Rev:- 0011 JOB SAFETY ANALYSIS


GKR CONSTRUCTIONS
JSA No: PRJ/DRL/GKR/2024/0011

Name of the Project:-CTO- SEZ – ANT Date: 11\01\2024


Activity Description: CIVIL WORKS
SL TASKS INVOLVED POTENTIAL HAZARDS RECOMMENDATIONS
NO
01 * Excavation (Mechanical &Manual) * Damage of underground utility’s 1.Get necessary clearance as per DRL procedure from
facilities (Electrical/ IT/ Fire) department prior to start any excavation.

2.DRL valid work permit to be followed.


* Electric shock (in case presence 1.Insulated crow bars shall be used.
of live cable underground)
2.Mandatory PPE’s (Safety Helmet, safety shoes, Goggles,
Hand Gloves, Reflective Jacket) to be worn.

3.Good condition Job specific PPE's shall be used (Cut


resistant / rubber hand gloves & goggles )
* Injury due to fall of men & 1.Trained and experience operator to be deployed.
vehicles in to the excavated area
2.Trained and Experience person to be monitoring the
excavation work.

3.All excavated pit must be barricaded properly (hard


barricade)

4. No machinery or mobile equipment shall be positioned or


operated with in 2 meter the edge of excavation so that it can
endanger the life of person working inside excavated area.
* Injury to persons due to hit by the 1.Trained and experience operator to be deployed.
swinging part or moving vehicles
2.Trained and Experience person to be monitoring the

Project - Civil 1
CTO-SEZ

Rev:- 0011 JOB SAFETY ANALYSIS


GKR CONSTRUCTIONS
JSA No: PRJ/DRL/GKR/2024/0011

excavation work.

3.All excavated work area must be barricaded properly (hard


barricade)

4. Flagman should be available at work area.


* Injury Due to fall of materials / 1.Trained and Experience person to be monitoring the
rock while the work excavation work.

2.All excavated pit must be barricaded properly (hard


barricade)

3. All excavated materials shall maintain safe distance of 2m


from the edge of excavation work.

4. 1Mtr away hard barricaded

5.Operator health condition also checked for (DRL OHC


TEAM) and submitted eye test also.

* Collapse the soil 1. Trained and Experience person to be monitoring the


excavation work.

2.No machinery or mobile equipment shall be positioned or


operated with in 2 meter the edge of excavation so that it can
endanger the life of person working inside excavated area.

Project - Civil 2
CTO-SEZ

Rev:- 0011 JOB SAFETY ANALYSIS


GKR CONSTRUCTIONS
JSA No: PRJ/DRL/GKR/2024/0011

3.If the strength of soil is week excavation shall be carried out


at an angle of response of soil & stepping for access to be
provided to avoid the hazards.

4.Trenches 1.2 meter (4 feet) or deeper must be shored or


benched or sloped back to the angle.

5. When the depth of excavation is more than 1.5 meters,


properly designed shoring, and benching shall be placed on
each side.

6.All moving machine and vehicles shall maintain safe


distance of 2 meter form the edge of excavation or provide
necessary shuttering or shoring if required depending upon
the situation.

1.Inspect pumps and cords for defects, and repair or replace


as necessary prior to use.
*Electrical shock from
02 *De-watering Pumps/cords 2. Trained electrician must ground and connect 3phase
generators.

3.DO not lift electric pumps by cords.

4. Shut pumps off and allow them to cool before fueling.

5. Inspect hoses; Maintain hoses in good condition.

* Cave in over personnel 1.All excavated pit must be barricaded properly (hard

Project - Civil 3
CTO-SEZ

Rev:- 0011 JOB SAFETY ANALYSIS


GKR CONSTRUCTIONS
JSA No: PRJ/DRL/GKR/2024/0011

barricade)

2. Sign and Caution board to be displayed.


03 * Soil Loading & unloading * Heavy equipment topple due to
over load and improper access 1.Loading & unloading must be carried out properly.

2.Ensure proper access for men, material movement

3.overloading should not allowed.

4.Ensure traffic sign and posters at work area.

* Hit by Vehicles 1.workers were worn Reflective jacks & PPE's

2.Trained and experience operator to be deployed.

3.Ensure traffic sign and posters at work area.


04 * Injury to persons due to hit by the 1.Trained and experience operator to be deployed.
* Back filling of excavation swinging part or moving vehicles
2.Trained and Experience person to be monitoring the back
filing work.

3. Mandatory PPE’s (Safety Helmet, safety shoes, Goggles,


Hand Gloves, Reflective Jacket) to be worn

4. Flagman should be available at work area.


* Topple of dumper, tractor, truck in 1. Provide stopper on the edge of excavation to prevent
excavated area falling of dumper, tractor, truck in excavation.

