Sr No Task/Activity
1.Cut injury
2.slip and trip hazard
1 Electrical tools
3.electrical hazard
4. foreign particle entering the eye
1. Electric Hazard
2. Rotating parts comig in contact
Cutting of wood/ply/mMDF of the body.
2 and aluminium pipes usind 3. Ergonomic hazard
cutter machine, 4. Foreign particles entering the
eye and nose
5. Damage to the ear
# Internal
1. Electric hazard
Fixing / drilling of aluminium 2. Fall from height
pipes ,framework, joinery and 3. Hand tool and powertools
3 wooden pieces using coming in contact of the body.
powertools and mobile 4. Fall of material
scaffolding 5.Foreign particcles entering the
eye and nose.
1. Fall of material
2. Broken glass pieces coming in
Fixing of glass on wooden
contact of body
5 surface and aluminium
3. Hand getting gaught while
partitions
placing glass
4. Trip Hazard
1. Panic situation.
2. Horseplay
6 Incase of any emergency 3. Rumour by worker
4. Electric shocks
5. Fire
# Internal
Work Done By Eleganz Interior Pvt Ltd
Project Manager- Ajay Sutar
# Internal
Work Risk assessment- Carpentry works
Reviewed by:
# Internal
1. All mandatory PPE's along with cut resistant gloves, safety
goggles and dust mask is necessary for this activity.
2. All powertools should be inspected and tagged "SAFE'
before use, allso in powertools where provision of guards are
present the guards should be intact
1. Electrocution 3. All powertools should be routed through a 30mA ELCB.
2. physical injury 4. Handtools should be inspected and the damaged ones
3. Property damage
should be removed from the site.
4. Dust or particles settling in lungs1.
Electrocution 5. Mobile Scaffold must be inspected and tagged 'Safe' before
5. Property damage use
6. Dust or particles settling in lungs 6. Person must stand within the hand rails.
7. Castor brakes must be locked when scaffold is in use.
8. No worker should be on scaffold while its been moved.
9. Safety belt to be worn while working above 1.8m
10. Weight lifted by any person should not exceed 25kg at any
given point.
# Internal
# Internal
try works
a city pune
Approved by:
Remark
S P RL Control Plan
# Internal
S2 P3 SIG Area where activity is carried out to be barricaded
# Internal
# Internal
ADRIANSE
Responsib
S P RL
ility
Project
Manager
S1 P1 INS
and site
Engineer
Project
Manager
S1 P1 INS
and site
Engineer
# Internal
Project
Manager
S2 P4 INS
and MEP
Engineer
Project
Manager
S2 P1 INS
and site
Engineer
Project
Manager
S1 P1 INS
and site
Engineer
Project
Manager
S1 P1 INS
and Safety
Officer
# Internal