Professional Documents
Culture Documents
Job Title: JSA for dismantling of Flare, Pipeline, Supporting structure, RCC
ANALYSIS PERFORMED BY:
works and blinding etc.
Job to be Executed By : Name: Designation
CONTRACTOR M/s Zeeco India Private Ltd. 1. Mr. K. V. Rao Project Manager ( Zeeco)
PMC M/s TKIS 2. Mr. Jayaraj Natarajan RCM ( Zeeco)
PROJECT M/s IOCL, Gujarat Refinery 3. Mr. Michael Agnael Planning Manager (Zeeco)
4. Mr. Dashrath Singh HSE (Zeeco)
5. Mr. Shanmugham .A RCM (TKIS)
6. Mr. Abdul Allam HSE (TKIS)
1. PTW system need to be followed and obtain prior to start the job.
Injury to working personal due to wrong approach 2. Ensure route survey and ground condition before starting movement of heavy
of shifting equipment.
3. Wearing of Personal Protective gear while in work areas is mandatory.
1 Mobilization and site Preparation
2-Sharp edges and sharp object. 2.Tool box Talks with team prior to job start.
3- Cuts ,nips due to unsafe and incorrect
3.Inform Client for approval before start the job.
handling of hand tools.
4. Workers shall keep loading way clear of slippery surface and any obstruction
4- Dust.
as much as possible.
Moblization and site Prepration Tools &
2 5- Personal Injury/ Insect Bite 5.Keep fingers away from pinch and shear points
Materials
6. Makesure the visual Inspection of every tools & tackles before using it.
7. During cleaning the materials use appropriate PPEs( dust mask,hand gloves &
safety goggle).
8. Before start the job using wood/ metal stick made some noise to keep away
insects.
9. Ensure Goodhousekeeping at site.
6 Positioning of Crane 1- Topling of crane 3-Ensure only SDP operator shall be engaged in Job.
4- Only Validated & certified by P&M, Cranes are used in site activity.
5.TPI certificate and Crane check list need to be verified and made available at
site.
1-Makesure use only validated,colourcoding & inspected(TPI Certified) Tools &
Tackle.
2-Ensure workers/riggers are trade validated and trained engaged in the job.
1- Failure of lifting Tools & Tackles 3- Only competent signalman to give signal.
1-Ensure workers / riggers are trade validated and trained engaged in the job.
2- Adequate PPE's shall be used. (Helmet, Safety Harness, Hand gloves,
1- Fall of material/Tools Rubber Goggles, Florescent Jacket, etc)
3- Proper access should be provided to work comfortably.
4- Trained Personnel shall carry out task of sharp or heavy tools for particular
task.
8 Manual material & Tools Shifting. 1.Maintain good housekeeping at site.
2- Ensure workers / riggers are trade validated and trained engaged in the job.
3- Adequate PPE's shall be used. (Helmet, Safety Harness, Cotton Hand gloves,
2- Personal injury
Rubber Goggles, Florescent Jacket, etc).
4- Provide appropriate Illumination at site.
5- Evaluate the weight & carrying capacity of the person before handling.
1.Approprate PPE's shall be used. (Helmet,Safety Harness, Hand gloves,
Goggles,Florescent Jacket
2.Ensure Tool box talk is being carried out about the execution of the jobs and
about right tools used by the worker and the hazards related to work at height.
7.TPI for man basket is required & SWL need to be mentioned on man basket.
1.Only trained persons are allowed to work on Man Lift the machine.
3.Working area should be barricaded and warning sign bords must be placed.
12.Only Crawler crane of varying capacity shall be used for man-basket lifting.
13.Ensure lifting and lowering speeds of man basket must not exceed 100 feet
(30.5 meters) per minute.
14.Ensure Wind Velocity must not exceed more than 7m/s.
1.Ensure workers / riggers / crane operator are trade validated and trained in
the engaged job.
2.Use of validated and inspected (TPI Certification) tools & tackles and crane /
2. Fall of man basket hydra for loading / unloading job.
3.Removal of unauthorized persons from the work place.
19 Blinding & hose connection/Flange opening 5. Work permit shall be taken from client before start the work.
9. Provision & ensure use of Life line & full body harness safety belt.