2. involved dumper, tractor, truck must be equipped with

Project - Civil 4
CTO-SEZ

Rev:- 0011 JOB SAFETY ANALYSIS


GKR CONSTRUCTIONS
JSA No: PRJ/DRL/GKR/2024/0011

auditable reverse horns.

3. signal men will guide movement of dumper, tractor, truck


with whistles & signalling during the back filling.
05 * Hit by objects 1.Mandatory PPE’s (Safety Helmet, safety shoes, Goggles,
* Soling work Hand Gloves) to be worn.

2.Good condition Job specific PPE's shall be used (Cut


resistant / rubber hand gloves & goggles )

3.Trained and experienced person to be deployed the work.

4.Materials handing training to be given for all workers.

5. correct tools use for right job


* Improper Access 1.Sufficent height ladder should be ensured. Or suitable
06 * Inside excavation work below 1.2 M walkways ensured.

2. Without obstruction access to be ensured.


* O2 deficiency
1.Before start the work check the LEL & oxygen level.

2.A dedicated supervisor shall be monitoring the inside


excavation job.

3. DRL Valid work permit to be followed.

07 * Electrical shock 1.Power tools machine cable should be rotated through 30mA
* Shuttering / de Shuttering ELCB.

Using Wood cutting machine 2.Trained and experienced person to be deployed.

Project - Civil 5
CTO-SEZ

Rev:- 0011 JOB SAFETY ANALYSIS


GKR CONSTRUCTIONS
JSA No: PRJ/DRL/GKR/2024/0011

3.Double insulated machine and sleeve to be ensured at plug


and machine end.

4.A dedicated supervisor shall be monitoring the all work


activities.

5.Regular checks on cable management and avoid cable


sagging around power tools
* Unauthorized operation 1.Only authorized person used to the machine operation.

2.Power tools machine cable should be rotated through 30mA


ELCB
* Injury due sharp edge (protruding 1.All protruding nails should be bend or defiling to be
nails) ensured.

* Defective power tools 1. Before start the work tools to be checked.

2. Inspected & Valid tag tools to be used.

1.worn safety helmet, safety shoes, hand gloves (polymerized


* Flying partials rubber coated) safety goggles

1. Proper PPEs like safety shoes , safety helmet, hand gloves


* Injury due to sharp edge and goggles shall be used.
(Cut/crush Injury)
2. Cut resistance hand gloves to be worn

Project - Civil 6
CTO-SEZ

Rev:- 0011 JOB SAFETY ANALYSIS


GKR CONSTRUCTIONS
JSA No: PRJ/DRL/GKR/2024/0011

3. Trained and experienced person to be deployed.

4. Maintain the safe distance between body part and moving


machine.

08 * Shuttering and De shuttering work * Fall of person 1. Trained persons shall be engaged for the job.
at Height
2.Full body hardness should be used by all the workers and it
will be anchored at two suitable positions.

3. Before and after usage of powers tools to be check


Properly.
4.Guide rope to be maintained for shifting of iron plats
roll.
5.Surrounding area safety net provided.

6.Specific job training to be done supervisor vision the work.


.
7.Good condition tools to be use.

* Fall of materials 1.Use safety helmet, safety shoes, hand gloves (polymerized
rubber coated) safety goggles.

2.Proper working platform should be provided.

3.Proper stacking should be ensured.

4.After completion of job housekeeping to be done

* Improper stacking

Project - Civil 7
CTO-SEZ

Rev:- 0011 JOB SAFETY ANALYSIS


GKR CONSTRUCTIONS
JSA No: PRJ/DRL/GKR/2024/0011

1. Proper stacking should be ensured.

* Hit by object (Cut/crush Injury) 1.Only experienced person to be deployed.

2. Correct tools use for right job.

* Slip & Trip


1.Proper access and egress to be provided.

2.Maintain good housekeeping during the job.

3.Particular area should be barricaded to prevent any


unauthorized entry.

4. All electrical cable should be elevated properly


09 * Preparation of Reinforcement 1.Power tools machine cable should be rotated through 30mA
cutting by power tools * Electrical shock ELCB.
Cutting / bending work
Manual 2.Trained and experienced person to be deployed.

3.Double insulated machine and sleeve to be ensured at plug


and machine end.

4.A dedicated supervisor shall be monitoring the all work


activities.

5.Regular checks on cable management and avoid cable


sagging around power tools.

Project - Civil 8
CTO-SEZ

Rev:- 0011 JOB SAFETY ANALYSIS


GKR CONSTRUCTIONS
JSA No: PRJ/DRL/GKR/2024/0011

* Defective machine 1.The cutting and bending machine should have inspected by
authorized person.

