Sie Specific Risk Assemssent


General Notes Site ID - 1106 Scope of work - Telecom Installation

1. drivers shallhave Valid License to drive.


2. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket).
4. Do not access the site without Safety Induction.
5. Understant the Manual Handling proceedure - to delier by Contractor EHS prior the work
6. Alll driver must summit to the authoruty and the controls of the site supervisor at all time
7. Pre-Task Briefing Must be done before any work on site, and must include all team members.

Risk Assessment - Installation of Telecom Equipment


RISK ASSESS RISK ASSESS Risk after further action

TASK HAZARD RISK WHO IS EXPOSED? CONTROL MEASURES Further Control


L S RV Risk Level L S RV Level L S RV Risk Level

• Driver must have valid driving license & Defensive Driving Training • Drivers must always avoid any deep
• Vehicle must be fit for the job discussion with passengers to avoid lost of
• Vehicle must be in good working conditions concentration.
• Inspect the vehicle before starting
• Fix the identified problems before moving to site •Vehicle must be fitted with GPS device
• All passengers must fasten the seat belts (front and rear)
• Any load in the vehicle should be properly secured and distributed • Drivers Must be Trained on defensive
Driving • Driving • No material in the front or rear seats of the vehicle driving
• Fatality • Do not use mobile phone while driving
•Traffic Hazards • Passengers
• Injury, 4 4 16 High • Never over speed • Never drive under the influence of the drugs 3 4 12 Medium 1 4 4 Low
1. Material Mobilization • Collusion • General Public
• Property Damage • Drivers must be very watchfull of other road users during driving
2. Pasenger Mobilization • Weather condition
• Drivers must always keep the volume of the car tape as low as possible if at all to be on.

Site Supervisor to stand By and Monitor the


access.

Where possible, the Leader should be


• Use internal stairs to access the roof top. secured.
.For access at height, ladder shall be used, where not present already.
• Other person should hold the Ladder while another person is accessing. Full body harness,
Stability Double Lanyard, Positioning Lanyard, Safety shoes, Climbing Helmets, Tower Climbing
Fall • Broken borns gloves, safety goggles & Slings to be used while doing work at height.
Site Access/At height access Tip over Head • Injuries • Employee 3 3 9 Medium • Tower climbers must inspect the monkey ladder & tower before climbing, In case of 2 3 6 Medium 1 3 3 Low
Injury while accessing • Property Damage finding any abnormality do not climb and report to safety department
under the beam • Always use connectors/carabiners/hooks in verticale position
• Never put double lanyard hooks on the same anchor point. Make sure the persons
working at height are trained by huawei certified third party. Make sure no lone working is
allowed while working at height. Ateendant to be present on the ground at all times.

• Conduct Tool box talk before start of work to clearly elucidate the hazard and its controls • Appropriate PPE must be use such as safety
Manual Handling • Employees should follow safe manual handling and lifting techniques boots and hard hats and gloves.
1. Equipment lifting • Heavy duty Hand gloves may be required to lift retifiers
• Equipment Weight
2. Equipment Off-load • Dimensions
• Back injury • Avoid awkward postures always • Work Under compitent supervisor
• Sharp Object
• Foot injury
• Employees 3 3 9 Medium
• Ensure good house keeping at site 2 3 6 Medium 1 3 3 Low
3. Equipment assembly and • Human Eror
• Cut or crush fingers • Keep the walkways clear from any obstruction
• Bone Disorderliness • Placing of heavy equipmnet should required more people (15Kg per one)
preparation before Installation • Hit or crush by

• Trip and Fall • Pre Trask Briefing to be delivered before the Task commence
Cabling • PPE Inspection prior use.
• Sharp Object • Injury • Proper PPE to be used: ( Gloves, safety shoes, Helmets)
1.Cable routing and arrangement
• Cut or Crush • Workers on site • careful while working on sharp edges, and must use gloves
on the ground
• protruding Object • Property damage
4 2 8 Medium
• Must use appropriate ladder to access the high portion of the cable tray 2 2 4 Low Hand Gloves Must be used 1 2 2 Low
2. Working on cable trays • follow the use of ladder safety incase use of Ladder
• Awkward Posture • the right equipment should be used for cable routing inside the cable tray
• Avoid Awkward posture while working on cable tray
2 of 2
Sie Specific Risk Assemssent
RISK ASSESS RISK ASSESS Risk after further action

