You are on page 1of 1

BHATE & RAJE CONSTRUCTION CO.PVT.

LTD

Full Body Harness Checklist


FREQUENCY: WEEKLY REFERENCE.NO: BRCCPL/EHS/531/REV-0

Project Name :-

Date of inspection: Next Date of Inspection :-

No. Of Full Body Harness Checked :-

DETAILS OF INSPECTION

Parameters WEEK 1 WEEK 2 WEEK 3 WEEK 4 Remarks

1. Full body is in a good condition


do not have cut, tear, swollen

or crack.
2. Clip lock at the chest and leg

are in a good condition.


3. D-RING do not have rust or
bend.
4. Lanyard do not damage or
tear.
5. Shock absorber is in a good

condition and covered.

6. Snap hook are in a good


condition such as bending,
twisting, increased throat
opening, crack, nick and
inoperative latches.

7. Full Body Harness should be ISI

marked

8. Locking arrangement of hooks

9. Rope condition

Checked By BRCCPL Safety Incharge