Page 27 of 33
PHASE 1: INDUCTION
DURATION
NR SUB-TASK CREW SIZE
(HOURS)
1 Review aircraft AFTO FORM 781 Series Current 3 4
Inspection and Acceptance of aircraft Jacket content
Review of Historical Record (AFTO Form 95)
Validation of LTIR and initial MRRL
Consolidation of Initial MRRL
fueL system
DURATION
NR SUB-TASK CREW SIZE
(HOURS)
1 Installation of LH/RH Wing Fuel Tank Assy 3 4
2 Installation of LH/RH Wing Tip Fuel Tank Assy 3 4
3 Installation of Booster Pump Assy 2 0.5
4 Installation of Fuel Strainer Assy 2 0.5
5 Installation of Fuel Selector Valve Assy 1 1
6 Installation of Fuel Shut-off Valve Assy 1 1
7 Connection of LH/RH Fuel Tank Vent Lines 3 1
8 Connection of LH/RH Wing Tank Fuel Suction lines 1 1
9 Connection of LH/RH Wing Tip Tank Fuel Suction lines 3 1
10 Connection of Fuel Suction lines to Fuel Selector Valve 1 0.5
11 Connection of Fuel lines from selector valve to shut-off valve 1 0.5
12 Connection of fuel lines from shut-off valve to strainer 1 0.5
13 Connection of fuel lines from strainer booster pump 1 0.5
14 Connection of fuel lines from booster pump to engine fuel pump 2 0.5
15 Connection of Fuel lines from strainer to engine fuel pump 1 0.5
15 Tightness Test/Leak Test/powered Leak test 2 4
TOTAL 28 21
WING ASSY INSTALLATION
DURATION
NR SUB-TASK CREW SIZE
(HOURS)
1 insert the main spar of wing panel in the fuselage 7 1
Secure the main spar to the other main spar installing the spar
4 8
2 interconnecting upper and lower plate
installation of FWD/AFT attaching bolt and wing to fuselage
4 4
3 attaching support
TOTAL 15 13
REMARKS
REMARKS
REMARKS
REMARKS
REMARKS
REMARKS
REMARKS