2. Inspected & Valid tag tools to be used.

3. Tools to be checked by authorized person before work.

4.Not allow away man movement in front of cutting m/c.


5.Fitness of the cutting machine and blade.
* Hand & Foot injury 1. The worker should be use leather hand gloves & face
shield at work.

2.No person will be allowed in front of cutting area to stand.

3.Limit Switch will be in working condition. Protection guard


must be provided to be the cutting machine.

4.Trained and experienced person to be deployed.


5.Nose mask required PPE.

6.Bar cutting machine must be grounded properly and


Secured with proper shed protection.

7. Good supervision of all the controlled measures to be


Viewed and cutting wheel be monitored.

8.Goggles, Mask ,Ear Plugs and Gloves to be used.

9. Work floor to be maintained wet.


* Hit to person 1.The manual cutting and bending job is done by trained and
experienced person only.

Project - Civil 9
CTO-SEZ

Rev:- 0011 JOB SAFETY ANALYSIS


GKR CONSTRUCTIONS
JSA No: PRJ/DRL/GKR/2024/0011

2. Bar cutting machine will kept with firm support.

10 * Fixing of reinforcement * Cut of fingers at the time of 1.Use safety helmet, safety shoes, hand gloves (polymerized
binding rubber coated) safety goggles

1.Full body harness should be used by all workers and it will


* Fall of person be anchored at two suitable positions.
11 * Erection of scaffolding
2.Use all mandatory PPE's (Safety Helmet, safety Shoes,
goggles)

3. Only experienced scaffolder to be involved in scaffolding


erection work.

4.Check the availability of site safety Supervisor at site.

5.Check for training records of person working at site.

6.Use proper PPE to avoid objects slipping from hands or


Nets to trap the accident fall to objects
.
7. Usage of ladders working platforms.

8. Don’t carry any chemicals.

* Fall of materials 1.Carry tools in a gunny bag or tie the tools with rope.

2. Loose materials should not stack on elevated platform.

Project - Civil 10
CTO-SEZ

Rev:- 0011 JOB SAFETY ANALYSIS


GKR CONSTRUCTIONS
JSA No: PRJ/DRL/GKR/2024/0011

* collapse the scaffold or damaged 1.Provide base plate of standard dimension below every post.
materials
2.Lock the structure with permanent structure building.

3.provide sufficient number of cross bracing to support the


standard.

4.Scaffolding materials to in good condition.

5. Inspect the scaffolding materials before it is being used for


scaffolding.

6.Competent person to be checked scaffolding erection area.

7.Sole board and base plate to be provided if it is required.

* loose soil 1. check for all loose uneven surface and make it compact /
levelled

* Inexperienced scaffolder 1. excluding the scaffolder no person are allowed to engage


in scaffolding erection work.

1.Trained and experienced person to be deployed.


12 * Material stacking * Injury due to fall of materials
2. Proper stacking to be maintained and scrap materials is to
bee kept in tagged at scarp yard.

3.Materials handling to be in safe manner.

Project - Civil 11
CTO-SEZ

Rev:- 0011 JOB SAFETY ANALYSIS


GKR CONSTRUCTIONS
JSA No: PRJ/DRL/GKR/2024/0011

* hand injury due to pinching 1. Proper PPEs like safety shoes , safety helmet, hand gloves
and goggles shall be used.

2. Cut resistance hand gloves to be worn

* Fall of person on same level due 1.Proper access to be maintained for walking.
to trip hazard.

* Fall of person due to walking on 1.Fall of person due to walking on stacked materials
stacked materials fall of stacked materials.
fall of stacked materials.
2.All material must be stacking at designated area with
Proper heights.

3.All tools must be kept with tool kit.

13 * Dismantling of scaffold * Improper platform for dismantling 1.A dedicated person to be mentoring the work activity.
of scaffold
2.Trained and experienced person to be deployed.

* fall of person 1. Full body harness should be used by all workers and it will
be anchored at two suitable positions

2.platfrom should be provided for working at height and fBH


should be anchored all the times,

Project - Civil 12
CTO-SEZ

Rev:- 0011 JOB SAFETY ANALYSIS


GKR CONSTRUCTIONS
JSA No: PRJ/DRL/GKR/2024/0011

* Fall of materials 1. The area where dismantling takes place should be


barricaded and depute one person for communication to near
by area made.

2. Man chain is not acceptable to raise/lower the materials.


Rope or pulley should be used for materials handing.

3. No thronging of material should be allowed.

* Tools slippage while tightening & 1. Tools to be properly secured.


loosing of nut bolts

* scaffolding collapse 1. sequence of dismantling is to be followed.

* Collapse of wall 1. Only trained and experienced meson to be involved in wall


14 * Wall Construction construction work.

