CLMB PROJECT
AIR COMPRESSOR PRE START INSPECTION CHECKLIST
Project/Site :
Date of Inspection :
S/N of equipment :
Contractor :
Location of inspection :
No Description Good Fair Poor N/A Remarks
1 General condition
2 Insulation system of exhaust
3 ESD system
4 Hose and Connector
5 Drain pot, water/oil trap
6 Air relief valve/PSV (Certified by third party)
7 Safety guarding system
8 Battery Covered
9 Engine and fuel system leaks
10 Lifting point/pad eye condition (certified)
11 Fire extinguisher (stand by when use)
12 Anti-whip syste,
13 Maintenance logbook/Daily check logbook
14 Sticker inspection
Comments
Inspected by HSE Subcontractor Acknowledged by HSE TPEC
Name : Name :
Position : Position :
Sign : Sign :