You are on page 1of 7

Company Contract Territory Originator Facility Sequence

System Code Discipline Document Type


Code Code Code Code Number

8015 0151 CK01 00 000 HS RP 06219

ENGINEERING, PROCUREMENT & CONSTRUCTION OF


GAS TURBINE POWER PLANT EXPANSION AT THE WEST
QURNA (PHASE 2) CONTRACT AREA

WEEKLY SUBCONTRACTOR HSE MANAGEMENT


WALKTHROUGH REPORT
DR. CONCRETE

Alparslan
00 22- AUG-22 IFI Issued for information C. Burak KAYGIN Selim Gunay
Aksezgin
REV DATE STATUS ISSUE PURPOSE ISSUED BY REVIEWED BY APPROVED BY

Table of Contents
Engineering, Procurement & Construction
of Gas Turbine Power Plant Expansion at
the West Qurna (Phase 2) Contract Area
Weekly Subcontractor Management HSE Walkthrough Report DR. CONCRETE Rev.: 0 Status: IFI
DOCUMENT No.: 8015-0151-CK01-00-000-HS-RP-06219 Page: 2 of 7

1. DOCUMENT REVISION HISTORY SHEET............................................................................3


2. PURPOSE....................................................................................................................................4
3. IMPLEMENTATION..................................................................................................................4
4. ATTENDEES | PARTICIPANTS................................................................................................4
5. HAZARDS AND OBSERVATION SHEET...............................................................................6
6. OBSERVATION CLOSEOUT AND PICTORIAL EVIDENCES.............................................7
Engineering, Procurement & Construction
of Gas Turbine Power Plant Expansion at
the West Qurna (Phase 2) Contract Area
Weekly Subcontractor Management HSE Walkthrough Report DR. CONCRETE Rev.: 0 Status: IFI
DOCUMENT No.: 8015-0151-CK01-00-000-HS-RP-06219 Page: 3 of 7

1. DOCUMENT REVISION HISTORY SHEET

UPDATE / AMENDMENT DETAILS


REV STATUS DATE ISSUED

00 IFI 22- AUG-22 Issued for Information


Engineering, Procurement & Construction
of Gas Turbine Power Plant Expansion at
the West Qurna (Phase 2) Contract Area
Weekly Subcontractor Management HSE Walkthrough Report DR. CONCRETE Rev.: 0 Status: IFI
DOCUMENT No.: 8015-0151-CK01-00-000-HS-RP-06219 Page: 4 of 7

2. PURPOSE
The purpose of safety walk down is to show the management commitment towards health, safety and
environment of the Project.
AS per KPI, CALIK performs safety walk down on weekly basis in order to determine safety condition
on site and identify areas for improvement.
HSE walk through shows the support and leadership of management towards HSE and to motivate
employees to work in safe way avoiding unsafe behaviours, acts and conditions.
The effectiveness of the Weekly Walkthrough and Inspection Program leads to the achievement of the
following objectives:

 Construction operations and activities are executed in accordance with the established HSE
Plans, Procedures and Method Statements to ensure compliance with applicable and current
HSE legislation, regulations, standards and Company requirements.
 Seek of Opportunity for Improvement by the involvement of Management during HSE
inspections.
 Enhancing positive HSE culture and motivation of frontline supervisors and workers.

3. IMPLEMENTATION
HSE Walk through is conducted weekly basis.
High management from both company and Contractor perform the site visits to randomly chosen site.
During the walk-through management observes whether the HSE requirement are met, raises observation
and questions employees and supervisors in order to evaluate the level of implementation of Company and
Contractor HSE procedures.
After Management HSE Walk through, CONTRACTOR shares all HSE issues to all attendees for
necessary actions at their part.

4. ATTENDEES | PARTICIPANTS

NAME AND POSITION OF HSE SITE TOUR PARTICIPANTS


CALIK ENERJI DR.CONCRETE
1. C. Burak KAYGIN – HSE Engineer 1. Mohammad Yahya – HSE Supervisor
2. Aytunç Elmacı– Project Eng. 2. Adil Salman – Site Engineer
3. Mohammad Khalid– HSE Supervisor 3. Ali Raad –Foreman
Engineering, Procurement & Construction
of Gas Turbine Power Plant Expansion at
the West Qurna (Phase 2) Contract Area
Weekly Subcontractor Management HSE Walkthrough Report DR. CONCRETE Rev.: 0 Status: IFI
DOCUMENT No.: 8015-0151-CK01-00-000-HS-RP-06219 Page: 5 of 7
Engineering, Procurement & Construction
of Gas Turbine Power Plant Expansion at
the West Qurna (Phase 2) Contract Area
Weekly Subcontractor Management HSE Walkthrough Report DR. CONCRETE Rev.: 0 Status: IFI
DOCUMENT No.: 8015-0151-CK01-00-000-HS-RP-06219 Page: 6 of 7

5. HAZARDS AND OBSERVATION SHEET


Observation Suggested Due
Mark Observation | Visual Material
Description Corrective Action Date

Pre walkdown meeting


conducted; participants
were briefed about
1 ongoing activities, NA NA
permits in place and
number of personnel at
site

Observed that;
The red tag is placed on
2 Positive Observation NA
the unfinished/
incomplete scaffold.

Observed that;
Scaffolder is wearing
full body harnesses
and 100% Tie OFF
3 while working at Positive Observation NA
height. A tool lanyard
is also provided.

Observed that;
Debriefing of the
walkthrough has been
4 NA NA
conducted and
observations were
summarized.
Engineering, Procurement & Construction
of Gas Turbine Power Plant Expansion at
the West Qurna (Phase 2) Contract Area
Weekly Subcontractor Management HSE Walkthrough Report DR. CONCRETE Rev.: 0 Status: IFI
DOCUMENT No.: 8015-0151-CK01-00-000-HS-RP-06219 Page: 7 of 7

1. OBSERVATION CLOSEOUT AND PICTORIAL EVIDENCES


Observation Recap & Detail of
Pictorial Evidence | Visuals of the Actions Taken
Actions Taken
Observation No. 02

Observation No. 03

Observation No. 04

Observation No. 05

You might also like