2. Wall to be in perpendicular shape for get the bearing


capacity maximum.

3. Width and height ratio of wall to be maintained.

* Fall of person 1. Full body harness should be used by all workers and it will
be anchored at two suitable positions.

Project - Civil 13
CTO-SEZ

Rev:- 0011 JOB SAFETY ANALYSIS


GKR CONSTRUCTIONS
JSA No: PRJ/DRL/GKR/2024/0011

2.platfrom should be provided for working at height and fBH


should be anchored all the times,

3. Proper PPEs like safety shoes , safety helmet, hand gloves


and goggles shall be used.

4. rubber hand gloves to be worn

1. Work are should be barricaded and sign board has to


* Fall of materials displayed.

15 * Plastering work 2. Man chain is not acceptable to raise/lower the materials.


Rope or pulley should be used for materials handing.

3. No thronging of material should be allowed.

4. proper working platform to be provided.

5.Skin deceases like (irritation, itching)

6.To be clean the eye properly in eye wash area.

7.While mixing of cement powder, must be worm nose mask


(PPE)
* Burns (Due to contact with 1. Follow MSDS for more precaution while handing
cement) chemicals.

2. Proper PPEs like safety shoes , safety helmet, hand gloves


and goggles shall be used.

Project - Civil 14
CTO-SEZ

Rev:- 0011 JOB SAFETY ANALYSIS


GKR CONSTRUCTIONS
JSA No: PRJ/DRL/GKR/2024/0011

3. rubber hand gloves to be worn

* Fall of person from height 1. Double lanyard safety full body harness with shock
absorber buckle hook to be used.

2. Proper working platform should be used.

* Slipping hazards (Working in wet 1. Gum boot to be provided.


condition)
2. During movement be careful.

16 * Pouring of concrete by manually / * Leakage of pipeline at joints & 1. Before staring the work operator will be check the concrete
concrete pump chocking of pipe line pump.

2. Shut to be rest and anchored properly from ground level.

3.The pipes should be jointed and disjoined by trained and


experienced person only.

4.Worker should not sit on pipe lines joints at the time of


concreting.

5. Concrete pump pipes to be inspected prior to start the job.

6. Area should be barricaded.

7. leak proof coupler to be provided at joints.

8. Ensured the close supervision.

Project - Civil 15
CTO-SEZ

Rev:- 0011 JOB SAFETY ANALYSIS


GKR CONSTRUCTIONS
JSA No: PRJ/DRL/GKR/2024/0011

9.Elephant trunk must be guide through rope


* Disposal of waste concrete 1. Waste concrete is to be kept in designated location.

* Eye Injury 1. Safety goggles to be worn.

17 * Compaction of concrete by electric * Electrical Hazard. 1. All cable must be routed through ELCB & its sensitivity
vibrator must be 30mA.

2. Vibrator base to be placed on insulated plate/ ply board

* Hit Injury 1. Use safety helmet safety / gum boot, hand gloves, &
goggles.

2. trained and experienced person to be operate the electrical


vibrator.
* Curing of concrete * Slip & fall of person water logging 1. Use safety helmet safety / gum boot, hand gloves, &
18 of surrounding area. goggles.

2.provision of edge protection at floors

3. Avoid the water logging of surrounding area.

4. Proper drain to be provided.

Project - Civil 16
CTO-SEZ

Rev:- 0011 JOB SAFETY ANALYSIS


GKR CONSTRUCTIONS
JSA No: PRJ/DRL/GKR/2024/0011

19 *Granite work *Eye injury due to bad posture. 1. Safety goggles must be used by the worker while
performing Granite/tile cutting activates.

2.Use all mandatory & job specific PPE.

3.Carry the granite and tiles safety or tie the tools with
Rope.
4.Loose materials should not stack on elevated platform.
*Fall of men and material.
5.Good condition hand tools to be provided.

6.Area also barricaded.

20 *Granite Loading and Unloading *Slip/trip 1.Good housekeeping to be ensured.

2.Proper access and egress has to be provided.


*Hand cutting .
3.Praticular area should be barricade to prevent any
Unauthorized entry.

4.Maintain good housekeeping during the job area should


Be clear from all types of obstruction.

5.Wastw tiles pieces to be removed from site location.

Project - Civil 17
CTO-SEZ

Rev:- 0011 JOB SAFETY ANALYSIS


GKR CONSTRUCTIONS
JSA No: PRJ/DRL/GKR/2024/0011

6. Maintain the safe distance between men & material.

7.Granite stacked properly on ground packing to be ensured.

8. All PPE are provided.

PREPARED BY : REVIEWED BY: APPROVED BY:


Signature
Signature Signature
Date & Time Date & Time Date & Time
JSA NO: