Contractor: POST BOX NO. 90, AL-KHOBAR – 31952
KINGDOM OF SAUDI ARABIA
Contract No.: 11.07.22/628/EPC/RT/18-19/PROC-EUCL-MD/JCK/rm
DESIGN, SUPPLY, PROCUREMENT AND INSTALLATION - CONSTRUCTION
Project title: OF 30kV LINE FROM KABARONDO TO NASHO IRRIGATION PROJECT IN
EASTERN PROVINCE
Sl. COMMENT
TITLE AND DETAILS DOCUMENT / DRAWING NO. REV STATUS
No. ATTACHED
MANUFACTURING IN-PROCESS
QUALITY CONTROL PLAN &
1 EUCL-628-NCC-DIS-ITP-DOC-006 0
FAT PLAN / PROCEDURE FOR
OPGW & ITS FITTINGS
Status: A = Approved, AEN = Approved Except as Noted, NA = Not Approved, FI = For Information
CONTRACTOR
V. KRITHIVASAN
Divisional Manager
_________________
Signature & Stamp
MANUFACTURING IN-PROCESS QUALITY
CONTROL PLAN & FAT PLAN / PROCEDURE
FOR OPGW & ITS FITTINGS
CONTRACT NO. DOCUMENT / DRAWING NO. DTS REF. & DATE REV.
11.07.22/628/EPC/RT/
EUCL-628-NCC-DIS-ITP-DOC-006 NCC/EUCL/TL/DTS/012 & 04.05.2020 0
18-19/PROC-EUCL-MD/JCK/rm
MANUFACTURING IN-PROCESS
QUALITY CONTROL PLAN
Shenzhen SDG Information Co., Ltd
SHENZHEN SDGI-CABLE
QUALITY ASSURANCE MANUAL
VERSION: A
ISSUED BY: QUALITY ASSURANCE MANUAL COMPLIE GROUP
DATE:
AUTHORIZED BY: the Administrative Representative
DATE:
APPROVED BY: the General Manager
DATE:
Shenzhen SDG Information Co., Ltd
SUBJECT: POLICY AND PURPOSE STATEMENT
1.0 Our policy is to provide the customers with reliable products and
satisfactory service.
1.1 It is the purpose of SDGI that the rate of qualified products should be over
98.5% and rate of customer complaint be below 1%.
1.3 Any major request for amendments or revisions after the signing of the contract shall
be referred to paragraph 1.1 and 1.2 for re-assessment or notifying concerning
responsible sections about the change.
SUPPORTING DOCUMENTATION:
PROCEDURE FOR CONTRACT ASSESSMENT
Shenzhen SDG Information Co., Ltd
SUBJECT: PROCESS CONTROL
2. Process Control includes production planning control and production technique control,
and is mainly implemented by the Production Department; The Quality Control
Department is responsible for its supervision to ensure the production process is
performed under controlled conditions.
SUPPORTING DOCUMENTATION:
Incoming Material Control Procedure
Non-conforming Product Control Procedure
Inspection and Testing Conditions Procedure
Inspection Procedure of Finished Products
Shenzhen SDG Information Co., Ltd
SUBJECT: NON-CONFORMING PRODUCTS CONTROL
4.1 To prevent the delivery and use of non-conforming products, the non-conforming
material or parts shall be strictly controlled for outsourcing materials and the whole
process of production. The Quality Control Department personnel shall identify, mark and
record the non-conforming material or parts in the process of production, storage and
inspection.
4.1.1 When a non-conforming condition is realized for raw material, semi-finished or
finished products, the inspection record and marking shall be completed and a
measurement of segregation shall be taken if necessary.
4.1.2 When a non-conforming condition is realized for outsourcing material, the timely
report shall be reviewed by the General Engineer to decide the manner of disposal
(concession acceptance or refundment).
4.1.3 When the produced part is detected non-conforming, the following measurements
shall be taken:
4.1.3.1 The Production Department is responsible for the repair or rework.
4.1.3.2 If the repair or rework is successful, the processed products will be re-inspected
and recorded in compliance with former inspection procedure.
4.1.3.3 If the repaired or reworked products cannot meet the requirement of the contract,
the Quality Control Department and the Sales Department shall negotiate with the
customer for concession acceptance. If not, the products shall be segregated for
preservation.
4.1.3.4 When serious non-conforming condition is detected, an assessment group made
up of the Quality Control Department, Production Department and relating departments
headed by the General Engineer to assess the non-conforming condition, and relating
record shall be kept.
SUPPORTING DOCUMENTATION:
Non-conforming Product Control Procedure
Shenzhen SDG Information Co., Ltd
SUBJECT: CORRECTIVE AND PRECAUTION ACTIONS
SUPPORTING DOCUMENTATION:
Non-conforming Product Control Procedure
Corrective Actions Procedure
Precaution Actions Procedure
Management Procedure of Customer Feedback
Shenzhen SDG Information Co., Ltd
SUBJECT: HANDLING, STORAGE, PACKAGE, SAFEKEEPING AND DELIVERY
6.1 The handling, storage, package, safekeeping and delivery of outsourcing material,
semi-finished and finished products shall be controlled in a manner as to prevent products
from misuse, damage or deterioration.
6.1.1 HANDLING
The Supply Department is responsible for the transportation of incoming materials, the
delivery of warehousing and ex-warehousing materials, as well as shipment and delivery
of the finished products. The Production Department will cooperate in loading and
handling.
