Unloading soil • Lorry overturn 2 5 10 Major trative OSHA 1 5 5 • PIC of
te
control Section works
Effect 24
• Serious injury/fatality
Others
• Damage to properties
Will happen more than Work shall not commence until a permit to work is
Very Likely 4 Unacceptable Permanent disability 4 10-19 MAJOR
once during this project in place.
Page 3 of 3