Sequence of Basic Job
Potential Hazards Recommended Safe Job What Could Go Wrong Corrective Action
Steps
1. Chipping holes for 1. Noise. 1. Use ear muffs, Dust mask and goggles 1. Not using proper PPE while carrying out the 1. Check for the availability of
the ground to protect from high noise, soft dust, and chipping activity may lead to chocking of required PPE in sufficient amount.
2. Dust.
hit to eyes through flying ground chips breath, irritation out of high noise, and hit
3.Flying stone chips. while drilling. injury to eyes.
2. Placing the steel on a 1. Fall or twist of 1. Flat background surface having almost 1. Fall of the sheet from the background 1. Required conditions to perform
flat surface. the sheet from having equal area of the sheet that is to surface on which sheet is placed by the job at workshop is to be
the surface. be cut. twisting and slipping. checked and ensured.
2. PPE – Safety Shoes, Goggles, Nose
mask, cut resistant gloves.
3.steel Cutting 1. Sharp objects 1. Use cutting machine and fix the 1. Cut injury out of sharp surface of blade. 1. Fitness of the steel cutting
(steel cutting cutting blade tightly. machine, blade. cutting machine
2. Flying pieces of blade if it accidentally
machine) to be checked.
2. Use hand held wall saw cutting breaks into pieces.
machine. 2. Availability of suitable PPEs to
3. Injury out of flying pieces of the steel rod
carry out job is to be checked.
3. Cut resistant gloves and Safety and dust.
glasses, nose mask, helmet and safety
shoe are to be used.
4. Dust 1. Dust Hazard 1. Always use nose mask. 1. Dust that comes out on cutting of rod 1. Availability and using of nose
removal/cleaning cutting may enter through nose by mask, ear plugs is to be checked
inhaling it, results in chocking & while perform the job.
irritation to nose.

5.Welding work 1.Electrical 1. Never permit spark, molten metal, 1.Fire can break up if any flammable liquid 1. Before doing welding activity
hazard/spark/fire excessive heat or flames to contact the present over there ensure LEL level of the
2.Exposure to flammable gas/liquid. 2. May lead person injury due to welding gas equipment/Pipe lines as per work
fumes /hazardous gas or hot sparks. permit procedure.
2. Clear all materials sticking to the
surface - Rust and other scale or 3. Rust and other products on surface of 2.Ensure usage of all Necessary PPEs.
products on surface of Equipment / Equipment / Pipe being welded can
3. Ensure proper supervision.
Pipe being welded. cause serious splatter.
3. Metal Slag to be chipped. Wait for the 4. Hot Slag chips tend to fly out in all
slag to be cooled and then chip. direction while removing.
6. Drilling holes for 1. Electric shock. 1. Electrical connection for the drilling 1. Electrical shock out of loose cables to 1. Check for the manual trip of ELCB
walls or to the ground machine is to be provided through drilling machine. that is used at job site.
2. Noise.
suitable rated ELCB.
2. Not using proper PPE while carrying out 2. Check for the availability of
3. Dust.
2. Use ear muffs, Dust mask and goggles the drilling activity may lead to chocking required PPE in sufficient amount.
4.Flying stone chips. to protect from high noise, soft dust, of breath, irritation out of high noise, and
and hit to eyes through flying ground hit injury to eyes.
chips while drilling.
7.Excavation Ground 1.Electrocution, Gas 1.Clearance to be taken from ESD 1.Fatality 1.Work to be started only after getting
Clearance 2.leak, Chemical department about the Pipelines, the clearance and Permit
Leak 2.Electrical lines laid from
underground and Excavated material
to be laid atleast 2mts away from
excavation
1.Electrocution 1.Experienced Driver to be appointed 1.Burns and Serious injuries 1.Work to be done only in a good
along with a flagman and overhead supervision and clear signages to
electrical lines to be given utmost care be displayed and no one to be
and to be placed on a firm ground allowed during JCB works
8.Area Barricading 1.Injury to 1.Area to be hard barricaded and display 1.Injury due to fall of objects hitting 1.Appropriate barricading and training
tresspassers. signages. tresspassers and nearby activity workers. to workers.
2.Obstruction to other 2Isolating the area with other
activities. activities.
9.Verifying the 1.TPC and Licence for the JCB and Driver 1.Reverse alarm and Amber light to be
Documents to be verified verified and all the permit
requirements to be followed
10.Working in Open 1.Radiation 1.Regular intervals to be given for workers 1.Sun burns and sun stroke 1Sun stroke awareness training shall
environment working in open environment be given. Regular intervals and
welfare facilities to be provided.
2.Inhalation of Dusts 2.Provided with Dust masks 2.Lung infections 2.Appropriate Dust PPE to be
provided.
11.Digging with Crow 1.Electrocution 2.All tools to be insulated and utmost care 1.Burns and Sparks 1.Appropriate PPE to be provided.
bar to be taken about underground
and Fence bar electrical lines and no one to be
allowed to move beyond the
barricading towards live transformers
12.Working with JCB 1.Toppling of 1.Human movement to be closed 1.Serious injuries 1.Debris to be stacked atleast 2mts
Equipment away from excavation
13.Verifying for Toxic 1.Fire Hazard and 1.Gases to be verified only by a long Probe 1.Collapse due to inhaling toxic gases and 1.Only trained person to be appointed
and Flammable gases 2.Health Hazard away from the opening Spark may take place for executing the work
14.Moving into 1.Fall Hazard, 1.Steps to be arranged for moving in and 1.Regular intervals to be taken 1.Area to be secured that no other
Excavated area Shoring boards to be perfectly particles fall into excavation
2.Fire Hazard ,
arranged
15.Dewatering 1.Physical Hazards 1.Electrical equipment to be double 1.Electrocution 1.Dust mask , Rubber gloves and
insulated and ELCB to be verified Shoes to be used