EE 185, 5 TON CRANE INSPECTION REPORT

As per OSHA Regulations, prior to initial use each day, the crane in EE 185 MUST be inspected by the operator. A complete inspection should also include observation
during operation to detect any defects that might appear between regular inspections. In the chart below, each area of inspection is identified by an item number
The frequency of inspection indicated under "Inspection Frequency." The two columns on the right are for noting the condition of the items after inspection.
The chart on the bottom of this page has a column number for item numbers. In this column, place the item numbers requiring attention, and fully describe the hazard
and the recommended corrective action.
Type of Crane Crane Capacity Main Hoist Capacity - Tons
Bridge 5 Ton 5 ton
Item Inspection Frequency Part of Crane Hazards to look for OK See
Daily Monthly to be Inspected Back
1 Controls & operating mechanisms Improper adjustment or excessive wear on
pendulum assembly. Inspect load chain
Deformed or cracked hook or crane block.
2 Hooks 15% in Excess of normal throat opening.
Hook bent or twisted more than 10%.
Excessive wear over 1/3 of original diameter of
rope. 6 broken wires in any one lay.
3 Chains and End Connections Reduction from nominal diameter of no
more than 1/32 inch for 3/8 inch rope.
Kinking, crushing, bird caging or other
visible damage, or evidence of heat damage.
4 Hoist Drum Winds properly, no skipping or overlaping.
5 Trolley Wiring (festoon) Collects evenly, moves freely, hangs properly.
6 Bridge Structure Look for any items that may fall off.
For Cranes not in regular use
Condition MInspection Requirement
All daily inspection procedures
1 Idled 1 month or more but less than 6 months Thorough inspection of ropes
Written and dated report on condition of ropes
All daily inspection procedures
2 Idled 6 months or more Thorough inspection of ropes
Written and dated report on condition of ropes
3 Standby crane Same as Condition 1, inspected at least semi-annualy

INSPECTOR"S REPORT M
Item Corrective Action Required (Urgency of recommended action noted below chart)

Urgency of Recommended action:


1. Stop use of crane until repairs are completed for items:
2. Repair items: by: / / /
3. Order repair parts for items: .Reinspect when parts are received.

Signature of Inspector Date Approved by Date