PRE-ENTRY HOIST INSPECTION CHECKLIST

Project Name :
Contractor Name: Docoument No Date

S.No. CHECK POINT YES NO


1 Wire ropes, Hook block, sheaves

2 Guides & Guide rollers

3 Foundation & shock absobers

4 Main Hoist motor

5 Brakes & Suspensions, Hydraulic System

6 Safe Load Indicator/buzzer

7 Fuse protection

8 Gap between landing and cage platform

9 Limit switches at each level

10 Fall arrest rope condtion

11 Interlocks of landing gate and cage gates

12 Display of SWL & No.of persons

13 Condition of supports with structure

Condition of switch board, light & fan in the


13 cage/cabin
Name Signature
Checked by contractor safety incharge
Name Signature
Checked by FABS/HSE Department
BHATE & RAJE CONSTRUCTION CO.PVT.LTD

HOIST CHECKLIST
FREQUENCY - WEEKLY REFERENCE.NO:BRCCPL/EHS/521/REV-0

Contractor Name Docoument No Date

S.No. CHECK POINT YES NO Remark

1 Wire ropes, Hook block, sheaves

2 Structure frame & dead weights

Main Hoist motor


4

Brakes & Suspensions, Hydraulic System


5

Condition of limit switches


6

Fuse protection
7

Condition of platform
8

Condition of castor wheels of platform


9

proper access to reach the credle


10

Tilt mechanism & fall arrest


11

Display of SWL & No.of persons


12

Availability of safety harness


13
Name Signature
Checked by BRCCPL safety incharge
PRE-ENTRYTOWER CRANE INSPECTION CHECKLIST

Project : Machine No :

Contractor Name Docoument No Date

S.No. CHECK POINT YES NO

1 Wire ropes, Hook block, sheaves

2 Boom / Jib

3 No.of Mast Sections & Condition of foundation

4 Main Hoist Winch, Trolley Winch

5 Brakes & Suspensions, Hydraulic System

6 Safe Load Indicator/buzzer, Radius Indicator

Level Indicator & controls

7 Duty Load Chart in Cabin

8 Hoist Limit Switch

9 Trolley Limit Switch

10 Overload Limit Switch

Slewing Limit Switcch

11 Electrical Installations & Focus Lights in the boom

12 Aviation Light

13 Chain Slings with Locks

Name Signature
Checked by contractor safety incharge
Checked by contractor safety incharge

Name Signature
Checked by FABS/HSE Department
IST

Date

Remark