6.1.2 STORAGE AND SAFEKEEPING
6.1.2.1 The warehousing of outsourcing material shall be done in compliance with
Incoming Material Control Procedure;
6.1.2.2 The outsourcing material, semi-finished and finished products shall be stocked in
the warehouse, and the warehouse keeper shall perform the work of marking, registration,
storage and safekeeping; The storage condition shall be controlled in a manner as to
prevent damage and deterioration; The stock status shall be checked in accordance with
Warehouse Management Regulation, and the Quality Control Department shall be notified
for required inspection and testing.
4.1.2.3 The delivery of outsourcing materials shall be performed by the warehouse keeper
in accordance with specified regulation and the principle of first in, first out (FIFO). The
deposit of materials shall be easy for FIFO. The materials or parts with storage period
shall be used within the time limit. After the expiration time, the materials or parts shall be
handled according to related warehouse management regulations.
4.1.2.4 PACKAGE:
The Production Department will package the products according to the company’s
regulations, and the Quality Control Department takes charge for checking and
supervision.
4.1.3 DELIVERY
The Supply Department is responsible for delivering the products to the customer. The
responsibilities of safety and quality assurance shall be specified when consigning other
company for transportation.
SUPPORTING DOCUMENTATION:
Inventory Management Procedure
Shenzhen SDG Information Co., Ltd
SUBJECT: TRAINING
7.1 All the quality-involved staff will receive orientation training and assessment. The
responsible persons of different departments take charge to organize the training for the
staff of their respective departments; the Quality Control Department is in charge of
supervising and checking the training job and for managing the training records. The
Working Permit Certificate will be issued for those qualified.
7.1.1 CLASSIFICATION OF TRAINING
7.1.1.1 New employee orientation; Transition of job training;
7.1.1.2 Quality system documentation training for involved personnel;
7.1.1.3 Training for inspection personnel;
7.1.1.4 Training for professional personnel;
7.1.1.5 Training for personnel of special post;
7.1.1.6 Training for internal auditor
7.1.3 Responsible person of training: the responsible persons of different departments will
establish and implement the requirements and plan of training and assessment for
relevant department; the training officer of the Quality Control Department is responsible
for the establishment of the overall training programme of the company and the
supervision of its implementation.
7.1.4 Supervision and record management for training: the training officer of the Quality
Control Department is responsible for the supervision and record management for
training.
7.1.5 Issue of Working Permit Certificate: the Quality Control Department is responsible
for the issue of Working Permit Certificate.
SUPPORTING DOCUMENTATION:
Training Management Procedure
FAT PLAN / PROCEDURE
ShenZhen SDG Information Co., Ltd
——————————
..........—————————————————————
.....................———————————
...........———
...—
.
NO. ITEMS Reference Document for Testing Sample Plan Test Location
5 Weight per unit length of cable Approved Drgs. / CUSTOMER Spec SDGI Factory Lab
————————————————————————————————
................................
OPGW FITTINGS INSPECTION TEST PLAN (ITP)
Sample Size
S.No. Lot Size A R1 R2
I – Stage II - Stage
(1) (2) (3) (4) (5) (6)
1. 101 to 500 5 5 0 2 2
2. 501 to 1000 8 8 0 2 2
3. 1001 to 3000 13 13 0 2 2
4. 3001 to 10000 20 20 0 3 4
5. 10001 to 35000 32 32 1 4 5
6. 35001 and above 50 50 2 5 7
The no. of hardware fittings to be selected at random from the lot shall be in accordance with Col 1
and Col 2 of above Table. It required additional hardware fittings as given in Col 3 of Table 1 shall
also be selected at random.
Criteria for Conformity: Each of the hardware fittings selected in the first stage in accordance with
Col 1 and Col 2 of the above table shall be subjected to all acceptance tests. A fitting shall be
declared defective if it fails in any of these tests. The lot shall be considered as conforming to the
requirements of acceptance tests if the number of defectives in the sample is less than or equal to
corresponding acceptance number (see Col 4). The lot shall be rejected if the no. of defectives is
equal to or greater than first rejection, R1 (see Col 5). If the number of defectives are in between ‘A’
and R1 a second sample of same size (see Col 3) shall be selected from the lot at random and
subjected to the tests. If the number of defectives in the two samples combined is less than R2 (see
Col 6), the lot shall be considered as conforming to the requirements of acceptance tests, otherwise
the lot shall be rejected.
ShenZhen SDG Information Co., Ltd
———————————————————————————————
...............................——————————————
..............—
.
In order to know clearly how many samples are required for each test item, will be follow below table
Sample Distribution Scheme
Sample Sample Sample Sample Sample Sample
Description Test item Reference Document for Testing size size size size size size
5 8 13 20 32 50
1:Visual Material verification and dimensional checks Approved Drgs. / CUSTOMER Spec 5 8 13 20 32 50
1.Visual Material verification and dimensional checks Approved Drgs. / CUSTOMER Spec 5 8 13 20 32 50
Suspension
2.UTS/Mechanical Strength of the assembly Approved Drgs. / SDGI Spec 2 3 6 9 14 21
Assembly
1.Visual Material Verification and Dimensional Check Approved Drgs. / CUSTOMER Spec 5 8 13 20 32 50
Down Lead
Clamp
2.Galvanizing Test SDGI Spec 5 8 13 20 32 50