You are on page 1of 1

BHATE & RAJE CONSTRUCTION CO.PVT.

LTD

GAS CUTTING CHECKLIST


FREQUENCY - WEEKLY REFERENCE.NO: BRCCPL/EHS/529/REV-0

4 5
2

7
1 6

8 3

Contractor Name Machine No MONTH

WEEK - 1 WEEK - 2 WEEK - 3 WEEK - 4 WEEK - 5


SL NO DESCRIPTION REMARKS

√/x √/x √/x √/x √/x

Protective valve cap firmly fixed for both


1 cylinder(Check for damage/crack in the valve
cap)

Pressure gauges two for each cylinder(inlet &


2 out)are in working condition(both Oxygen &
Acetylene gas)

Flash back arrestor (FBAs) is provided for


3
acetylene & oxygen cylinders.

Non return valves (NRVs) is provided for both


4
acetylene & oxygen cylinders.

5 Tight Crimping of hoses with jubilee clamps.

6 Hose free from damage(cut and cracks )

7 Cylinder secured by chain to the trolley.

8 Trolley tyre shall be free from damages.

Availability of industrial type lighter(no match box


9
/ commercial lighters).
Cutting area Should be barricaded and warning
10 boards to be displayed.

Cutting area shall be free from debris and


11 flammable materials.

Availability of PPE (Cutting Goggles, Leather


12 gloves Etc.)

Checked by BRCCPL safety in charge

You might also like