You are on page 1of 11

Project- Red H

Prepared by

Name inzamamul.y

Signature

Date 9/20/2020
Sr No Task/Activity

1.Cut injury
2.slip and trip hazard
1 Electrical tools
3.electrical hazard
4. foreign particle entering the eye

1. Electric Hazard
2. Rotating parts comig in contact
Cutting of wood/ply/mMDF of the body.
2 and aluminium pipes usind 3. Ergonomic hazard
cutter machine, 4. Foreign particles entering the
eye and nose
5. Damage to the ear

# Internal
1. Electric hazard
Fixing / drilling of aluminium 2. Fall from height
pipes ,framework, joinery and 3. Hand tool and powertools
3 wooden pieces using coming in contact of the body.
powertools and mobile 4. Fall of material
scaffolding 5.Foreign particcles entering the
eye and nose.

1. Chemicals entering the eye


Application of adhesives like 2. Chemicals coming in contact with
4
fevicol, aradite and silicon body
3. Environmental hazard

1. Fall of material
2. Broken glass pieces coming in
Fixing of glass on wooden
contact of body
5 surface and aluminium
3. Hand getting gaught while
partitions
placing glass
4. Trip Hazard

1. Panic situation.
2. Horseplay
6 Incase of any emergency 3. Rumour by worker
4. Electric shocks
5. Fire

# Internal
Work Done By Eleganz Interior Pvt Ltd
Project Manager- Ajay Sutar

# Internal
Work Risk assessment- Carpentry works

Project- Red Hat, level 3rd,Tower 6, magarpatta city pune

Reviewed by:

Type of Injury Present Control

1. All tools should be double insulated.


1.Electrocution 2. Physical condition should be good.
2.physical injury 3. Electrical tool cables should not be damaged or joints are not
3.Cut injury acceptable
4.dust inhalation 4. All electrical tool should use industrial top pin.
5. Inspection tag available.

1 .Permit to work to be issued before commencement of work.


2. All mandatory PPE's along with cut resistant gloves, ear
plugs, safety goggles and dust mask is necessary for this
activity
3. All power tools should be inspected.
1. Electrocution 4. All power tools should be routed through a 30mA ELCB.
2. Physical injury
5. Right posture should be attained while cutting or moving
3. Musko skeletel strains
4. Dust inhalation. wooden pieces.
5. Hearing impact to the ear. 6. Tool Box Talk to be conducted.
7.working area proper barricaded.
8.check electrical cable was not obstructed in any other work.
9.all working area maintain housekeeping.
10.Material proper storage as per location.
11.instruction follow as per wms.

# Internal
1. All mandatory PPE's along with cut resistant gloves, safety
goggles and dust mask is necessary for this activity.
2. All powertools should be inspected and tagged "SAFE'
before use, allso in powertools where provision of guards are
present the guards should be intact
1. Electrocution 3. All powertools should be routed through a 30mA ELCB.
2. physical injury 4. Handtools should be inspected and the damaged ones
3. Property damage
should be removed from the site.
4. Dust or particles settling in lungs1.
Electrocution 5. Mobile Scaffold must be inspected and tagged 'Safe' before
5. Property damage use
6. Dust or particles settling in lungs 6. Person must stand within the hand rails.
7. Castor brakes must be locked when scaffold is in use.
8. No worker should be on scaffold while its been moved.
9. Safety belt to be worn while working above 1.8m
10. Weight lifted by any person should not exceed 25kg at any
given point.

1. All mandatory PPE's along with safety goggles and rubber


gloves to be worn at all times.
2. Adhesives should be carried in small proportion to avoid
1. Eye injury
spillage.
2. Dermatitis or Skin infection
3. Contamination of eco system 3. Chemicals should be marked as hazardous at storage and
using point.
4. MSDS to be displayed at storage location and discussed with
workers

1. Load lifted should not exceed 25Kg/person


2. Safe distance to be mainted from line of fire while fixing
glass.
1. Physical inury 2. Acsess and work area should be clear from any obstructions
2. Caught in injury and housekeeping shoud be maintained
3. Glass vaccuum hoder should be used for fixing the glass on
wooden surface and aluminium partitions. 4.use full boday
clothing .

1. Physical injury 1. Trained First Aider to be available on site.


2. Fatality.
2. Emergency Response Procedures(ERP) to be implemented.
3. Electrocution
4. Burn injury 3. Training to all workers during induction.

# Internal
# Internal
try works

a city pune
Approved by:

Remark

S P RL Control Plan

S2 P1 SIG 100 % Supervission to be ensured.

S2 P1 SIG Area where activity is carried out to be barricaded

# Internal
S2 P3 SIG Area where activity is carried out to be barricaded

S2 P3 SIG 100% supervision to be ensured

S2 P3 SIG 100% supervision to be ensured

S1 P4 INS Emergency Response Procedures(ERP) to be followed

# Internal
# Internal
ADRIANSE

Responsib
S P RL
ility

Project
Manager
S1 P1 INS
and site
Engineer

Project
Manager
S1 P1 INS
and site
Engineer

# Internal
Project
Manager
S2 P4 INS
and MEP
Engineer

Project
Manager
S2 P1 INS
and site
Engineer

Project
Manager
S1 P1 INS
and site
Engineer

Project
Manager
S1 P1 INS
and Safety