You are on page 1of 1

Job Safety Analysis Job: RCC/Brick Date:14.07.

2017 Analysis by: Reviewed by:


work dismantling

Title of employee doing job: Supervisor: Department: Civil Section: All users of Approved by:
Civil : GKR CONSTRUCTIONS D.Ramana dismantling works.

Required/Recommended PPE: Goggles, Safety shoe, Gloves, Helmet, Life line, Double lanyard safety belts and Safety net.
Potential Recommended Safe Job
Sequence of Basic Job Steps What Could Go Wrong Corrective Action
Hazards Procedure
1. Site inspection Electrical shock and Inspect and mark the Due to non visibility of structure Collect all structural drawing and
eye contact. dismantled area at site location. while dismantling a vibration can identify the dismantle area hazards
generate and weak in structure involved and if required strengthen a
chances to collapse. support from existing structure.

2. Scaffolding Fall injury Scaffolding to be laid for It is difficult to dismantle the Inspect the materials (Generally 40
dismantling of brick/RCC brick/RCC works without proper mm nominal bore heavy class pipes)
works if height is more than scaffolding in elevated height and of scaffolding for tightens and proper
1.80 M from ground level. there is a chance of fall from height. arrangement to be made as per
standards.

3. Machinery Power supply Electrocution Operate the power supply with Due to lose connections fire spark Proper ELCB control and cable to be
connection for breaking ELCB Control to the breaking can generate. arranged for breaking machine
machine. without any joints.

4. Check for conduit lines and Electrical shock and Proper precautions shall be Any energized such as water Check the concealed pipe lines, cable,
Complete information on the eye contact. taken to prevent accident to the pipelines, sewers, electrical conduit etc., before starting dismantling
structure. workmen engaged in system may cause for accidents works.
dismantling work.

5. Manual tools & tackles Electrical shock and Manual tools and tackles ie., If tools and tackles ie., hammer, Use proper insulated tools & tackles
eye contact. hammer, chisel etc., to be chisel etc., is not insulated due to un for manual dismantling works.
insulated properly. identified energized cable causes
electrical shock.

6. Dismantling of RCC/Brick Eye contact/Injury Wear all PPE- google, gloves, Dust accumulation, Striking A person working for dismantling job
work Fire insulated tools, nose mask, dismantled particles. should Wear all PPE.
helmet and safety belt if person Flammable Material chance to fire. Remove the Flammable Material in
is working on height if it more Work Area.
than @ 1.8Mts
Maintain Good House Keeping

7. Dismantled material shifting. Fall injury. Shift the dismantled material Chances to fall due to broken Clean the site and dismantled material
away from location and walks material of concrete/bricks in walk to be stored in identified place at site
ways. way. with proper barrication

Page 1 of 2