AL-AHLEIA SWITCHGEAR CO.

, KUWAIT
S.R. No. ETF-38
PO No. :
CLIENT: KUWAIT NATIONAL PETROLEUM CO, SITE : CFP-150
0-6798- PJ2181-019-A1

Project no. -- REVISION : 0 DATE : /09/16 PAGE : 1/1

EQUIPMENT No. :
CHECKLIST FOR DISTRIBUTION PANEL

Sl. No. CHECK PARAMETERS RESULTS

1 Tightness of Hardware’s
2 Door Alignment / Locks
3 Labels / Name Plates
4 Earth Bus bar
5 Wires and Ferrules
6 MCCB / MCB
7 Auxiliary Relays
8 Indication Lamps and Selector switch
9 Control Switches
10 Thermostat
11 Space Heaters/Lighting Circuit
12 Verification as per GA & Schematic Drawings
13 Functional Tests as per Schematic Drawings
a)Check of indication circuits

TESTED BY WITNESSED BY
Al Ahleia JGC KNPC

Name G.KAMAL

Signature

Designation ENGINEER

Date /09/16