CTO-SEZ
excavation work.
Project - Civil 2
CTO-SEZ
* Cave in over personnel 1.All excavated pit must be barricaded properly (hard
Project - Civil 3
CTO-SEZ
barricade)
Project - Civil 4
CTO-SEZ
07 * Electrical shock 1.Power tools machine cable should be rotated through 30mA
* Shuttering / de Shuttering ELCB.
Project - Civil 5
CTO-SEZ
Project - Civil 6
CTO-SEZ
08 * Shuttering and De shuttering work * Fall of person 1. Trained persons shall be engaged for the job.
at Height
2.Full body hardness should be used by all the workers and it
will be anchored at two suitable positions.
* Fall of materials 1.Use safety helmet, safety shoes, hand gloves (polymerized
rubber coated) safety goggles.
* Improper stacking
Project - Civil 7
CTO-SEZ
Project - Civil 8
CTO-SEZ
* Defective machine 1.The cutting and bending machine should have inspected by
authorized person.
Project - Civil 9
CTO-SEZ
10 * Fixing of reinforcement * Cut of fingers at the time of 1.Use safety helmet, safety shoes, hand gloves (polymerized
binding rubber coated) safety goggles
* Fall of materials 1.Carry tools in a gunny bag or tie the tools with rope.
Project - Civil 10
CTO-SEZ
* collapse the scaffold or damaged 1.Provide base plate of standard dimension below every post.
materials
2.Lock the structure with permanent structure building.
* loose soil 1. check for all loose uneven surface and make it compact /
levelled
Project - Civil 11
CTO-SEZ
* hand injury due to pinching 1. Proper PPEs like safety shoes , safety helmet, hand gloves
and goggles shall be used.
* Fall of person on same level due 1.Proper access to be maintained for walking.
to trip hazard.
* Fall of person due to walking on 1.Fall of person due to walking on stacked materials
stacked materials fall of stacked materials.
fall of stacked materials.
2.All material must be stacking at designated area with
Proper heights.
13 * Dismantling of scaffold * Improper platform for dismantling 1.A dedicated person to be mentoring the work activity.
of scaffold
2.Trained and experienced person to be deployed.
* fall of person 1. Full body harness should be used by all workers and it will
be anchored at two suitable positions
Project - Civil 12
CTO-SEZ
* Fall of person 1. Full body harness should be used by all workers and it will
be anchored at two suitable positions.
Project - Civil 13
CTO-SEZ
Project - Civil 14
CTO-SEZ
* Fall of person from height 1. Double lanyard safety full body harness with shock
absorber buckle hook to be used.
16 * Pouring of concrete by manually / * Leakage of pipeline at joints & 1. Before staring the work operator will be check the concrete
concrete pump chocking of pipe line pump.
Project - Civil 15
CTO-SEZ
17 * Compaction of concrete by electric * Electrical Hazard. 1. All cable must be routed through ELCB & its sensitivity
vibrator must be 30mA.
* Hit Injury 1. Use safety helmet safety / gum boot, hand gloves, &
goggles.
Project - Civil 16
CTO-SEZ
19 *Granite work *Eye injury due to bad posture. 1. Safety goggles must be used by the worker while
performing Granite/tile cutting activates.
3.Carry the granite and tiles safety or tie the tools with
Rope.
4.Loose materials should not stack on elevated platform.
*Fall of men and material.
5.Good condition hand tools to be provided.