MRRL
APG

LINE ITEM REMARKS


PART NUMBER NOMENCLATURE
ITEM NR QTY U/I
Fig. 1 Fuel Storage System CHAPTER 28-10-00
c 1 SF-260-16-02-125 TANK ASSY, WING FUEL, LH 1 EA
1 SF-260-16-02-126 TANK ASSY, WING FUEL, RH 1 EA
2 SF-260-16-05-207 TANK ASSY, WING TIP TANK, LH 1 EA
2 SF-260-16-05-208 TANK ASSY, WING TIP TANK, RH 1 EA
Fig. 1 Wing Fuel Tank Assy CHAPTER 28-10-01
6 55638 CAP ASSY, FILLER 2 EA
7 SM2571 COCK DRAIN 2 EA
8 SF-260-26-527-03 STRAINER,TANK OUTLET 2 EA
9 M83248/1-029 PACKING, ORING 2 EA
Fig. 1 Wing Tip Fuel Tank Assy CHAPTER 28-10-02
6 SF260-16-268-07 CAP ASSY, FUEL FILLER 2 EA
7 417-20-6 CHAIN, FILLER CAP RETAINER 2 EA
8 3503002 RING, FILLER CAP CHAIN 2 EA
9 NS0A261-1 VALVE, DRAIN 2 EA
10 M83248/1-118 PACKING, ORING 2 EA
11 SF260-16-308-01 COCK, DRAIN ASSY 2 EA
12 2075 GASKET, DRAIN 2 EA
Fig. 1 Fuel Tank Vent System CHAPTER 28-11-00
1 SF260-01-63-17 HOSE, TANK VENT (5 inches long) 2 EA
2 AN737TW24 CLAMP, TANGENTIAL 12 EA
3 SF260-10-63-11 LINE,TANK VENT, LH 1 EA
3 SF260-10-63-12 LINE,TANK VENT, RH 1 EA
4
6
7
8
9
10
11
12
13
14
15
16
17
Page 2 of 33
Page 3 of 33
Page 4 of 33
Page 5 of 33
Page 6 of 33
Page 7 of 33
Page 8 of 33
Page 9 of 33
Page 10 of 33
Page 11 of 33
Page 12 of 33
Page 13 of 33
Page 14 of 33
Page 15 of 33
Page 16 of 33
Page 17 of 33
Page 18 of 33
Page 19 of 33
Page 20 of 33
Page 21 of 33
Page 22 of 33
Page 23 of 33
Page 24 of 33
Page 25 of 33
Page 26 of 33

UH-1H 917
UH-1H 917
UH-1H 917
UH-1H 917

UH-1H 917

UH-1H 917
UH-1H 917
UH-1H 917

UH-1H 917
UH-1H 917
UH-1H 917
UH-1H 917
UH-1H 917
UH-1H 917
UH-1H 917
UH-1H 917

UH-1H 917
UH-1H 917
UH-1H 917
UH-1H 917

UH-1H 917
UH-1H 917
UH-1H 917
UH-1H 917
UH-1H 917
UH-1H 917

UH-1H 917
UH-1H 917
Page 27 of 33

wrong figure uhm


wrong figure uhm
wrong figure uhm
wrong figure uhm
wrong figure uhm
wrong figure uhm
wrong figure uhm
wrong figure uhm
wrong figure uhm
wrong figure uhm
3000 HRS INSPECTION PACKAGE OF SF 260FH

PHASE 1: INDUCTION
DURATION
NR SUB-TASK CREW SIZE
(HOURS)
1 Review aircraft AFTO FORM 781 Series Current 3 4
Inspection and Acceptance of aircraft Jacket content
Review of Historical Record (AFTO Form 95)
Validation of LTIR and initial MRRL
Consolidation of Initial MRRL