TASK HAZARD RISK WHO IS EXPOSED? CONTROL MEASURES Further Control


L S RV Risk Level L S RV Level L S RV Risk Level

Job rotation to be done. Load task


assessment to be done as per physical capabilities of the workers.
Tandem lifting to be done if the weight is
more than 20kg. Continuous supervision to be made sure

Manual Handling
• Workers on site Make sure the mandatory PPE is worn by
Fatigue/Upper limb Body pain/Muscle
disorders pain/muscle stiffness 4 3 12 Medium 4 2 8 Medium the team during working. 4 1 4 Low
Manual Handling

• Work must be carried out under the supervsision of a competent person Continuous monitoring is requried
• Only trained and certified tower climbing & rescue workers will work on ladder
• Accessories must be kept in protected bags in order not to fall on the ground • Work on hold in case of strong wind (=>45
• Inspect PPE, Rescue Equipment, Fall Arestor prior use km/hr) or adverse weather ( monitoring)
• Proper PPE to be used:
• EHS officer to monitor the 100% connecting at
Full body harness, Double Lanyard, Positioning Lanyard, Safety shoes, Tower Climbing
all time on any height above 2 metters
Helmets, Climbing gloves, safety goggles & Slings
• Ladder climbers must inspect the ladder before climbing, In case of finding any
Equipment Installation abnormality do not climb and report to safety department
• Height • Always use connectors/carabiners/hooks in verticale position
Working at height • Falling Objects • Never put double lanyard hooks on the same anchor point
• Weather Condition • Fatality
• Injury Employees 3 5 15 High
• All damaged PPEs must be marked as damaged and removed from site immediately 2 5 10 Medium 1 5 5 Medium
RRU Installation • Incompitency • Never work after sunset or before sunrise
• Equipment Weight • Property Damage
• All workers on site must be wearing helmets. Material management to be done whicle
Working near Parapet Fall from roof installting RRUs. Tandem lifting of the equipment to be done if exceeding 20kg. Site to be
kept tidy & free from obstructions that could cause slip trips & falls. Do not stand close to
the parapet as parapet height is very small.

• Only Qualified electrical engineer will work on powering Job Should be done under compitent supervisor
• Never work with live electricity use lockout tag out system
• Do not wear conductive metal or jewelry (bracelets, chains, rings, etc.)when working on Electrical Enginer Must be third party cerfied in
electricity electric safety training.
• Shortcircuit • Use appropriate company insulated tools for the job
Electrical works • Electocution • Fatality, • LOTO proceedure should be applied
• Workers, • Use Appropriate Electrical PPE during the powering
• wrong connection • injury, • Equipments 3 5 15 High 2 5 10 Medium 1 5 12 Medium
Site Powering • Incompitency • Equipment damage
• Spark

• Be coution of sharp object and protruding object during waste removal.


• Waste must be stored at designated area, with MSDS been followed for specific
product/waste. • appropriate
and minimum PPE should be used by participants: Safety boot, appropriate hand gloves,
Waste Management • House keeping helmet. and dust masks
• injury • Lifting techniques should also be used for waste that requires been lifted to the
• sharp edges
Site cleanup & waste materials • tripping hazard • Cut site Workers 3 3 9 Medium appropriate and available vehicle to be used for the exercise. 2 3 6 Medium Review at next opportunity 1 3 3 Low
• infection
removal • Dust
• Workers participating in the waste collecting should be cautious for:
• Sharp objects (glass, nails, metal pieces, etc.)
• obstacles to avoid tripping hazard.
• Proper Gloves should be used always