You are on page 1of 1

BIPL RANJANGAON, PROJECTS - 2014

Weekly Checklist For Excavator

Contractor Name Machine No Date Month


EVIO Pvt. Ltd.
SL NO DESCRIPTION WEEK-1 WEEK-2 WEEK-3 WEEK-4 WEEK-5 REMARKS

1 Front & reverse horn

2 Head & tail lamps(for working at night)

3 Lakage of oil(in hydraulic & pneumatic systems)

4 Loose bolts /connecting pins(bucket)

5 Back view mirror

Roller-crawler / tyre condition (check for


6
damaged / missing idle rollers)

7 Structure beem condition(damage,cut,crack)

8 Diesel, oil and grease spillage.

9 Licensed operator (heavy licence)

10 Fire extinguisher in operator cabin

Checked by contractor Safety Officer Authorised By Consultant Safety Officer