PHASE 2: IRAN Phase


DURATION
NR SUB-TASK CREW SIZE
(HOURS)
1 Review aircraft AFTO FORM 781 Series Current 3 4
Inspection and Acceptance of aircraft Jacket content
Review of Historical Record (AFTO Form 95)
Validation of LTIR and initial MRRL
Consolidation of Initial MRRL

fueL system
DURATION
NR SUB-TASK CREW SIZE
(HOURS)
1 Installation of LH/RH Wing Fuel Tank Assy 3 4
2 Installation of LH/RH Wing Tip Fuel Tank Assy 3 4
3 Installation of Booster Pump Assy 2 0.5
4 Installation of Fuel Strainer Assy 2 0.5
5 Installation of Fuel Selector Valve Assy 1 1
6 Installation of Fuel Shut-off Valve Assy 1 1
7 Connection of LH/RH Fuel Tank Vent Lines 3 1
8 Connection of LH/RH Wing Tank Fuel Suction lines 1 1
9 Connection of LH/RH Wing Tip Tank Fuel Suction lines 3 1
10 Connection of Fuel Suction lines to Fuel Selector Valve 1 0.5
11 Connection of Fuel lines from selector valve to shut-off valve 1 0.5
12 Connection of fuel lines from shut-off valve to strainer 1 0.5
13 Connection of fuel lines from strainer booster pump 1 0.5
14 Connection of fuel lines from booster pump to engine fuel pump 2 0.5
15 Connection of Fuel lines from strainer to engine fuel pump 1 0.5
15 Tightness Test/Leak Test/powered Leak test 2 4
TOTAL 28 21
WING ASSY INSTALLATION
DURATION
NR SUB-TASK CREW SIZE
(HOURS)
1 insert the main spar of wing panel in the fuselage 7 1
Secure the main spar to the other main spar installing the spar
4 8
2 interconnecting upper and lower plate
installation of FWD/AFT attaching bolt and wing to fuselage
4 4
3 attaching support
TOTAL 15 13

AILERON CONTROL SYSTEM


DURATION
NR SUB-TASK CREW SIZE
(HOURS)
build-up of control stick assy 2 4
Intln of Control Stick Assy 2 2
Instln of Control Cables 2 4
Instln of Belcranks and Rod Assy 2 2
Instln of Pulleys 2 1
Instln of Aileron Assy LH/ RH 2 2
Rigging Of Aileron Control System 3 8
Securing of Turnbuckles 2 2
TOTAL 17 25

ELEVATOR CONTROL SYSTEM


DURATION
NR SUB-TASK CREW SIZE
(HOURS)
Installation of Elevator Assy 3 2
Installation of Control Cables and Faileads 2 2
Installation of Pulleys 2 2
Rigging of Elevator Control System 2 8
Securing of Turnbuckles 2 2
TOTAL 11 16

ELEVATOR CONTROL SYSTEM


DURATION
NR SUB-TASK CREW SIZE
(HOURS)
Installation of Elevator Assy 3 2
Installation of Control Cables and Faileads 2 2
Installation of Pulleys 2 2
Rigging of Elevator Control System 2 8
Securing of Turnbuckles 2 2
TOTAL 11 16
RUDDER CONTROL SYSTEM
DURATION
NR SUB-TASK CREW SIZE
(HOURS)
Installation of Rudder Assy 3 2
Installation of Rudder Pedal Assy 2 2
Installation of Control Cables and Faileads 2 3
Installation of Pulleys 2 2
Rigging of Elevator Control System 2 8
Securing of Turnbuckles 2 2
TOTAL 13 19
PROGRAMMED PERCENTAGE BY MAN-HOUR PERCENTAGE OVERALL
MAN-HOUR PHASE ACCOMPLISHED ACCOMPLISHED PERCENTAGE
12 #DIV/0! 12 100.00% #DIV/0!

