Date: 2021.10.02 Name: Manuel Libuit Jr. Position: HSE Officer Site: Work Site
Corrective Action: Immediately replaced expired fire extinguisher with a new one.
Brief Description: Loose materials was left unattended on the scaffolding platform.
Corrective Action: Immediately advised the scaffolder to removed materials and properly arrange in designated storage area
DATE: 2021.10.02 Report by: Manuel Libuit Jr. Position: HSE Officer Site: Work Site
Brief Description: It was observed that Distribution Box without fire fighting equipment
Immediate Cause: Fire and explosion hazard Root Causes: Inadequate monitoring / instruction
Corrective Action: Coordinate to foreman to provide fire extinguisher near the DB to be use incase of emergency.
Brief Description: It was observed that plywood and debris are hanging on the ceiling that might possibly fall to workers - falling object risk.
Corrective Action: Immediately advised operatives to removed the plywood and debris to prevent unwanted incident.
Date: 2021.10.02 Name: Manuel Libuit Jr. Position: HSE Officer Site: Work Site
Brief Description: Protruding rebars without protection caps was observed that might be cause of cuts or punctured - Impalement hazard
Corrective Action: Immediately advised foreman to provide protection caps to prevent unwanted incident.
Brief Description:
Corrective Action: