DRL - PROJECT

CHECK LIST FOR GAS CUTTING SET

Project Name: Gas Cutting Equipment No.:


Contractor Name: Inspection Date:
Equipment Specs.: Next Inspection Date:

3 5
2

6 7
1

8 4

SR SR
NO
CHECK ITEM PHOTOS YES / NO NO
CHECK ITEM PHOTOS YES / NO

Pressure gauges two


Protective valve
for each cylinder
cap firmly fixed for
(inlet & out) are in
1 both cylinder 2
working condition
(Check for damage /
(both Oxygen &
crack in the valve
Acetylene gas)
cap)

Flash back Non return valves


arrestor (FBAs) is (NRVs) is provided
3 4
provided for for both acetylene &
acetylene & oxygen cylinders.
oxygen cylinders

Hoses free from


Hose tight damage (cut and
5 6
with jubilee cracks ) &
clamp different colour
are in use.

Cylinder secured Trolley tire shall be


7 8
by chain to the free from
trolley. damages.

Availability of
industrial type
9 lighter (no match 9 Others
box /
commercial
lighters).
Name Signature Date
Checked by Contractor Safety Officer

CBRE Reviewed Accepted…………………….. Rejected………………………………………………….


Name Signature Date
Checked by CBRE / DRL

DRL/HYD-RO/GCS-05/REV- 01/01ST FEB 2016