You are on page 1of 2

WORK METHOD STATEMENT

Description of the
Task / Activity Soil Protection at Tower 1
Created/ Modified August Caezar A. Lagat Date Modified Dec. 2, 2021
by
Manpower Required As needed
Heavy Equipment
1. Excavator
Tools and Equipment 2. Dozer
Required 3. Dump Truck
Hand Tools and Equipment
1. Welding machine
Average Output
(Manpower and Equipment)
Materials Required Sheet piles
(i.e. access platforms, winches, ladders, etc.)
Other Essential
Access platforms
Equipment
Specific Identified 1. Collapse of adjacent structures (Existing perimeter fence)
Residual Hazards 2. Collapse of existing slope protection (Sheet pile)
1. Construction occupational safety and health Training
Specific Staff Training
2. Excavation safety
Requirements
3. Construction machineries safety
Predecessor Activity N/A
1. Adjacent waterways shall be re-routed.
2. Shall berm a soil and gravel mix beside the creek walls to prevent
accumulation.
3. Waterways shall be cleared of any obstruction to maintain flow.
4. Shall berm soil of an estimated height of 6M at 45deg. angle beside the
leaning sheet pile to hold and prevent collapse.
5. Shall press berm with excavator bucket to ensure stability prior to access of
Work Method any equipment.
(Specifying methods of working, tools,
materials and equipment utilized) 6. Shall pull-out sheet leaning sheet pile.
7. Shall berm soil where the sheet pile was pulled-out.
8. Shall re-install sheet pile.
9. Adjust the berm outward the affected footing
10. Construction of cofferdam to enclose the footing foundations at STP area
a. Adjust berm outward until desired width have met.
b. Install sheet pile around the STP area.
c. Install waler and strut.
(If none, state none.)
Temporary Support 1. Scaffolding pipes
and Props needed to 2. Scaffolding swivel clamps
facilitate the works 3. platforms
(i.e. Guard Rails/ Toe Boards/ Brick Guards/ Safety Harnesses/ Exclusion Zones etc)
Fall Protection
1. Guard Rails
Measures
(Where work at height cannot be 2. Full body harness
eliminated – consider both Personnel
& Materials)
(i.e. Lubricants/ Solvents/ Flammable Materials/ Refrigerants/ Welding Gases etc)
Hazardous
1. Welding gases
Substances

Page 1 of 2
WORK METHOD STATEMENT
Very Toxic Harmful / Corrosive Dangerous Oxidizing Highly Explosive
Irritant for the Flammable
environment
Applicable (Y/N) N Y N N N Y N
(Detail any limits on the loading applicable to temporary plant/equipment or fixed elements of the structure where the work is taking place.)
Safe Working Load
Required Personnel Other:

Protective 1.
Equipment 2.
Safety Hard Hats Safety Hearing Respiratory Eye 3.
Boots Gloves Protection Protection Protection
Applicable (Y/N) Y Y Y N N Y
Emergency FIRE – When a fire occur, take the following action:
Procedures 1. Evacuate immediately at the closest exit.
2. When leaving the building, close all windows and doors. This will stop the
spread of fire.
3. If you encounter smoke, drop down to the floor and stay low until you
reach the exit.
4. When evacuating the building, always use the stairs, never use the elevator,
because power could be lost, trapping you on the floor of the fire.
5. If physically impaired, know your places of refuge. Please list places of
refuge for Physically Impaired personnel.
6. Meet a designated area, which should be at least 50 feet from building. Fill
in designated assembly area.

ACCIDENT – when an accident occur, take the following action:


1. Call emergency hotline immediately
2. Avoid leaving injured person(s) except to summon help.
3. Do not move the injured person(s).
4. Render First aid or CPR if you are trained and feel comfortable doing so.
5. Protect yourself before and after rendering assistance.

Prepared by:

August Caezar A. Lagat


EHS Head

Noted by: Approved by:

Engr. Gene C. Payumo Engr. Manuel L. Gorospe (PSE)


Project Manager President / CEO

Page 2 of 2