PROGRAMMED PERCENTAGE BY MAN-HOUR PERCENTAGE OVERALL


MAN-HOUR PHASE ACCOMPLISHED ACCOMPLISHED PERCENTAGE
12 400.00% 12 100.00% 400.00%

PROGRAMMED PERCENTAGE BY MAN-HOUR PERCENTAGE OVERALL


MAN-HOUR PHASE ACCOMPLISHED ACCOMPLISHED PERCENTAGE
12 25.81% 12 100.00% 25.81%
12 25.81% 0.00% 0.00%
1 2.15% 1 100.00% 2.15%
1 2.15% 1 100.00% 2.15%
1 2.15% 1 100.00% 2.15%
1 2.15% 1 100.00% 2.15%
3 6.45% 1 33.33% 19.35%
1 2.15% 0.5 50.00% 4.30%
3 6.45% 0.00% 0.00%
0.5 1.08% 0.5 100.00% 1.08%
0.5 1.08% 0.5 100.00% 1.08%
0.5 1.08% 0.5 100.00% 1.08%
0.5 1.08% 0.5 100.00% 1.08%
1 2.15% 0.00% 0.00%
0.5 1.08% 0.00% 0.00%
8 17.20% 0.00% 0.00%
46.5 100.00% 0.00% 62.37%

PROGRAMMED PERCENTAGE BY MAN-HOUR PERCENTAGE OVERALL


MAN-HOUR PHASE ACCOMPLISHED ACCOMPLISHED PERCENTAGE
7 12.73% 7 100.00% 12.73%
32 58.18% 16 50.00% 29.09%

16 29.09% 0 0.00% 0.00%


55 100.00% 0 0.00% 41.82%

PROGRAMMED PERCENTAGE BY MAN-HOUR PERCENTAGE OVERALL


MAN-HOUR PHASE ACCOMPLISHED ACCOMPLISHED PERCENTAGE
8 13.79% 0 0.00% #DIV/0!
4 6.90%
8 13.79% 0.00% 0.00%
4 6.90% 0 0.00% #DIV/0!
2 3.45% 0 0.00% #DIV/0!
4 6.90% 0 0.00% #DIV/0!
24 41.38% 0 0.00% #DIV/0!
4 6.90% 0 0.00% #DIV/0!
58 100.00% 0.00% #DIV/0!

PROGRAMMED PERCENTAGE BY MAN-HOUR PERCENTAGE OVERALL


MAN-HOUR PHASE ACCOMPLISHED ACCOMPLISHED PERCENTAGE
6 17.65% 0 0.00% #DIV/0!
4 11.76% 0 0.00% 0.00%
4 11.76% 0 0.00% #DIV/0!
16 47.06% 0 0.00% #DIV/0!
4 11.76% 0 0.00% #DIV/0!
34 100.00% 0.00% #DIV/0!

PROGRAMMED PERCENTAGE BY MAN-HOUR PERCENTAGE OVERALL


MAN-HOUR PHASE ACCOMPLISHED ACCOMPLISHED PERCENTAGE
6 17.65% 0 0.00% #DIV/0!
4 11.76% 0 0.00% 0.00%
4 11.76% 0 0.00% #DIV/0!
16 47.06% 0 0.00% #DIV/0!
4 11.76% 0 0.00% #DIV/0!
34 100.00% 0.00% #DIV/0!

PROGRAMMED PERCENTAGE BY MAN-HOUR PERCENTAGE OVERALL


MAN-HOUR PHASE ACCOMPLISHED ACCOMPLISHED PERCENTAGE
6 15.00% 2 33.33% 5.00%
4 10.00% 0 0.00%
6 15.00% 0 0.00% 0.00%
4 10.00% 0 0.00% #DIV/0!
16 40.00% 0 0.00% #DIV/0!
4 10.00% 0 0.00% #DIV/0!
40 100.00% 0.00% #DIV/0!
REMARKS

REMARKS

REMARKS

REMARKS
REMARKS

REMARKS

REMARKS

REMARKS