Date: 2021.10.02 Name: Aslam Parwez Position: HSE Officer Site: Work Site
Corrective Action: Boards are supported with transom every 1.2 meter.
Corrective Action: Informed foreman to install trap door, provided Green tag.
Procedure Ref. Template Title Template Ref. Rev Date
C110-01-X-HSE-PLN-0000-100155 Daily Observation Report DDAB-HSE-TMP-2006 B 20/11/2019
HEALTH, SAFETY & ENVIRONMENT
DATE: 2021.10.02 Report by: Aslam Parwez Position: HSE Officer Site: Work Site
Corrective Action: Inform the scaffolders about scaffolding safetyand Tag provided.
Brief Description: Missing edge protection might be someone fall from edge.
Corrective Action: Inform the concern foreman top provided edge protection.