(DROPS)
Release Date Revision Number
20-09 -2020 R03
Revision History
Department
Revision No. Revision Date Description Revised By
Affected
R00 Sept 2013 Initial issue QHSE QHSE Manager
R02 Dec 2020 Reviewed against new IMS QHSE QHSE Director/
and updated Ops Managers
R03 Sep 2021 Revised against PDO QHSE Ali Karmat/ Malik
comments Al-Hashami
Table of Contents
......................................................................................................................................................................1
1.0 Purpose ............................................................................................................................................3
2.0 Definition of Dropped Objects .......................................................................................................3
2.1 Static dropped object .................................................................................................................3
2.2 Dynamic dropped object ............................................................................................................3
2.3 DROPS Red Zone ........................................................................................................................3
2.4 DROPS Temporary No-Go Zone ................................................................................................4
2.5 Zone Maps....................................................................................................................................4
3.0 Responsibilities ...............................................................................................................................4
3.1 Contract/Operations Manager........................................................................................................4
3.2 Rig Manager .................................................................................................................................5
3.3 DROPS Focal Point .....................................................................................................................5
3.4 All Personnel ...............................................................................................................................5
4.0 Details of Equipment and Operations that to be covered in DROPS.........................................5
4.1 Hoist equipment ..........................................................................................................................5
4.2 Transportation: ............................................................................................................................6
4.3 General: ........................................................................................................................................6
5.0 DROPS Inspection ..........................................................................................................................7
6.0 Forbidden Equipment and Practices ............................................................................................7
7.0 Training ..................................................................................................................................................8
9.0 References/ Records ......................................................................................................................8
10.0 Appendices ..................................................................................................................................9
10.1 Appendix 1- Inspection Guidelines ...........................................................................................9
1.0 Purpose
The purpose of this document is to meet the requirements to prevent harm to personnel and WE
damage to equipment from dropped objects whilst carrying out Workover activities for PDO
(Reference PDO SP 2079)
For the purpose of focusing prevention and elimination strategies dropped or potential dropped
objects are classified as either static or dynamic.
Access to a DROPS Red Zone shall be controlled and authorized by the Area Authority or
delegate of the applicable red zone area. The Area Authority or delegate shall ensure:
• Only personnel who have a specific responsibility to conduct the task are authorized to enter
the DROPS Red Zone
• All personnel entering a DROPS Red Zone are made aware of the hazards, including
machinery which may be operated during the task
• The area on the rig floor, substructure & catwalk area shall be a permanent Red zone with
clearly identified Area Authority.
• Unit specific RED ZONE map shall be displayed near to the red zone and shall be used
during the Tools Box talks to inform people of the hazards related to Dropped Objects,
Note: Examples of Area Authority: Driller for the Rig floor area, Asst Driller /Roustabout foreman for
Catwalk area, Operator for CT units etc
A DROPS No-Go zone is an area for which a high potential (HIPO) consequence for dropped
objects has been identified during the Risk Assessment and where people are not normally
present or required to be present during standard operations. The following shall be complied
with:
• DROPS No-Go Zones are to be physically barricaded off (e.g., by gates, fence or chains)
and signage be placed to prevent unauthorised access to the work site.
• The extent of the barricaded zone must take into account the height an object can drop from,
the potential path it may take (including deflection) and environmental factors. Access to
DROPS No-Go Zone shall be controlled by a documented method (e.g. Area Authority
managing the entry to the Zone, Permit to Work (PTW) system etc).
Note: Examples of DROPS temporary No-Go zones area near a catwalk/substructure when
continuous tubular handling activity takes place or additional dynamic dropped risks are
introduced i.e. a crane lifting items to the rig floor etc, work area close to the catwalk and/or (semi-)
automated pipe- handling system, area designated by the path of the Coiled Tubing Reel to the
injector head, area designated by the path of the Wireline from the Wireline unit to the Wireline
lubricator on the well etc
• This Zones/Step back shall be identified as part of the Dropped Objects Survey done on the
unit.
• The zone map should be based on the risk of all potential static dropped objects and when
any activity with the potential of dynamic dropped object arises the zones shall be extended
based on the risk or made into a No Go Zone
• The area authority for the zones shall be clearly identified and mentioned in the Zone Map
Note: If rig/hoist dimensions make the creation of Step Back safety zones impossible or
impractical, a separate Risk Assessment must be made to identify an agreed step back area.
3.0 Responsibilities
4.2 Transportation:
- Movement of wells equipment to/from and between PDO locations
- Vessels, road transport
- Movement in and around the location with forklifts, manlifts, multi-functional vehicles and
portable cranes
4.3 General:
- Personnel working at height
- Use of tools at height
- Objects at height (crossover flanges, nuts and bolts, etc.)
- Simultaneous operations and work at different heights
- Barrier policy
o No-Go Zones in which there is a high potential risk for dropped objects. These areas shall
be controlled with a permit to work and be physically marked off at all times with rigid or
chained barriers.
o Red Zones in which there is a high or medium potential risk for dropped objects. A
designated person in charge (PIC) shall be accountable for permitting personnel to enter
the Red Zone. Step back safety zones adjacent to the Red Zone shall be clear and shall
have fixed gates across designated access points to Red Zones to provide additional
control and increase awareness.
Note: if rig/hoist dimensions make the creation of Step Back safety zones impossible or
impractical, a separate Risk Assessment must be made to and controls implemented to mitigate
the risk to personnel from dropped objects adjacent to any Red Zone.
• All equipment and loads shall be inspected prior to transportation, for secure retention or
removal of loose objects not intended for transportation to the operations site or return to logistics
base.
• Routine DROPS inspections shall be performed weekly and on rig up of other well
intervention equipment. (See Appendix 1 for inspection guidelines.)
• An independent dropped object survey of the permanent installation structure (fixed derrick type
rigs) shall be performed prior to all rig start-ups and every two years thereafter.
• A documented procedure for pre-mast raising, post-mast raising and pre- mast lowering
inspections shall be in place and strictly followed.
• Dropped object inspections shall be performed following jarring of stuck pipe, activities causing
excessive vibrations or severe storms.
7.0 Training
DROPs required training
10.0 Appendices
Crown block
- Check painted lines on crown block hold down bolts to ensure they have not slackened off.
- Check crown sheaves for defects, i.e. excessive noise or melted grease (signifying sheave
running hot).
- Check hold down arrangement on each individual sheave and ensure it is tight and secure.
- Check crown sheaves for excessive tar build-up, especially below the crown block.
- Check from all possible angles to ensure there is no tar build-up on steelwork.
- Consult with the driller prior to removing excess tar. Ensure the drill floor is barriered off, in
case of dropped tar.
- Check all grease lines and grease nipples, ensuring grease lines are properly secured.
- No grease tubes/guns left at height.
- Check the drill line retaining device on crown sheaves. Report any signs of fouling keeper
bars or excessive movement on bars. Report any changes from previous inspection.
- Is the bumper block in good condition and secured?
- What improvements can be made to the current securing arrangement?
Ladder/steelwork
- Check ladders and derrick steelwork as you climb to ensure you identify defective areas
before you get onto them.
- Check paint marks on ladder brackets to ensure bolts have not slackened off.
- Check steelwork for bent or damaged sections.
- Report any excess movement of any ladder, even if the bracket is secure.
- Check individual rungs for even spacing and uniform construction.
- Check safety frames (back scratchers) for damage/security.
- Check climbing assist devices, especially around top sheave and wire line termination.